Cadd leader
Petro Rabigh Petrochemical
Total years of experience :22 years, 0 Months
Projects List :
- INSTALLATION OF NEW HYDROCARBON Drain PIPELINE NETWORK AT BBTX PLANT YANSAB
- Installation of Pigging permanent facility for Methanol shipping line-Yansap
- HYDROGEN PIPELINE NETWORK IN ROYAL COMMISSION YANBU
-Replace Caustic Circulation Pump, YR
Detailed Engineering of ARAMCO Naphtha Project B;
Part-1 (YNGL)
-INSTALLING NEW DEAERATOR PUMP WITH MOTOR
V83-G-122B, YNGL (#15W067)
-Design Services for MOV's, ZV's, Upgrade Marine FCV and
New Air Compressor (P.O. No. 8510720339)
Internal course:
Foundation Training for ISO 9001:200 SGS Inspection Services
Projects list:
• Tie-in 7 Gas Wells to HWYH/HRDH/UTMN/GHZL Gas Gather Manifolds & GHZL R/H
• As-Built Drawings for South Haradh Gas Wells & Remote Headers - AB
• Sprinkler System at Jeddah Refinery Laboratory Building WJ-149 - CD
• Replace CCC & GP and Install PMS at JR - DD
• Ar-Rehab Potable & Fire Water System - CD
• Upgrade the existing MCC’s at Turaif Bulk Plant
• Installation of Smoke Detection System for Several Buildings at JR
• High-high Level Switches at KAIA
• Renovation of Marine Admin. Bldg. @ Marine Terminal Facilities
• TRS & Comprehensive Relay Coordination of PDD Recommendation on Jeddah Refinery Protection System, Phase-I
• Boiler DCS & BMS at Jeddah Refinery
• Install JP-8 Chemical Injection Facility at Jeddah Refinery - DD
• New Closed Freshwater Circulating Cooling System - PP
• Installation of Smoke Detection System at Jeddah Refinery, Phase-I
• Installation of PI, TI & Flowmeter at Marine Area
• Installation of Two Electrical Firewater Pumps at Tabuk Bulk Plant
• Construct New Parking Lot at Jeddah Training Center - CD
• JR Critical Rotating Equipment Protection - CD
• Installation of EIVs for all CGTGs & Shut-off Valve Switches (TK-249)
• Upgrade Gas Station at Jizan Bulk Plant - CD
• Provide Permanent Power Supply at Abha Bulk Plant
• Replacement of Chillers & Air Handling Units @ NGL Bldg. # 15
• Replacement of Chillers & Air Handling Units @ COT Bldg. # 804
• Installation of Lifting Pump Station with New Sewer Line Near WH # 06 at Yanbu NGL
Internal courses:
Microstation 95 / SE - Saudi Consult, Al-Khobar ( May 2002 to July 2002)
I/RAS VER. 5.0 - Saudi Consult, Al-Khobar (June 2002 to July 2002)
Mechanical Piping Training - Saudi Consult, Al-Khobar (February 2003 to April 2003
Projects list:
CFC Phase-Out Chiller Repalcement Phase-1 (JO-3415) - Detailed Engineering
Relocate RO-1 Product Pipeline (Riyadh, Qassim)
SCECO Substation - Standard 69/13.8KV S/S With Cable Basement
Security Gate House
Upgrade Anti-Foam Injection System - Riyadh Refinery
Safety Shower & Eye-Wash at Nalco Chemical Area - Riyadh Refinery
Install K.O. Drum to Caustic Regeneration System - Riyadh Refinery
Diploma courses: Course in 3D & 2D Autocad Course Solidwork Basic Engineering Drawing Basic Workshop Information Technology Skills English Language Database and Oral Presentation Work Ethics Assembly and Detail Drawings