فادي حبيب, Owner Representative of construction

فادي حبيب

Owner Representative of construction

SAVOY SHARM EL SHEIKH HOTEL SIERRA SHARM EL SHEKH HOTEL NEW SOHO HOTEL SOHO SQUARE

البلد
مصر - القاهرة
التعليم
ماجستير, Project Management
الخبرات
32 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 3 أشهر

Owner Representative of construction في SAVOY SHARM EL SHEIKH HOTEL SIERRA SHARM EL SHEKH HOTEL NEW SOHO HOTEL SOHO SQUARE
  • مصر - شرم الشيخ
  • أشغل هذه الوظيفة منذ يونيو 2010

• Khan El Khalili Shops - The Soho Square Squash - New Soho Hotel 150 Rooms - Royal Savoy New Building - Sierra 16 New Rooms - New Pools - New Building 16 Rooms And Lockers - Sinai Mall Building - The New Substation - Kids Club - HSBC Bank Building - Treatment Plant .
• Supervision for all activities works and coordination between consultant and owner and maintenance staff for hotel and operation.
• Daily report sent to owner about all Projects.

Projects Director, For Sharm El Sheikh Area في AKHNATON For Construction And Real Estate Development
  • مصر - شرم الشيخ
  • مارس 2012 إلى مارس 2013

• Grand Plaza, Nabq - 500 Rooms Hotel - Revamping All Rooms And Restaurant - Revamping Health club and Disco -New Lounge Club.
• New Grand Plaza Palms, Nabq - 600 Rooms Hotel - All Construction and Interior Work Includes Mock-up Rooms - External Landscape and Swimming Pool

Construction Manager في ENCO GOLDEN COAST _ SHARM EL SHEIKH
  • مصر - القاهرة
  • يوليو 2009 إلى يونيو 2010

• Main Building Crown Plaza Hotel - Lobby-All Day Dining Restaurant-Italian Restaurant - Asian Restaurant -Egyptian Restaurant - Admin Area - Multipurpose Hall- Changing Room- All Public Toilets- Main Stair- Meeting Rooms1&2- Mezzanine Floor -Roof Floor- Facade upgrade - Pumps Room-English Book Lounge- Coffee Break Lounge - Service Building ( Clinics-Workshops) - B.O.H-Laundry- SPA - Fun pub.

Projects Manager في DOIMO GROUP COMPANY DOIMO EGYPT CONTRACT
  • مصر - القاهرة
  • سبتمبر 2008 إلى يوليو 2009

• CAIRO SHERATON NEFERTITI HOTEL TOWER REFURBISHMENT
Project Total cost (100 Million Egyptian Pounds)

• RENOVATION OF CATARACT ASWAN HOTEL
Total cost MOUK UP Room (Million Egyptian Pounds)

Senior Quality Assurance & Quality Control Engineer في DEPA UNITED GROUP COMPANY – DEPA EYGPT HOTEL INTERIORS
  • مصر - القاهرة
  • مارس 2006 إلى أغسطس 2008

• Maintain records & procedure.
• Method statement for all activities from architectural works in project.
• Inspection and Test Planning for all activities from architectural works in project.
• Material /plant inspection request (MIR) for all material delivered in project.
• Supervision for all activities from architectural works in project.
• Snagging List for all items.
• System of Quality Assurance & Quality Control plan.

Quality Control Manager في ORASCOM CONSTRUCTION INDUSTRIES: RAYA HOLDING HEADQUARTERS PROJECT
  • مصر - القاهرة
  • مايو 2005 إلى فبراير 2006

• Maintain records & procedure.
• Method statement for all activities from civil & architectural works in project.
• Supervision for all activities from civil & architectural works in project.
• Supervision of laboratory results for all material in project.
• Material /plant inspection request (MIR) for all material delivered in project.
• Samples of materials for approval from consultant.
• Safety works in project.
Project Total cost (77 Million Egyptian Pounds)

Quality Control Civil engineer في ORASCOM CONSTRUCTION INDUSTRIES: HELWAN FERTILIZER PROJECT
  • مصر - القاهرة
  • يناير 2005 إلى مايو 2005

• Maintain records & procedure.
• Supervision of formwork.
• Supervisor of steel bar fixing work (Reinforcement steel & embedded).
• Supervision of laboratory results (concrete cubes, slump test, sand cone, plate bearing test & sieve analysis)
• Supervision of material (cement aggregate, sand water, steel bar, additives)
Project total cost (170 Million Egyptian Pounds)

Senior Site Engineer to Guest Rooms & Quality Control Manager To all Hotels. في ORASCOM CONSTRUCTION INDUSTRIES: RENOVATION OF RENAISSANCE RAMADA HOTEL Project of Alexandria
  • مصر - القاهرة
  • يوليو 2003 إلى يناير 2005

Responsible for execution of all the superior different finishing activity as to buildings - laundry - ceramics - marble - alimental - False ceilings -paintings - wooden skirts - oak wood - steel doors - delivering the works to the Consultant -the project belongs to ASA consultant and coordination office that is concerned as to the different mechanical works items.
Project total cost (50 million Egyptian Pounds)

Quality Control Engineer في CONSOLIDATED CONTRACTORS INTERNATIONAL Co. - ORASCOM (JV): GOLDEN PYRAMIDS PLAZA PROJECT
  • مصر - القاهرة
  • يونيو 2000 إلى يوليو 2003

Inspection of executed activities and its certification by the Consulting. Scope of work included all types of high quality finishing, hyper market, cinema, shops, ice skating ring, bowling center, health club, restaurants, furnisher apartments, guest rooms ... etc.
Handing over the finished buildings (snagging, punch Lists)
Project contains five stars hotels, ten apartment towers and Commercial centers
(Total cost $340 Millions)

Senior Site Engineer for projects at the office في DALINZ FOR INTERIOR DESIGN AND DECORATION
  • مصر - القاهرة
  • يناير 1999 إلى مايو 2000

Responsible for coordination of finishing trades - quantity survey - cost of every item.

Site engineer في ORASCOM - BESIX (JV): CONRAD INTERNATIONAL HOTEL.
  • مصر - القاهرة
  • فبراير 1997 إلى نوفمبر 1998

Finishing site engineer responsible for the execution of finishing works for restaurants outlets in the Hotel. The scope finishing activities for the concerned restaurants included all high quality finishing activities for the concerned restaurants including ditches, interior finishes and coordination with Electro-Mechanical and other trades.
(Total cost $250 Millions).

Site engineer. في SPIE BATIGNALLE "French Company": CAIRO UNDERGROUND PHASE 2 (from Shoubra to el Giza).
  • مصر - القاهرة
  • يناير 1995 إلى ديسمبر 1996

Responsible for the execution of civil works for electrical rooms, pull boxes, rectifier stations and all other E/M related works.

Site engineer في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر - القاهرة
  • ديسمبر 1992 إلى ديسمبر 1994

• False ceiling in Movenpick El Gouna.
• False ceiling in Galas Co Factory, El Salam City
• Supervision of Dr. Nabil Refaat's villa.
• Wood works for interior decorative works in Piano Piano Bar W.T.C.
• Interior & exterior painting of Algerian Ambassador's villa in Dokki.
• Interior & exterior painting of Spanish Ambassador's villa in Zamalek.

Site engineer في ORASCOM – JAMES M. MONTGOMRY (JV): CENTRAL WATER LABORATORY IN CAIRO
  • مصر - القاهرة
  • ديسمبر 1991 إلى ديسمبر 1992

Responsible for the execution of civil works & Architectural in all project items.

الخلفية التعليمية

ماجستير, Project Management
  • في Ain Shams University – Faculty of Engineering
  • يوليو 2007
دبلوم, Project Management
  • في Ain Shams University – Faculty of Engineering
  • يوليو 2007
بكالوريوس, Architecture Engineering
  • في Helwan University - Faculty of Fine Arts
  • مايو 1990

Project: Design of Residential, Commercial and Offices High- Rise Building

Specialties & Skills

Management Science
Consultant Coordination
Decoration
Team Management
Planing
construction manager - project manager

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

the professional board of the UK consulting centre LTD
  • Engineer
  • January 2011
engineering Syndicate Cairo branch
  • decorated degree consultant engineering project management
  • July 2008
Arbitration Center Faculty of Law Ain Shams University
  • Decorated degree International Arbitrator
  • May 2008
UIA Egyptian national section
  • Associate member
  • September 2007

التدريب و الشهادات

Analyses of Structure elements, Maintenance and Cracks Repair for Buildings (الشهادة)
تاريخ الدورة:
December 2005
صالحة لغاية:
December 2005
Quality Control Constructions Repairs, Codes and buildings Laws Course (الشهادة)
تاريخ الدورة:
November 2005
صالحة لغاية:
November 2005

الهوايات

  • التعلم واكتساب المهارات وتطوير القدرات
    ماحصل ع درجه الاستشاري في إدارة المشروعات والتخطيط من نقابه المهندسين بالقاهرة سنه 2010 حاصل علي شهادة البورد البريطاني في إدارة المشروعات والانشاءات. حاصل على ماجستير في اداره المشروعات جامعه عين شمس حاصل على دبلوم إدارة المشروعات جامعه عين شمس حاصل علي تحكيم دولي حقوق عين شمس حاصل علي كورسات ودورات متخصصة إدارة مشروعات وتخطيط وإدارة المخاطر وإعداد القادة.