electrical engineer
SEPCO Arabia
Total years of experience :5 years, 4 Months
Responsibilities: Responsibilities: MVcablestesting(SheathIntegritytesting, IRtesting, VLF testing). MVsinglecoreand3corecablesplicingandtermination. MVcableSheathfaultlocating. SECsubstationoutgoingcablesterminationandtorquing. Incomercablessplicing, TerminationandTorquing. executeddirectburiedtrenchcablepulling. MVcablesgroundingandGlandgrounding. Monitoringthesubstationcablestesting, splicing, terminationandtorquingactivity. SubstationBOM(BulkofQuantity)andMTO(MaterialTake Over)preparations. ElectricalSystemInstallationaboveandbelowground. HighmastLightingsysteminstallation InvolvedinEarthingsystemtesting. InvolvedinRMUcabletermination. ModularsubstationHVcableTerminatiotio
Project:MasterGasSystemExpansion(MGSE)--Eastern RegionPipelineBGCS#1(Phase-IIProjects)
Responsibilities: Drawingreview, RedmarkingaspersiteconditionandFCN preparation. BulkofQuantitydocumentpreparation. LightingSysteminstallationasperDrawing. SmallDB'ssysteminstallationasperdesignedsystem. MonitoringSystemgroundingandEquipmentGroundingas perstandard. Provisionofdailyprogressreporttoclient. ExecutedprojectLVcablePullingasperaramcoquality standard ElectricalEquipmentInstallation. LVCableTerminationandsplicing. Earthingsystemtesting.
Project:ExpandDharanResidentialCommunity. BuildingWiringforsmallDB'sasperDrawing Groundinggridinstallationasperdesignedsystem LightingsystembuildingInternalandoutdoor. GroundingcablesCADwelding. ExecutedLVandMVcablepulling. BuildingCabletrayInstallationasperdesignedsystem underaramcoQualitystandard. EarthingSysteminstallationandEarthingtest LVcabletesting(ContinuityandIRTest)
I had worked there as a electrical site engineer. This was construction project name canary residential villa compound. my primary responsibility was to ensure the electrical work ongoing as per electrical drawings.
BuildingWiringforsmallDB's. BuildingLightingsystemandstreetlightinstallation. LVcablepullingandcabletrayinstallation. Electricalequipmentinstallation. LVcablesplicingandTermination. ElectricalPanelInstallation.
I completed my electrical engineering degree in 2015 with specialization of power. During my study i was an average student. I completed my degree in my 4 years. I gained valueable knowledge about electrical engineering