فهد علام, QA/QC Engineer

فهد علام

QA/QC Engineer

Built contracting company/Ladun Investment Company

البلد
الهند - باتنا
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
8 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :8 years, 2 أشهر

QA/QC Engineer في Built contracting company/Ladun Investment Company
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ يناير 2022

Material Inspection as per project specification. site surveillance & inspection. Securing QC documents & performing external & internal audit. Preparing red mark drawing for as built. preparing Daily, Weekly & monthly report.

Third Party Inspector في Mahanagar Gas Ltd
  • الهند
  • أغسطس 2014 إلى ديسمبر 2015

Responsibilities:
•Daily site surveillance & Supervision on subcontractors
•Making report for QA/QC inspection for consultant approval.
•Ensuring quality control of the work and execution
•Planning, Reviewing and supply management of the project
•MIS Preparation of the day to day work activities and reporting to the HO.
•Plan and conduct audits and circulate audit summary reports. Maintain records of audit summary reports and CAR and conduct proactive follow up for the closeouts of the same to ensure compliance within committed target dates.
•Maintaining all QA/QC documentation, method statements, specifications, inspection test plans or quality inspection plans.


•All preparation for Audit (Internal & External) ensuring all documentation compliance with approved procedures.
•Review of material test certificates as per Codes, Standards and Client specification.
•Refer the Client standard and international standard like ASME B31.3 and ASME Sec IX

QC Engineer في Tuleila Heat Insulation Ltd
  • الهند
  • يوليو 2013 إلى يونيو 2014

Projects-1:- Abu Dhabi Airport Bus Gate-Terminal3.
Main Contractor: - Taylor Woodrow

Tuleila Heat Insulation Ltd, UAE في ADAC
  • الإمارات العربية المتحدة - الشارقة
  • يوليو 2013 إلى يونيو 2014

Projects-2: - Crown Paper Mill. (Shut Down)

Responsibilities:
•Daily progress sheet preparation.
•Making RFI as per approved ITP, Procedure, AFC drawing, Spec. for consultant approval.
•Material Inspection as per approved Submittal, project Specifications,
•Inspection/Verification for the Installation of fire proofing material on steel.
•Inspection/Verification for the Installation of insulation and cladding on pipe.
•Daily meeting with client for site Production and progress.

Third Party Inspector في Intertek Moody (I) Pvt. Ltd
  • الهند
  • سبتمبر 2012 إلى يونيو 2013

Inventory: Material identification as per received drawing, codes and standards.
•Installation of underground pipeline.
•Carrying out flushing and testing of pipelines with safety rules and regulation.
•Supervision of fabrication, testing & commissioning of underground pipeline.
•Briefly supervision, plumbers and providing good services to clients.
•To ensure the internal service providers and contractors execution plans deliverables and performance meet the project schedule, contractual requirement, quality.
•Laying pipes as per specification and technical evolution of demand load and taking into consideration the hurdles in pipeline laying like crossing highway drainage crossing etc.
•Attending weekly meeting with client.
•Prepare backfilling & FDT reports.
•Maintain the daily progress report.
•Planning for the next day work activity

Site Engineer في Samsung Engineering
  • الإمارات العربية المتحدة
  • مارس 2010 إلى أغسطس 2012

Company: - Indian Oil Tanking Engineering Projects

Site Engineer في Cross country
  • إلى

B.TECH. MINI PROJECT
“SHEET METAL AND DEEP DRAWING”
B.TECH FINAL PROJECT
PIPELINE INSTALLED AND CHEMICAL DOSING FOR POTABLE WATER SUPPLY.

Career Summary

• Overall 8 years of experience as a

International Consultant في DORSCH
  • الإمارات العربية المتحدة
  • إلى

Projects-2:- King Khalid International Airport Development & Expansion, DCP
Scope of Work: - Chillers, Cooling tower, ETS, EMS, Cooling & Chilled (Return & Supply) Piping’s, Make up Water, Pumps, Tanks, LVMCC, VFD, 13.8 Kv Transformer, Soft starter, Switch Gear etc.
Main Contractor: - SNC Lavalin
Client: - Saudi Tabreed
Duties and Responsibilities:
•Prepare and review of quality documents like Project Quality Plan (PQP), Inspection and Test Plan (ITP), Specification, Welding Procedure Specification (WPS)/Procedure Qualification Record (PQR)/ Welder Qualification Test (WQT).
•Review & Prepare MRIR as per approved material Submittal, Specification, delivery note, MTC, COC etc.
•To carry out Stage wise inspection of site erection activities & raise NOI/RFI as per ITP & Approved drawings.
•Inspection of Painting activity from surface preparation to final coat.
•Control of piping erection and fabrication as per shop and field weld, inspection of the same.
•Coordination with Production and Quality Control Departments on Production Planning and Quality issues.
•Conducting welders test as per ASME Sec IX.
•Prepare WPS/PQR for various materials like carbon steel, stainless steel and other materials.
•Refer the Client standard and international standard like ASME B31.3 and ASME Sec IX.
•Issue punch list on lines that requires so, monitor and supervise reinstatement
•Check and inspect the gaskets, valves prior to the reinstatement acceptance as per latest drawings for construction, code and specification standards.
•Coordination of NDT crews raises RFN (request for NDT) as per the priorities.
•Documentation and recording of all testing activities, daily welding reports.
•Prepare and submit inspection reports of fit-ups, dimensional, visual, material summary & red marking drawings for proper document and approval.
•Reviews & verifies Welding inspection & NDT reports (MPT, RT & PT) on all welding joints prior to finalization & acceptance of its certificates.
•Prepare inspection request prior to accept the construction piping / welding work, pressure testing and releasing of fabricated pipelines in order to prepare certification for the completed items.
•Witnessing Hydro test activity and Preparation of hydro test packages and punch listing.
•Follow up QMS six mandatory procedures like Control of Documents, Records, Inspection, NCR/NCMR and Corrective Action & Preventive Action.



•To inspect and to provide recommendation / quality plan to carryout corrective actions (replacement or repair) for concerns / failures related to static equipment’s of MTBE, Carbon Black & Utility plants based on the inspection findings.
•Evaluating the condition and ensuring the integrity of static equipment’s (pressure vessels, heat exchangers, reactors, columns, storage tanks, boilers, heaters etc.) and piping of the complex.
•Carry out Root Cause Analysis for the major / repetitive nature of failures to find the damage mechanism and to issue RCA report and necessary recommendations based on the analysis to prevent its re-occurrence.
•To determine remaining service life of equipment’s and piping based on the inspection findings.
•Provide material specifications and ensuring modification/repairs of static equipment’s/pipelines comply with the relevant international codes and standards.
•To provide Inspection Test Plan to vendors / contractors while procurement of new equipment’s/piping/fittings and to carry out stage wise inspection activities during its fabrication.
•To inspect PSV’s and recommend any corrective action based on the observations and also to witness POP & Leak test at its specified pressure.
•Inspection scope preparation, man-power requirement identification for Shutdown / Turnaround of the plants.
•Inspection Package preparation for static equipment’s before Turn around / Shutdown.
•To provide quality plan, clearly mentioning inspection hold points to vendors before fabrication of new equipment’s which are to be installed in the plant as part of MOC process or new project execution.
•Provide welding procedures for repairs involving welding.
•To review and update the inspection procedures related to static equipment’s.
•Review WPS / PQR submitted by vendors / contractors.
•To witness / review NDT inspection and hydro test/pneumatic tests results.
•To provide painting specifications and carry out stage wise inspection.
•Controlling quality control activities and directly involving in inspection activities.
•Review and maintaining records of Calibration certificates of Instruments, Personnel Certifications, Batch test Certificates for Consumables etc.

Site Engineer في Cross country
  • إلى

B.TECH. MINI PROJECT
“SHEET METAL AND DEEP DRAWING”
B.TECH FINAL PROJECT
PIPELINE INSTALLED AND CHEMICAL DOSING FOR POTABLE WATER SUPPLY.

Career Summary

• Overall 8 years of experience as a

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Vidya Vikas Institute of Technology
  • يونيو 2010

with first class

بكالوريوس, Mechanical Engineering
  • في Vidya Vikas Institute of Technology
  • يونيو 2010

with first class

بكالوريوس, Mechanical Engineering
  • في Patna Muslim Inter College
  • مارس 2010

بكالوريوس,
  • في Vidya Vikas Institute Of Technology
  • يناير 2010

الثانوية العامة أو ما يعادلها,
  • في St. Joseph Prep school
  • يناير 2003

Specialties & Skills

Installation
Fabrication
CONSULTING
CUSTOMER RELATIONS
DOCUMENTATION
GRAPHIC DESIGN
INVENTORY MANAGEMENT
MICROSOFT ACCESS
QUALITY CONTROL
REPORTS
SPECIFICATION
SUPERVISORY SKILLS

اللغات

الانجليزية
متوسط