Planning Engineer
Farabi Petrochemicals Company
Total years of experience :16 years, 10 Months
Business AND Strategic Planning Engineer:
• Manage the Feedstock, Utility supplies, & 3rd party interfaces that are essential for Plant Production.
• Work closely with Operation/ Procurements/Finance to ensure that RM receipt & certify payment as per supply agreements.
• Lead & facilitate discussions with 3rd parties on contract/supply reconciliations aspects.
• Lead & facilitate the 3rd parties metering calibration, Pipelines & custody inspections, maintenance & modifications.
• Manage & operate the supply chain of Farabi imported raw materials.
• Planning, Forecasting, Inventory Management of imported raw materials.
• Market study, pricing, supply sourcing risk analysis of imported raw materials.
• SABTANK Terminal Coordination, Logistics & customs clearance of imported raw materials.
• Assess suppliers performance & a member of Farabi imports Bidding team.
• Draft & participate in review of contracts / MOU’s/ LOI’s for supplies/ facility lease .
• Support strategic Planning in Technical assessment & contracting of feedstock/ utilities /land/ facility arrangement for growth projects.
• Participate in new Projects feasibility studies.
• Participate in Forecasting, Budgeting of yearly Business Plan in coordination with Sales & Operation.
• Feedstock & RM imports PO’s, stock updates, Dispatch plans in( AX ERP system)
Oil & Gas Processes Design & Engineer:
• Worked on PFDs and P&IDs.
• Relief Load and Orifice Area Calculations.
• Relief Valves Data Sheets.
• Control Valves Calculations and Data Sheets.
• Provide process information for Instrument specification sheets (ISS of: control valves, Pressure Gages, etc).
• General Hydraulic Calculations (Line Sizing).
• Fire Water Hydraulic Calculations (Elite Software).
• Prepared Line Designation Table (LDT) & Equipment List.
• Preliminary Design of Tanks & Vessels.
• New Projects Proposal Package preparation, man hours estimates.
Oil & Gas Processes Design & Engineer:
•Reviewed and updated existing PFDs and P&IDs for the new facilities.
• Material Balance.
• Prepared process information for Equipments Data sheets (Tanks and Pumps).
• Plants Visit to clients new unit expansions for site assessment & tie ins pts.
• Study International Standards & Clients like ARAMCO, SABIC Procedures.