Total Years of Experience: 19 Years, 7 Months
September 2021
To Present
MEP Project Manager
at EGICAT
Location :
Egypt - Asyut
petrojet - ANOPC
March 2019
To March 2022
Project Manager
at Sraco
Location :
Saudi Arabia - Abha
Hospitals Facilities Management
June 2020
To September 2021
MEP Area Manager
at ECD
Location :
Egypt - Cairo
banks, commercial renovation
October 2017
To May 2018
Project Manager
at Amer Group
Location :
Egypt - Cairo
MEP Project Manager for Porto Pyramids project
April 2016
To October 2017
consultant
at Alexander Proudfoot
Location :
Egypt
Participate in implementing lean six sigma - Lafarge Egypt.
November 2014
To April 2016
Project Manager - Devolper
at AZMEEL Contracting
Location :
Saudi Arabia - Jubail
MEP Project Manager
SATORP - SAUDI ARAMCO TOTAL (Housing Ownership Program) Project.
106 villas (EPC)
Fully responsible to manage the design, Shop Drawings, construction and execution of the project.
Schedules, Budgets, Cost Control, Value Engineering, Specifications, Procurement, and Subcontractors are all under the scope of my role.
Manage Engineers & Project Team, Prepare and Present Reports to Management, Establish KPIs and monitoring them.
Manage as required project to ensure on time delivery, with the required specs and within budget.
SATORP - SAUDI ARAMCO TOTAL (Housing Ownership Program) Project.
106 villas (EPC)
Fully responsible to manage the design, Shop Drawings, construction and execution of the project.
Schedules, Budgets, Cost Control, Value Engineering, Specifications, Procurement, and Subcontractors are all under the scope of my role.
Manage Engineers & Project Team, Prepare and Present Reports to Management, Establish KPIs and monitoring them.
Manage as required project to ensure on time delivery, with the required specs and within budget.
March 2007
To July 2014
Project Manager
at Egyptian Airports Company (EAC) joint venture with French Aero ports De Paris [ADP] Management
Location :
Egypt - Luxor
implementing the program for development LUXOR International Airport- Funded from the world bank (550 million EGP).
My role in the program - Electromechanical Project Manager - Key responsibilities include management and planning: -
1- All the new projects related to,
Generation stand by system
Pumping system
ABHS (Airport Baggage Handling System)
BMS (Building Management System)
HVAC, Child water System (Electricity and electronics)
Elevators
Escalators
Automatic sliding doors.
2- The operation and maintenance activities for the mentioned above systems, plus Analysis, plan and execute maintenance contracts effectively to ensure that the budgeted profitability is achieved.
3- team player with PMO team for needed Project Management Plans (PMP) -
Tracking current projects.
ON - THE- JOB TRANING
Allen Bradley PLC-5 (SLC 5/04), ROCKWELL Software for Allen Bradley
RS logix500 programming.
Schneider - electric UNITY PRO XL PLC programming
HMI, Allen Bradley Panel builder 32
TRAINING
Self-inspection for airports (Egyptian civil aviation authority)
My role in the program - Electromechanical Project Manager - Key responsibilities include management and planning: -
1- All the new projects related to,
Generation stand by system
Pumping system
ABHS (Airport Baggage Handling System)
BMS (Building Management System)
HVAC, Child water System (Electricity and electronics)
Elevators
Escalators
Automatic sliding doors.
2- The operation and maintenance activities for the mentioned above systems, plus Analysis, plan and execute maintenance contracts effectively to ensure that the budgeted profitability is achieved.
3- team player with PMO team for needed Project Management Plans (PMP) -
Tracking current projects.
ON - THE- JOB TRANING
Allen Bradley PLC-5 (SLC 5/04), ROCKWELL Software for Allen Bradley
RS logix500 programming.
Schneider - electric UNITY PRO XL PLC programming
HMI, Allen Bradley Panel builder 32
TRAINING
Self-inspection for airports (Egyptian civil aviation authority)
March 2005
To March 2007
Field Engineer
at Islamic Group Companies
Location :
Egypt - Cairo
Key responsibilities include troubleshooting and repair work for equipments including in Bi Oriented Polypropylene (BOPP) Films Production Lines for: Buckner & DMT, Kmpf & Atlas Slitters, Galileo & general Metelizer Machines, Factory Utilities Engineering.
ON - THE- JOB TRANING
Achieve Automation (Process Control) & Maintenance Work for:
MCC (Machine Control Center) With AC & DC Drives For:
Siemens simovert master drive \[MC, VC\], simoreg K.
Telemecanique Rectivar, Altvar 66, 68
Hand on skills In Signal & Power Electronics.
PLCS Hardware Configuration (commissioning & start up) for
Siemens S5, S7.
Telemecanique X-Tel
PLCS & SCADA Software:
PLC programming for Siemens s5, s7 (SIMATIC Manager).
PLC programming for X-Tel Pl7 (telemecanique).
CITECT (SCADA), Diagnostics & troubleshooting
Achieve Instrumentation & Calibration Works.
AchieveUtilities maintenance work (Boilers-chillers-Compressors-Cooling towers).
ON - THE- JOB TRANING
Achieve Automation (Process Control) & Maintenance Work for:
MCC (Machine Control Center) With AC & DC Drives For:
Siemens simovert master drive \[MC, VC\], simoreg K.
Telemecanique Rectivar, Altvar 66, 68
Hand on skills In Signal & Power Electronics.
PLCS Hardware Configuration (commissioning & start up) for
Siemens S5, S7.
Telemecanique X-Tel
PLCS & SCADA Software:
PLC programming for Siemens s5, s7 (SIMATIC Manager).
PLC programming for X-Tel Pl7 (telemecanique).
CITECT (SCADA), Diagnostics & troubleshooting
Achieve Instrumentation & Calibration Works.
AchieveUtilities maintenance work (Boilers-chillers-Compressors-Cooling towers).
September 2003
To March 2005
Project Engineer
at Multinational (Japan) electromechanical constructions KINDEN corporation
Location :
Egypt - Cairo
In The Pump Station Project of water Improvement for Northern
Pyramids Area. \[Japan's aid\].
Key responsibilities include Installation Work For:
\[Indoor & Outdoor Lighting - Underground Cables - Emergency and standby Systems - Circuit Breakers - Bus Bar and Bus Duct - Low Voltage Distribution Systems - Medium Voltage Power Supply and Distribution Systems - Power Factor Correction system-Earthing System - Fire Alarm System - Lightning System- Control Panels Commissioning\]
ON - THE- JOB TRANING
AutoCAD Shop drawing & as built for Electrical Systems in Electromechanical Projects
Pyramids Area. \[Japan's aid\].
Key responsibilities include Installation Work For:
\[Indoor & Outdoor Lighting - Underground Cables - Emergency and standby Systems - Circuit Breakers - Bus Bar and Bus Duct - Low Voltage Distribution Systems - Medium Voltage Power Supply and Distribution Systems - Power Factor Correction system-Earthing System - Fire Alarm System - Lightning System- Control Panels Commissioning\]
ON - THE- JOB TRANING
AutoCAD Shop drawing & as built for Electrical Systems in Electromechanical Projects
Share on Facebook
Share on Twitter
Share Via Email