fadi kassar, Construction Manager

fadi kassar

Construction Manager

Tivoli Group

Lieu
Qatar - Doha
Éducation
Diplôme supérieur, Interior Architecture
Expérience
19 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 7 Mois

Construction Manager à Tivoli Group
  • Qatar - Doha
  • Je travaille ici depuis décembre 2017

Managing turn key high profile projects.

concept
design drawings
procurement
scope and time management
site management
stakeholder and communication management

Project Manager à Classical Palace
  • Qatar - Doha
  • juin 2014 à décembre 2015

Responsible for ensuring the safe delivery of Al Rayyan Palace project constructed for the Royal Family. The project was budgeted at 60 Million Riyals and originally scheduled to be completed in 12 months.My scope was to hand over 25 ancillary buildings and packages of the main castle and main Majlis.
• Responsible for 13 site staff engineers, planners, QC and QS personnel as well as 200 site work force.
• Arranging and managing all project related meetings.
• Managing, monitoring and interpreting all client related meetings.
• Producing schedule, cost and scope documentation.
• Establishing the overall success criteria for the project, including; time, cost, technical and performance parameters.
• Writing progress reports.
• Monitoring all work in accordance with schedules.
• Producing and maintaining project management plans.
• Monitoring and managing all contractors, consultants and third party suppliers.
• Ensuring that all is in accordance to the company policy and procedures and adhering to all statutory and regulatory legislation and specifications.
• Overseeing quality control, health and safety matters on site.

Project Manager / Partner à Effects Interiors
  • Qatar - Doha
  • janvier 2009 à juin 2014

• Managing a team of 20 office staff.
• Managing the Design department by creating functional and pleasing designs.
• Assuring design environment meet International and local codes and specifications.
• Developing the best methods for construction activities, and determining the optimal sequence of operations on site.
• Ensuring that construction projects are completed within set deadlines, on budget, and in line with all relevant safety standards and regulations.
• Coordinating Civil, Electrical and Mechanical drawings.
• Working directly with the clients making sure their requirements are met.
• Monitoring and managing contractors.

Interior Architect à Z.A.K. International
  • Qatar - Doha
  • décembre 2007 à janvier 2009

• Developing initial ideas and acquiring key information about potential projects, discussing requirements in detail with clients (the brief) and setting project schedules
• Managing a team of 10 designers and draftsmen.
• Considering materials and costs according to set budgets and negotiating project fees
• Preparing concept boards look and feel and sample boards for client meetings.
• Generating project layout; understanding the 3D of the project through the physical models or the software models.
• Issuing IFC drawings for site.
• Monitoring and managing contractors.

Interior Architect à Khatib & Alami
  • Qatar - Doha
  • décembre 2005 à décembre 2007

• Advisory and Consultancy role regarding the nature of the design, use of materials, and other important information which affects the design process.
• Solving and mitigating design issues and constraints.
• Conducting Site Inspections and solving site issues, responsible for RFI approvals.
• Coordinating with all contractors to ensure schedule and quality was met.

Interior Architect à M.E.E. Doha
  • Qatar - Doha
  • février 2004 à décembre 2005

• Responsible for full interior packages involved in all aspects from start of project to finish.
• Created creative designs on large scale projects from concept through to completion
• Preparing client presentations and shop drawings.
• Liaison with relevant authorities and Project Managers.

Head of Design Department à STALQ
  • Liban - Beyrouth
  • juillet 2002 à septembre 2003

• Attending and managing design meetings and producing work in progress reports.
• Managing a design and production teams of 12 Engineers.
• Mentoring and offering guidance to others within the company.
• Working closely within the team to ensure that the designs are workable and solving issues where required
• Offering creative ideas and leadership on many levels within the companies domain.
• key project was shelf solution for WELLA Germany.

Éducation

Diplôme supérieur, Interior Architecture
  • à Lebanese University
  • août 2001

High studies diploma in Interior Architecture/Lebanese University (Beirut/Lebanon) 2001. Equivalent to Masters Degree.

Specialties & Skills

Interior Design
Architecture
Design Management
Project Management

Langues

Anglais
Expert
Arabe
Expert
Polonais
Débutant

Adhésions

Qatar green building council
  • memeber
  • January 2010

Formation et Diplômes

Contracts and Claims Management (Formation)
Institut de formation:
MMTI (Doha)
Date de la formation:
April 2016
Durée:
20 heures
P.M.P. (Certificat)
Date de la formation:
December 2015
Valide jusqu'à:
December 2018