ريان لاساكا, Materials Engineer/ Civil

ريان لاساكا

Materials Engineer/ Civil

DAR AL - HANDASAH CONSULTANTS (Shair & Partners)

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Bachelor of Science in Civil Engineering
الخبرات
20 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 2 أشهر

Materials Engineer/ Civil في DAR AL - HANDASAH CONSULTANTS (Shair & Partners)
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يونيو 2019

Project: KING ABDULLAH INTERNATIONAL GARDENS
Project Cost: Million $ 427.4

 King Abdullah International Gardens, Riyadh Saudi Arabia. A 210 hectares’ project in Riyadh which includes a main building designed in the shape of two huge overlapping crescents, which will comprise a botanical museum, water parks, and scientific parks. Seven botanical gardens will be developed within King Abdullah International Gardens, which will also comprise restaurants, viewing towers, a banquet hall, and parking space for 5, 000 cars.
Duties and Responsibilities:

1. Review material approval request and document submittals.
2. Review quality and material test reports.
3. Review and implementing of ITP & method of statement.
4. Review concrete and asphalt mix design.
5. Formulate job mix formula for aggregate subbase, aggregate base course and asphalt pavement.
6. Ensuring compliance of used materials with the project specifications.
7. Issuing nonconformance (NCR) and site instruction (SI) and follow up to make sure the contractor compliance with required corrective action according to specification and contract requirements.
8. Ensuring inspection and checking of all delivered materials to site for conformance to the project requirements and approval.
9. Participating in the quality control of materials including all the laboratory and field testing, acceptance of used materials, checking and accepting all remedial and corrective measures.
10. Supervising contractor’s laboratory and batching plants trial mixes.
11. Supervising, participating and directing sampling and testing of all materials according to the contract and the specifications
12. Inspection of concrete, asphalt and earthwork quality as project specification requirements and standards including sampling and laboratory testing.
13. Checking Laboratory Test Results submitted by the Independent Third Party Laboratory if materials meet the project specification requirements for soil, concrete and asphalt.
14. Analyzing the test results in a timely manner and recommending action to the Senior Resident Engineer
15. Maintaining records of test results and all corrective actions taken.
16. Tracking and reviewing the site testing and certificates of compliance.
17. Conduct all work activities in a safe and environmentally responsible mineral all times by not taking on any task(s) that are received as unsafe. Complies with the HSE management system and reports all incidents and near misses to the supervisor or HSE representative.

Materials Engineer في DAR AL - HANDASAH CONSULTANTS (Shair & Partners)
  • المملكة العربية السعودية - جدة
  • ديسمبر 2012 إلى يونيو 2019

Project: KING ABDUL AZIZ INTERNATIONAL AIRPORT (KAIA-Project)
Project Cost: Billion $ 7, 228
Duties & Responsibilities:
1. Inspection of concrete, asphalt and earthworks quality as project specification requirements and standards including sampling and witness laboratory testing.
2. Inspection of Stock piles and take samples for General backfilling material, Sub - grade material, Aggregate Base Course material and Concrete aggregates and send it to Independent Third Party Laboratory for testing.
3. Witness laboratory testing of aggregates/ materials to ensure proper procedure of test is observed.
4. Check Laboratory Test Results submitted by the Independent Third Party Laboratory if materials meet the project specification requirements.
5. Conduct inspection for field density test of backfilling, sub - grade and base course material by nuclear gauge and sand cone method base on the proctor and optimum moisture content from the laboratory test results.
6. Conduct inspection for field density test of sand bedding of pipes, settlement test for filter material and check elevation prior to testing.
7. Surveillance of backfilling if required depth and approved material is being used.
8. Inspect concreting works at concrete including quantity and quality of aggregates, cement, water and admixtures and temperature to ensure that it reach the compressive strength design.
9. Attend witness and hold points identified in the concrete quality, checking slumps, temperature, delivery times, kind of mix and if concrete are poured within the allotted time.
10. Observe asphalt batching plant operation to see the correct weights and proportions of aggregates are obtained including asphalt content in accordance to the to the applied approved asphalt mix design.
11. Check temperature of mix asphalt and visually check the mixed for non-uniformity and incomplete mixing.
12. Ensure the materials used are approved by company and satisfy the requirements and specifications.
13. Ensure monitoring/ surveillance activities are being conducted on an ongoing basis.

Materials Inspector Engineer في DAR AL - HANDASAH CONSULTANTS (Shair & Partners)
  • قطر - الدوحة
  • يوليو 2008 إلى مايو 2012

Qatar North Route Project (Package 2 & 3)
Doha, Qatar
Duties and Responsibilities:
♦ Review company specifications, drawings, method statements, QC procedures and inspection test plans. Maintain daily reports and log of daily activities.
♦ Conduct inspection for field density test of sub - grade, sub - base and base course material by nuclear gauge.
♦ Conduct inspection for field density test of sand bedding of pipes and check elevation prior to testing.
♦ Surveillance of backfilling if required depth and approved material is being used.
♦ Inspect concreting works at concrete including quantity and quality of aggregates, cement, water and admixtures and temperature to ensure that it reach the compressive strength design.
♦Attend witness and hold points identified in the concrete quality, checking slumps, temperature, delivery times, kind of mix and if concrete are poured within the allotted time.
♦ Observe asphalt batching plant operation to see the correct weights and proportions of aggregates are obtained including asphalt content in accordance to the to the applied approved asphalt mix design.
♦Check temperature of mix asphalt and visually check the mixed for non-uniformity and incomplete mixing.
♦Ensure the materials used are approved by company and satisfy the requirements and specifications.
♦ Ensure monitoring/ surveillance activities are being conducted on an ongoing basis.
♦ Conduct all work activities in a safe and environmentally responsible manner at all times by not taking on any task(s) that are received as unsafe. Complies with the HSE management system and reports all incidents and near misses to the supervisor or HSE representative.

Qa/ Qc Inspector - Civil في Consolidated Contractors Company (CCC)
  • المملكة العربية السعودية - الخبر
  • مارس 2006 إلى يونيو 2008

♦ Review company specifications, drawings, method statements, QC procedures and inspection test plans. Maintain daily reports and log of daily activities.
♦ Review the following procedures: earthwork, excavation and backfill, concrete, concrete construction, grouting, masonry, paving works.
♦ Attend and witness concreting works to insure concrete quality by checking slumps, temperature, delivery times and if concrete are poured within the allotted time.
♦ Ensure monitoring/ surveillance activities are being conducted on an ongoing basis.
♦ Pre-structure inspections prior to concreting, check steel bar arrangements, size as per drawings, from work integrity and strength, dimensional checking, check and review survey, cleanliness, check anchor bolts base plates or other shown on drawings.
♦ Post concrete inspection- check form work removal, curing, checks for honey comb or cracks.
♦ Surveillance of backfilling if required depth is being followed and assured the correct material being used.
♦ Ensure the materials used are approved by company and satisfy the requirements and specifications.
♦ Monitor, review and approved Quality Control Documentation progressively compiled during the project to ensure that all activities are recorded and reported as required.
♦ Support the Project Management Team and QA/QC Manager.
♦ Conduct all work activities in a safe and environmentally responsible manner at all times by not taking on any task(s) that are received as unsafe. Complies with the HSE management system and reports all incidents and near misses to the supervisor or HSE representative.

Field Engineer في HANJIN HEAVY INDUSTRIES & CONST., CO. LTD.
  • الفلبين
  • فبراير 2005 إلى مارس 2006

♦ Check and monitor contractors activities to ensure compliance to the plans and specifications.
♦ Check/review contractors statistical report and progress billing. ♦ Prepare and submit required report.
♦ Direct and supervise layout and excavation of columns, footings and tie girders. ♦ Direct and supervise the fabrication and installation of reinforcing steel bars for footings, columns, girders, beams, concrete slab and stairs.
♦ Supervise formworks and concreting works.
♦ Finishing works.
♦ Prepare accomplishment report and progress billing.

Field Engineer في HYUNDAI ENG’G & CONST., LTD.
  • الفلبين
  • مارس 2001 إلى مايو 2001

Bohol-Leyte Interconnection Project
Ubay Bohol

Duties & Responsibilities:
♦ Direct and supervise the fabrication and installation of reinforcing steel bars.
♦ Direct and supervise concreting works.
♦ Supervise the construction of remaining structures and finishing works necessary for the completion & preparation for final turnover to the project owner.

Field Engineer في AER CONSTRUCTION & DEVELOPMENT CO., INC
  • الفلبين
  • يناير 2000 إلى مارس 2001

Bohol-Leyte Interconnection Project
Ubay Bohol

Duties & Responsibilities:
♦ Direct and supervise the fabrication and installation of reinforcing steel bars.
♦ Direct and supervise concreting works.
♦ Direct and supervise the fabrication and installation of concrete forms, ganged form for wall, table form for slab and circular form.
♦ Direct and supervise the installation of scaffolding.
♦ Supervise construction work to ensure compliance to the plan and specification.
♦ Update and prepare accomplishment report and progress billing.

الخلفية التعليمية

بكالوريوس, Bachelor of Science in Civil Engineering
  • في University Of Bohol
  • أكتوبر 1999

Specialties & Skills

Materials
Aggregates
Inspection
quality control
microsoft (word, excel & powerpoint)
microsoft word
microsoft power point
microsoft
autocad

اللغات

الانجليزية
متوسط
الفيلبينية
متمرّس

العضويات

Saudi Council of Engineers
  • member
  • January 2019

الهوايات

  • sports
  • music and sports