Senior Petrophysicist
Weatherford - Iraq
Total years of experience :15 years, 1 Months
I was in charge of Casing integrity analysis Multi Finger Caliper (MSC, MIT), Multithickness and Electromagnetic defectoscope Interpretation, using PIPSPro and Secureview, I worked also in production Logging test analysis and Multi Array tools (MAPS) for conventional and horizontal wells, for wells in Rumailah field
I managed the commercial team and the different Projects on OIL & GAS and energy in Compliance with current regulations. I also generated and closed commercial agreements and partnerships with different companies. My duties included: lead the sales team, process clients and providers requirements, establish the new markets strategy, coordinate and monitor projects and manage clients and suppliers portfolio.
My duties included, water flood monitoring, water management, relative permeability analysis for rock typing integrated studies. Also provided support in log interpretation to get a better data understanding.
In charge of the log interpretation for production logging tools conventional and horizontal wells, saturation logs analysis, segmented bond tools analysis, corrosion logs analysis (Multifinger Caliper and magnetic thickness tools) in Rumailah oilfield located in Basra Iraq.
Responsible of analyze fields production and reservoir performance selected and configured Oil Field Manager to perform production history by reservoir and individual wells in the Furbero Field (Pemex). This required extensive data collection and staff discussions to clarify/validate incomplete or dubious data. My responsibilities included; perform production forecast, analyze/validate PVT tests data, analyze chemical treatments, estimate oil and gas reserves. Optimize Reservoir exploitation through the identification and implementation of advanced technologies. Work with the Geosciences team in the integration of the static model. Maximize the final recovery of the deposits, through ongoing evaluation of existing projects and preparation of technical studies that support the implementation of new additional recovery projects.
Study of reservoir Brecha (Chicontepec) in Poza Rica (México). Proposal of new location, oil well candidates for re-completion.
Establish best practices for the exploitation of reservoirs, by implementing proper engineering processes, technical and cost efficient, to ensure Reservoir generation
1. Develop the resource base, by identifying the opportunities of the development plan of the reservoirs.
2. Develop and implement annual plans of exploitation by economic ranking, budget approval and setting the schedule of activities, according to corporate strategies and volumetric commitments.
3. Develop proposals for major and minor works through the economic support and the permits required from the competent Entities.
4. Perform operational monitoring and continuous major and minor works programmed in the annual plan, generating diagnoses, to support the success of these activities, compliance with the generation and maintenance of the potential.
5. Monitor and evaluate the sites, by applying diagnostic tools
and an appropriate plan for data acquisition, and the detection of deviations and implementing the necessary adjustments to business plan.
6. Evaluate and implement the use of new technologies designed to maximize the recovery of hydrocarbon reserves through participation in national and international events, subscriptions to professional journals and visits to companies in similar activities, supported by the Technical and Drilling Technology.
7. Ensuring optimum management of resources used in the execution of scheduled jobs.
Master degree in Project Management, including activities like HR personal management, licitations.
Petroleum Engineering