QA Manager
Asphalt Product
Total years of experience :14 years, 7 Months
Takes Quality Management system responsibilities
• Mange the implementation of the organization's QC strategy to ensure delivery of quality projects to the clients
• Analyze and monitor performance of project QC teams against schedule and reflect in monthly and quarterly project review meetings
• Ensure maintaining the company’s quality certifications
• Ensure periodic reviews and updates of the processes & procedures related to QC
• Support in managing the preparation of periodic QC management information systems (reports & other communications)
• Ensure Legal and Regulatory compliance in QC matters
• Identify and track KPIs for the QC function, and devises plans and initiatives for business and operational improvements
• Manage the development of the company’s expertise, know-how, and capabilities in QC
• Ensure the QC policy and standards are maintained and updated at all times
• Manage the development and execution of QC strategy to comply with international standards
• Ensure QC policy is put in place to minimize hazards
• Ensure the QC coordination takes place with all parties for the execution of periodic audits
• Report the function’s performance regularly to the QHSE Director
• Develop and implement Quality Management System for planning, fabrication, inspection, documentation, and operations activities
• Plan duties for Corporate QC staff
• Ensuring that the process needed for the QMS, are established, implemented and maintained.
• Reporting to top management on the performance of the QMS and any needs for improvement
• Authorize to issue the direction related to the work
• Taking full responsibilities for hold-point releases once all QMS functions have been completed and the equipment is ready to go to the next work stage.
• Authorize to manage and coordinate the work
• Managing plant integrity through a failure analysis reporting system and following up on the recommendations and;
• Identify and develop solutions to correct inspection function deficiencies.
• Liaison with external parties, on the matter related to the QMS.
• Ensure the performance of awareness of customer requirements throughout organization.
• Monitoring the implementation of QA/QC plan.
• To report regularly about quality performance and deficiency trends.
• To report monthly observation statistics.
• Quality: Follow-up quality alerts & contingency plans.
• Manage the day-to-day responsibilities of the QA/QC team in accordance with the company’s policies and procedures and meeting the approved budget
• Manage the responsibility for all QA/QC activities at all facilities and work sites
• Support the QHSE Director in advising the Executive Management at the level of tendering, business development in relation to QA/QC
• Mange the implementation of the organization's QA/QC strategy to ensure delivery of quality projects to the clients
• Analyze and monitor performance of project QA/QC teams against schedule and reflect in monthly and quarterly project review meetings
• Ensure maintaining the company’s quality certifications
• Ensure periodic reviews and updates of the processes & procedures related to QA/QC
• Support in managing the preparation of periodic QA/QC management information systems (reports & other communications)
• Ensure Legal and Regulatory compliance in QA/QC matters
• Identify and track KPIs for the QA/QC function, and devises plans and initiatives for business and operational improvements
• Manage the development of the company’s expertise, know-how, and capabilities in QA/QC
• Ensure the QA/QC policy and standards are maintained and updated at all times
• Manage the development and execution of QA/QC strategy to comply with international standards
• Ensure QA/QC policy is put in place to minimize hazards
• Ensure the QA/QC coordination takes place with all parties for the execution of periodic audits
• Report the function’s performance regularly to the QHSE Director
• Develop and implement Quality Management System for planning, fabrication, inspection, documentation, and operations activities
• Plan duties for Corporate QA/QC staff
• Identify and develop QA/QC personnel certification requirement
• Lead, mentor and manage QA/QC personnel at project level
• Develop and maintain business Quality policy and standards
• Develop and maintain integrated business management system
• Develop corrective preventive action report
• Ensure projects have developed and followed the inspection and test plan
• Manage inspection and verification of construction & installation works & permanent material verification
• Monitor and ensure timely closure of Non-conformance report - External, Internal NCR & Observation notes
• Adapt company procedures to be followed for the proper control of documents in conformance with ISO 9001:2015
• Conduct periodic Management Reviews
• Ensure proper Document Control process for receiving, distributing and archiving documents & records in the document management system Accountable for ensuring the document distribution matrix is followed and implemented
• Ensure an appropriate security for information systems
• Ensure effective internal and external communication
• Monitor that batching must be sequence.
• Check the mixer when comeback there is no water inside the mixer put by driver.
• Check slump, temperature of every truck batch.
• Check temp of chiller water, ph. TDS of mixing water.
• Raise R.F.I for next day inspection for sub-grade, layers of mix material sand for achieving level of marl capping.
• Inspection of surfaces of all layers.
• Then put all approved to their selected box.
• Issue internal N.C.R then also closes it after recovers it.
• Check as-built survey of marl capping and roads for hand over the area.
• Working at concrete batch plant.
• Inspect surface for lean concrete.
• Check rebar’s installing, form works, spacing, chamfer sticks location, angle bars location and cleaning then raise R.F.I to client for inspection.
• Monitor concrete pouring.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
• Check the mixer when comeback there is no water inside the mixer put by driver.
• Check slump, temperature of every truck batch.
• Check temp of chiller water, ph. TDS of mixing water.
• Raise R.F.I for next day inspection for sub-grade, layers of mix material sand for achieving level of marl capping.
• Inspection of surfaces of all layers.
• Then put all approved to their selected box.
• Issue internal N.C.R then also closes it after recovers it.
• Check as-built survey of marl capping and roads for hand over the area.
• Working at concrete batch plant.
• Inspect surface for lean concrete.
• Check rebar’s installing, form works, spacing, chamfer sticks location, angle bars location and cleaning then raise R.F.I to client for inspection.
• Monitor concrete pouring.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
Monitor concrete pouring.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Check Aggregates, Sulfur & Filler source is approved.
• Stock aggregate under shelter and identification tag must put on all types.
• Random checking of batch.
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
Monitor concrete pouring.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Check Aggregates, Sulfur & Filler source is approved.
• Stock aggregate under shelter and identification tag must put on all types.
• Random checking of batch.
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Check Aggregates, Sulfur & Filler source is approved.
• Stock aggregate under shelter and identification tag must put on all types.
• Random checking of batch.
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
• Check the mixer when comeback there is no water inside the mixer put by driver.
• Check temperature of every truck batch.
• Monitor concrete pouring.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete is being batched as per approved mixing proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Check Aggregates, Sulfur & Filler source is approved.
• Stock aggregate under shelter and identification tag must put on all types.
• Random checking of batch.
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
Check calibration of plant.
Make sure that each mix design is allotted uniform code.
To verify that plant possess approved mix design copy as a part of documentation.
Make sure that concrete is being batched as per approved mixing proportions.
Periodic checking of plant calibration.
Ensure that all concrete raw materials are being procured by approved vendors.
To verify also that all raw material test results reports has been submitted to client.
Daily check the plant condition.
Check Aggregates, Sulfur & Filler source is approved.
Stock aggregate under shelter and identification tag must put on all types.
Random checking of batch.
Keep record of all mix design using at our project.
Monitor that batching must be sequence.
Check the mixer when comeback there is no water inside the mixer put by driver.
Check temperature of every truck batch.
Update material and specify process
Perform material and process projects.
Offer material information and data to Engineering
Design workable project plans and timelines to reach goals.
Conduct and ensure in-depth Fracture Analysis and Technical
Reports.
Extend hands-on materials engineering support to design,
quality and manufacturing staff.
Inspection of QA/QC procedure of client/consultant.
Conduct daily surveillance and civil works inspection in
accordance to
approved ITP'S and standards.
Proper documentation of QA/QC files.
Conduct the daily surveillance on the site.
Conduct inspections on the items requested for inspection.
Keep record of all mix design using at our project.
Monitor that batching must be sequence.
Check the mixer when comeback there is no water inside the mixer put by driver.
Check slump, temperature of every truck batch.
Check temp of chiller water, ph, TDS of mixing water.
Raise R.F.I for next day inspection for sub-grade, layers of mix material sand for achieving level of marl capping.
Inspection of surfaces of all layers.
Monitor the F.D.T with technician in the presence of P.I.D
Attached F.D.T with R.F.I and submits to P.I.D for approved it.
Then put all approved to their selected box.
Issue internal N.C.R then also closes it after recovers it.
Check as-built survey of marl capping and roads for hand over the area.
Working at concrete batch plant.
Inspect surface for lean concrete.
Check rebar’s installing, form works, spacing, chamfer sticks location, angle bars location and cleaning then raise R.F.I to client for inspection.
Monitor concrete pouring.
Check calibration of plant.
Make sure that each mix design is allotted uniform code.
To verify that plant possess approved mix design copy as a part of documentation.
Make sure that concrete is being batched as per approved mixing proportions.
Periodic checking of plant calibration.
Ensure that all concrete raw materials are being procured by approved vendors.
To verify also that all raw material test results reports has been submitted to client.
Daily check the plant condition.
Check Aggregates, Sulfur & Filler source is approved.
Stock aggregate under shelter and identification tag must put on all types.
Random checking of batch.
Keep record of all mix design using at our project.
Monitor that batching must be sequence.
Check the mixer when comeback there is no water inside the mixer put by driver.
Check temperature of every truck batch.
Chemical Process and new technology research.
3 year diploma of Associate Engineer is equal to intermediate.