Fadi Boustani, Project Manager

Fadi Boustani

Project Manager

SDT

Location
United States - Georgia
Education
Master's degree, Structural
Experience
39 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :39 years, 4 Months

Project Manager at SDT
  • Qatar
  • My current job since January 2017

for a Japanese restaurant in
Riyadh OKKU restaurant. Preparing the tender file for execution. Coordinating with Consultants.
Reviewing the rules and regulations of the Municipality of Riyadh to meet their requirements.
;
SSttrraatteeggiicc PPllaannnniinngg
BBuussiinneessss OOppeerraattiioonnss
SSiittee OOppeerraattiioonnss
CCoonnssttrruuccttiioonn
MMaannaaggeemmeenntt
PPrroojjeecctt MMoonniittoorriinngg
CCoosstt OOppttiimmiissaattiioonn
CCiivviill EEnnggiinneeeerriinngg
QQuuaalliittyy AAssssuurraannccee
CCoonnttrraacctt AAddmmiinniissttrraattiioonn
MMaannaaggeemmeenntt

at TTeeaamm MMaannaaggeemmeenn
  • December 2015 to December 2016

Private Practice: Submitting tenders for different projects in Beirut, Lebanon.
Prepare tender documents for Renovating an old Lebanese house in Kfour, Lebanon.

Project Manager at Mercury Engineering & Const. Co
  • Nigeria
  • September 2013 to November 2015

Major Project Handled
In charge of the execution of Three Dormitory Buildings to accommodate 166 persons and other facility
management buildings with all Infrastructure works for ExxonMobil Company in Eket, Nigeria. Project
Value: US $ 90 Million

at SOLIDERE
  • United Arab Emirates
  • November 1994 to July 2013

for Development & Reconstruction of Beirut Central
District, SAL), Beirut, Lebanon as Project Manager
Major Projects Handled
Executed:
* First new commercial development in Beirut Central District, UN and ESCWA Headquarters building
in Beirut, Lebanon. A state of the art building consisting of 43, 000 m² of total built up area with 500
parking spaces. The project was constructed in 14 months record time fully equipped and furnished. Acted as
in-charge of every detail from excavation, building permit to final handing over to the client. Project Value:
US $ 42 Million
* SOUKS Project North Section. The project consisted of three basement levels for 612 car spaces (25, 494
m²), office building (12, 250 m²) and department store (19, 811 m²). Functioned as an in-charge of securing
permits with local authorities. Managed contracts with Consultants, Technical Controller, Contractor and
Sub-contractors. Monitored and updated approved schedule, controlled cost within the approved budget,
assured quality and safety standards as per SOLIDERE’s requirements, handled claims and variation orders.
Project Value: US $ 18 Million
* Foch Parking Project. The project consisted of four reinforced concrete basements for seven different
developers with common parking entrance. The structure was 12 meters below sea water with a total built
up area of 31, 200 m² and maximum capacity of 770 cars. Administered execution of the diaphragm wall,
excavation, shoring, micro-piling and dewatering contract. Followed up parcellation and regrouping of all
the lots and the sub-structure building permits. Administered FIDIC Contract for execution of civil and
electro-mechanical works. Project Value: US $ 11 Million
* Zeitouny Bay Project which consisted of 16 restaurants and 5 outlet stores from inception to operation.
Handed over Le Yacht Club building. It consisted of private restaurant, retail areas, private yacht club,
mini-market and 52 apartments to be fully furnished. Project total built up area was 20, 000 m² with a
value of US $ 120 Million USD

Sr. Structural Engineer at Sandwell Inc
  • United States
  • May 1993 to July 1994

Major Project Handled
* Designed No. 7 Lime Kiln & Recausticizing Line Project for Ahlstrom Recovery Inc. A US $ 35 Million
project which included kiln piers, platforms, (Firing, Ecofilter & Slaker) buildings and all supporting tanks
and equipment. Designed renovations for No. 5 and 7 Tissue Machines for Georgia Pacific in Crossett
Arkansas. Visited site to check existing conditions and implemented design drawings.

Sr. Structural Engineer at Grant Engineering ASS
  • United States
  • June 1991 to May 1993

Major Projects Handled
Designed:
* Static Models for a 4 Story Jacked-Slab Dormitory Complex for Clemson University
* Support Brackets for 700 tons lift span and support system for 350 tons counterweights for Acosta Bridge
in Jacksonville, Florida.
* Computer Model on M-STRUDL to analyze removal sequence of Talmadge Memorial Bridge in Savannah
* 40, 000 Sq. Ft. Foundations for Collins Hill High School in Gwinnett County
Inspected 5 span steel girder bridge with repair procedures and calculated remaining life of the bridge for
Atlanta Road Bridge over CSX Railroad in Cobb County GA

Engineer at Simons-Eastern Consultants Inc
  • United States
  • October 1988 to June 1991

Major Projects Handled
* Designed various types of industrial buildings and heavy equipment for Paper Mill Industry
* Pipe Bridges with multi-levels and different spans using computers (Auto-Steel & Strudl)
* Mat and Pile Foundations for towers, tanks and other equipment. Modified existing buildings by cutting
through existing slabs and beams

Structural Engineer at James River Corp
  • United States
  • July 1987 to October 1988

Major Projects Handled
* Designed Marta Stations and Rail using computer applications
* Worked on Buckhead, Bankhead, Doraville, Kinsington and Sandy Spring Stations

Structural Engineer at Entech Services Inc
  • United States
  • September 1984 to July 1987

Major Projects Handled
* Designed and analyzed various steel and concrete structures following AISC and ACI Codes
* Designed Sanford Square Project 4 Story Apartment with 2 Parking Basements
SCHOLASTICS
* M.Sc. (Civil Engineering

Education

Master's degree, Structural
  • at Georgia Institute of Technology
  • March 1983

Specialties & Skills

BUDGETING
CONTRACT MANAGEMENT
CONTROL
CUSTOMER RELATIONS
MARKETING
MECHANICAL
MICROSOFT OFFICE
MICROSOFT WORKS
QUALITY

Languages

English
Expert