Fady Habib, Owner Representative of construction

Fady Habib

Owner Representative of construction

SAVOY SHARM EL SHEIKH HOTEL SIERRA SHARM EL SHEKH HOTEL NEW SOHO HOTEL SOHO SQUARE

Lieu
Egypte - Le Caire
Éducation
Master, Project Management
Expérience
32 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :32 years, 3 Mois

Owner Representative of construction à SAVOY SHARM EL SHEIKH HOTEL SIERRA SHARM EL SHEKH HOTEL NEW SOHO HOTEL SOHO SQUARE
  • Egypte - Charm el Cheikh
  • Je travaille ici depuis juin 2010

• Khan El Khalili Shops - The Soho Square Squash - New Soho Hotel 150 Rooms - Royal Savoy New Building - Sierra 16 New Rooms - New Pools - New Building 16 Rooms And Lockers - Sinai Mall Building - The New Substation - Kids Club - HSBC Bank Building - Treatment Plant .
• Supervision for all activities works and coordination between consultant and owner and maintenance staff for hotel and operation.
• Daily report sent to owner about all Projects.

Projects Director, For Sharm El Sheikh Area à AKHNATON For Construction And Real Estate Development
  • Egypte - Charm el Cheikh
  • mars 2012 à mars 2013

• Grand Plaza, Nabq - 500 Rooms Hotel - Revamping All Rooms And Restaurant - Revamping Health club and Disco -New Lounge Club.
• New Grand Plaza Palms, Nabq - 600 Rooms Hotel - All Construction and Interior Work Includes Mock-up Rooms - External Landscape and Swimming Pool

Construction Manager à ENCO GOLDEN COAST _ SHARM EL SHEIKH
  • Egypte - Le Caire
  • juillet 2009 à juin 2010

• Main Building Crown Plaza Hotel - Lobby-All Day Dining Restaurant-Italian Restaurant - Asian Restaurant -Egyptian Restaurant - Admin Area - Multipurpose Hall- Changing Room- All Public Toilets- Main Stair- Meeting Rooms1&2- Mezzanine Floor -Roof Floor- Facade upgrade - Pumps Room-English Book Lounge- Coffee Break Lounge - Service Building ( Clinics-Workshops) - B.O.H-Laundry- SPA - Fun pub.

Projects Manager à DOIMO GROUP COMPANY DOIMO EGYPT CONTRACT
  • Egypte - Le Caire
  • septembre 2008 à juillet 2009

• CAIRO SHERATON NEFERTITI HOTEL TOWER REFURBISHMENT
Project Total cost (100 Million Egyptian Pounds)

• RENOVATION OF CATARACT ASWAN HOTEL
Total cost MOUK UP Room (Million Egyptian Pounds)

Senior Quality Assurance & Quality Control Engineer à DEPA UNITED GROUP COMPANY – DEPA EYGPT HOTEL INTERIORS
  • Egypte - Le Caire
  • mars 2006 à août 2008

• Maintain records & procedure.
• Method statement for all activities from architectural works in project.
• Inspection and Test Planning for all activities from architectural works in project.
• Material /plant inspection request (MIR) for all material delivered in project.
• Supervision for all activities from architectural works in project.
• Snagging List for all items.
• System of Quality Assurance & Quality Control plan.

Quality Control Manager à ORASCOM CONSTRUCTION INDUSTRIES: RAYA HOLDING HEADQUARTERS PROJECT
  • Egypte - Le Caire
  • mai 2005 à février 2006

• Maintain records & procedure.
• Method statement for all activities from civil & architectural works in project.
• Supervision for all activities from civil & architectural works in project.
• Supervision of laboratory results for all material in project.
• Material /plant inspection request (MIR) for all material delivered in project.
• Samples of materials for approval from consultant.
• Safety works in project.
Project Total cost (77 Million Egyptian Pounds)

Quality Control Civil engineer à ORASCOM CONSTRUCTION INDUSTRIES: HELWAN FERTILIZER PROJECT
  • Egypte - Le Caire
  • janvier 2005 à mai 2005

• Maintain records & procedure.
• Supervision of formwork.
• Supervisor of steel bar fixing work (Reinforcement steel & embedded).
• Supervision of laboratory results (concrete cubes, slump test, sand cone, plate bearing test & sieve analysis)
• Supervision of material (cement aggregate, sand water, steel bar, additives)
Project total cost (170 Million Egyptian Pounds)

Senior Site Engineer to Guest Rooms & Quality Control Manager To all Hotels. à ORASCOM CONSTRUCTION INDUSTRIES: RENOVATION OF RENAISSANCE RAMADA HOTEL Project of Alexandria
  • Egypte - Le Caire
  • juillet 2003 à janvier 2005

Responsible for execution of all the superior different finishing activity as to buildings - laundry - ceramics - marble - alimental - False ceilings -paintings - wooden skirts - oak wood - steel doors - delivering the works to the Consultant -the project belongs to ASA consultant and coordination office that is concerned as to the different mechanical works items.
Project total cost (50 million Egyptian Pounds)

Quality Control Engineer à CONSOLIDATED CONTRACTORS INTERNATIONAL Co. - ORASCOM (JV): GOLDEN PYRAMIDS PLAZA PROJECT
  • Egypte - Le Caire
  • juin 2000 à juillet 2003

Inspection of executed activities and its certification by the Consulting. Scope of work included all types of high quality finishing, hyper market, cinema, shops, ice skating ring, bowling center, health club, restaurants, furnisher apartments, guest rooms ... etc.
Handing over the finished buildings (snagging, punch Lists)
Project contains five stars hotels, ten apartment towers and Commercial centers
(Total cost $340 Millions)

Senior Site Engineer for projects at the office à DALINZ FOR INTERIOR DESIGN AND DECORATION
  • Egypte - Le Caire
  • janvier 1999 à mai 2000

Responsible for coordination of finishing trades - quantity survey - cost of every item.

Site engineer à ORASCOM - BESIX (JV): CONRAD INTERNATIONAL HOTEL.
  • Egypte - Le Caire
  • février 1997 à novembre 1998

Finishing site engineer responsible for the execution of finishing works for restaurants outlets in the Hotel. The scope finishing activities for the concerned restaurants included all high quality finishing activities for the concerned restaurants including ditches, interior finishes and coordination with Electro-Mechanical and other trades.
(Total cost $250 Millions).

Site engineer. à SPIE BATIGNALLE "French Company": CAIRO UNDERGROUND PHASE 2 (from Shoubra to el Giza).
  • Egypte - Le Caire
  • janvier 1995 à décembre 1996

Responsible for the execution of civil works for electrical rooms, pull boxes, rectifier stations and all other E/M related works.

Site engineer à ORASCOM CONSTRUCTION INDUSTRIES
  • Egypte - Le Caire
  • décembre 1992 à décembre 1994

• False ceiling in Movenpick El Gouna.
• False ceiling in Galas Co Factory, El Salam City
• Supervision of Dr. Nabil Refaat's villa.
• Wood works for interior decorative works in Piano Piano Bar W.T.C.
• Interior & exterior painting of Algerian Ambassador's villa in Dokki.
• Interior & exterior painting of Spanish Ambassador's villa in Zamalek.

Site engineer à ORASCOM – JAMES M. MONTGOMRY (JV): CENTRAL WATER LABORATORY IN CAIRO
  • Egypte - Le Caire
  • décembre 1991 à décembre 1992

Responsible for the execution of civil works & Architectural in all project items.

Éducation

Master, Project Management
  • à Ain Shams University – Faculty of Engineering
  • juillet 2007
Diplôme, Project Management
  • à Ain Shams University – Faculty of Engineering
  • juillet 2007
Baccalauréat, Architecture Engineering
  • à Helwan University - Faculty of Fine Arts
  • mai 1990

Project: Design of Residential, Commercial and Offices High- Rise Building

Specialties & Skills

Management Science
Consultant Coordination
Decoration
Team Management
Planing
construction manager - project manager

Langues

Arabe
Expert
Anglais
Moyen

Adhésions

the professional board of the UK consulting centre LTD
  • Engineer
  • January 2011
engineering Syndicate Cairo branch
  • decorated degree consultant engineering project management
  • July 2008
Arbitration Center Faculty of Law Ain Shams University
  • Decorated degree International Arbitrator
  • May 2008
UIA Egyptian national section
  • Associate member
  • September 2007

Formation et Diplômes

Analyses of Structure elements, Maintenance and Cracks Repair for Buildings (Certificat)
Date de la formation:
December 2005
Valide jusqu'à:
December 2005
Quality Control Constructions Repairs, Codes and buildings Laws Course (Certificat)
Date de la formation:
November 2005
Valide jusqu'à:
November 2005

Loisirs

  • التعلم واكتساب المهارات وتطوير القدرات
    ماحصل ع درجه الاستشاري في إدارة المشروعات والتخطيط من نقابه المهندسين بالقاهرة سنه 2010 حاصل علي شهادة البورد البريطاني في إدارة المشروعات والانشاءات. حاصل على ماجستير في اداره المشروعات جامعه عين شمس حاصل على دبلوم إدارة المشروعات جامعه عين شمس حاصل علي تحكيم دولي حقوق عين شمس حاصل علي كورسات ودورات متخصصة إدارة مشروعات وتخطيط وإدارة المخاطر وإعداد القادة.