QA/QC Mechanical Engineer
jack and sanoussi for engineering works
Total years of experience :11 years, 8 Months
Check all QA/QC plan and documents to be aligned with accepted Quality Management
Systems and international standards
Support the Engineering Manager to review all ITP for all projects, all Welding Procedure
Specification (WPS) and proper submittal of the Procedure Qualification Report (PQR),
Painting/ Inspection report, , Hydro testing witnessing and report, Pre-startup safety audit
report and etc. for all ongoing projects
Assist Site Managers to carry out all site inspection activities in accordance with the agreed
ITP such as perform inspection on piping/tanks/pressure relief devices and statutory
equipment.
Perform all daily inspection and test of the scope and character necessary to achieve the
quality of construction required in the drawings and specifications for all works ON or OFF
site.
Cary out inspection and checking for all quality related procedures in the site and ensures
activity at the site are as per approved procedure and inspection test plan.
Coordinate with the consultant’s representative and Site En-charge for inspection and
meeting about quality problems.
monitor all activities related to Quality
Taking care of QA/QC documents of the entire project including certificates, calibration, test
results, inspection requests and, permanent materials delivered and other QA/QC
documents.
Responsible for the closure of Non-conformance report and Site Instruction.
Responsible for the quality and workmanship of every activity, thorough knowledge of all
phases of engineering construction.
Supervise effective implementation of all test and inspection schedule and ensure
adherence to all procedures and coordinate with various teams to perform quality audits on
processes.
Organize 2 storage gasoil tanks ( D 30 M) and 1 water tank (D 14 M) activities of foundation,
fabrication, erection bottom and shell and roof and all component tank and welding works
.
Organize process piping work and firefighting piping activities of support, erection and
welding and radiographic test and pressure test and all component piping (valves, strainer
.sprinkler .etc.)
Organize Installation all pumps (process pump &firefighting pump).
Organize all test such as
Visual inspection test
2- Vacuum box test
3- Radiographic test (tanks &piping)
4- Oil penetrate test
5- Pneumatic test
6- Penetrate test
7- Tanks Hydrostatic test
8- Pipe pressure test
• Prepare Final QA/ QC dossier to submit to the project management consultant.
Quality control mechanical work/progress.
Perform daily inspection based on project specification and international standard.
Heavy structure building single and multi- storied .
Check all item of MEP and HVAC work involved in building.
Assist in dimensional measurement .
Develop, report and maintain communication with all sub-contractors.
Verification of physical measurement of quantities for indirect labor and contracts interim
bill.
Report and delay to the engineer if appearing on the schedule.
Monitors the project to keep on schedule.
Overseeing the delivery of material.
Ensure regular and timely response to initial RFI to witness and verify technical inspection
and material testing.
Regularly attend quality meeting and contribute to resolution of quality issues that occurred.
Closely cooperate with PMT, HSE, and contractor.
Carry out inspection & certify all necessary inspections during various stages of site activities
as per approved inspection and test plan.
Supervision of finishing works.
Promotion all handling equipment
Searching for new clients who might benefit from company products or services and
maximizing client potential in designated regions;
Developing long-term relationships with clients, through managing and interpreting their
requirements;
Persuading clients that a product or service best satisfies their needs in terms of quality, price
and delivery.
Negotiating tender and contract terms and conditions to meet both client and company
needs
negotiating tender and contract terms and conditions to meet both client and company
needs
calculating client quotations and administering client accounts
providing pre-sales technical assistance and product education
Working on after-sales support services and providing technical back up as required.
Arranging and carrying out product training.
Analyzing costs and sales.
Preparing reports for head office and keeping customer records.
Meeting regular sales targets and coordinating sales projects.
Supporting marketing activities by attending trade shows, conferences and other marketing
events.
Making technical presentations and demonstrating how a product meets client needs.
Liaising with other members of the sales team and other technical experts.
Helping in the design of custom-made products.
Installation all bulk mechanical handling (screw conveyor, bucket elevator, chain conveyor,
belt conveyor, DSH.)
Installation feed mill factory
Installation and Repairs of all related machineries: Hammer& Pellet mills, Conveyors and
Bucket Elevators, Boiler, Air Compressor, silos, etc.
assessing project requirements
agreeing budgets, timescales and specifications with clients and managers
liaising with suppliers
producing and implementing designs and test procedures
measuring performance of mechanical components(Hammer& Pellet mills, Conveyors and
Bucket Elevators, Boiler, Air Compressor, silos, etc.), devices and engines
testing, evaluating, modifying and re-testing products
writing reports and documentation
providing technical advice
Reviewing Method of statement, specifications, and standards of materials (pipes, fittings,
flanges,
Gaskets… etc.).
Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
Follow up the status of spools and field run pipes through reports from fabrication workshop
And painting yard and coordinating for transportation these materials to site.
Supervising fit up and welding of spool to spool or spool to field run pipe together and welding
Supports also (as much as possible according to accessibility) to lift and place one time
(Saving time and effort).
Coordinating with QC department to cover any required NDT or Heat treatment (preferably
Before lifting to avoid difficult accessibility).
Coordination with scaffolding groups to make access for assembly the whole lines at any
elevation
(Fit up and welding by taking level and alignment into consideration).
Supervising welding pipe supports which to be erected in position at any structure.
Coordination with engineering department to divide my piping scope into test packages.
Close punch items (An items) (release test packages for hydro, service, and visual test.
Fabrication and lying of annular plate and Bottom plate for Fuel Tanks ((floating roof & fixed
roof).
Fabrication and Erection of shell plate.
Construction of roof tanks (floating roof & fixed roof) including fabrication, erection and
inspection.
Erection, Inspection and follow up of fabrication, welding, piping components and hydro test
process for piping system.
Installation of cooling system & Foam system of Tanks
Fabrication and Erection of curb angle and wind girder
Installation of Roof Nozzle & shell Nozzle.
Periphery handrail installation.
Erection dismantling Scaffolding arrangement
Shot blasting and painting operations under controlled conditions using de-humidifier for
tanks.
Make up process pumps, compressors & firefighting pumps (electrical pumps, jokey pumps
& diesel pumps)
Preparation of daily and weekly reports.
Monitoring of resources deployed on daily basis.
Maintaining of Quality of works and safety.
construction of depots & vertical and horizontal storage tanks with piping, pumps
installation, required fittings and firefighting systems) according to, ASME, AWS, API 650.
Preparing project analysis, budget & time schedule, resource schedule & cost schedule.
&execution on site skid and vertical tanks with piping and required fittings, firefighting
systems canopies piping drawings, calculations from drawings….etc.
Monitor and follow up the project progress
Preparing calibration charts theoretical and physical for horizontal and vertical tanks.
B.Sc. (HONOURS) in Mechanical Engineering from UNIVERSITY of El-IMAM El- MAHADI – (Class2 division 1) at May 2006