EVELIS بيردومو, Senior Petrophysicist

EVELIS بيردومو

Senior Petrophysicist

Weatherford - Iraq

البلد
أسبانيا
التعليم
ماجستير, Project Manager
الخبرات
15 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 1 أشهر

Senior Petrophysicist في Weatherford - Iraq
  • العراق - البصرة
  • يوليو 2018 إلى أبريل 2020

I was in charge of Casing integrity analysis Multi Finger Caliper (MSC, MIT), Multithickness and Electromagnetic defectoscope Interpretation, using PIPSPro and Secureview, I worked also in production Logging test analysis and Multi Array tools (MAPS) for conventional and horizontal wells, for wells in Rumailah field

Project Manager في Coral Petroleum Group
  • أسبانيا
  • مارس 2017 إلى فبراير 2018

I managed the commercial team and the different Projects on OIL & GAS and energy in Compliance with current regulations. I also generated and closed commercial agreements and partnerships with different companies. My duties included: lead the sales team, process clients and providers requirements, establish the new markets strategy, coordinate and monitor projects and manage clients and suppliers portfolio.

Reservoir Engineer في Baker Hughes
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2015 إلى مارس 2016

My duties included, water flood monitoring, water management, relative permeability analysis for rock typing integrated studies. Also provided support in log interpretation to get a better data understanding.

Geoscientist في Baker Hughes
  • العراق - البصرة
  • نوفمبر 2012 إلى ديسمبر 2015

In charge of the log interpretation for production logging tools conventional and horizontal wells, saturation logs analysis, segmented bond tools analysis, corrosion logs analysis (Multifinger Caliper and magnetic thickness tools) in Rumailah oilfield located in Basra Iraq.

Reservoir Engineer في DrillVer
  • المكسيك
  • مارس 2012 إلى أغسطس 2012

Responsible of analyze fields production and reservoir performance selected and configured Oil Field Manager to perform production history by reservoir and individual wells in the Furbero Field (Pemex). This required extensive data collection and staff discussions to clarify/validate incomplete or dubious data. My responsibilities included; perform production forecast, analyze/validate PVT tests data, analyze chemical treatments, estimate oil and gas reserves. Optimize Reservoir exploitation through the identification and implementation of advanced technologies. Work with the Geosciences team in the integration of the static model. Maximize the final recovery of the deposits, through ongoing evaluation of existing projects and preparation of technical studies that support the implementation of new additional recovery projects.

 Study of reservoir Brecha (Chicontepec) in Poza Rica (México). Proposal of new location, oil well candidates for re-completion.

Reservoir Engineer في PDVSA
  • فنزويلا
  • فبراير 2003 إلى مايو 2011

Establish best practices for the exploitation of reservoirs, by implementing proper engineering processes, technical and cost efficient, to ensure Reservoir generation

1. Develop the resource base, by identifying the opportunities of the development plan of the reservoirs.
2. Develop and implement annual plans of exploitation by economic ranking, budget approval and setting the schedule of activities, according to corporate strategies and volumetric commitments.
3. Develop proposals for major and minor works through the economic support and the permits required from the competent Entities.
4. Perform operational monitoring and continuous major and minor works programmed in the annual plan, generating diagnoses, to support the success of these activities, compliance with the generation and maintenance of the potential.
5. Monitor and evaluate the sites, by applying diagnostic tools
and an appropriate plan for data acquisition, and the detection of deviations and implementing the necessary adjustments to business plan.
6. Evaluate and implement the use of new technologies designed to maximize the recovery of hydrocarbon reserves through participation in national and international events, subscriptions to professional journals and visits to companies in similar activities, supported by the Technical and Drilling Technology.

7. Ensuring optimum management of resources used in the execution of scheduled jobs.

الخلفية التعليمية

ماجستير, Project Manager
  • في EAE Business School
  • يونيو 2017
ماجستير, Project Management
  • في Rafael Belloso Chacin
  • أبريل 2004

Master degree in Project Management, including activities like HR personal management, licitations.

بكالوريوس,
  • في ZULIA UNIVERSITY
  • مارس 2000

Petroleum Engineering

Specialties & Skills

International Events
History
Data Collection
Journals
OFM (Oil Field Manager)
Saturation Logs Analysis
Segmented Bond tool analysis
Corrosion logs Analysis
Water Management
Water flood monitoring
Production Logging Interpretation
Reservoir Engineering
Cased hole
Cement Bond Logging interpretation
Reservoir Surveillance
Petrophysicist
Casing integrity
Data management
Project Management

اللغات

الانجليزية
متمرّس
الاسبانية
اللغة الأم