Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Fakhr_Ul Hassan, Infra Quality Control Engineer

Fakhr_Ul Hassan

Infra Quality Control Engineer·Alstom Dubai

United Arab Emirates

Bachelor's degree, civil

Work experience

Total years of experience: 21 years, 8 months

Infra Quality Control Engineer

March 2017 - Present

Alstom Dubai

Dubai, United Arab Emirates

March 2017 - Present

In this organization my responsibilities are;
Preparation of ITP, Preparation of Checklist, Preparation of ITR, Preparation on MIR, Review of Quality Procedure, review of FAT Procedure, attending the FAT Inspection, Site Inspection with Engineer and assign work for the Quality Inspectors.

Company industry:
Construction & Building
Job role:
Engineering

Quality Control Engineer

December 2013 - December 2016

OHL Arabia

Jeddah, Saudi Arabia

December 2013 - December 2016

• Installation of Sub Ballast layer, 1st Layer of Ballast, Mono block & B-Block Sleepers.
• Assembling of Ballast Track i-e Installation of Sleepers, Long Welded Rails, Unloading of 2nd layer of ballast, Tamping, and Profiling of Ballast.
• Supervision of Railway Welding Procedure and Weld Construction Works, Aluminothermic Welding PLA Process (Oxy-Propane) Mainline & Crossovers.
• Supervision of Flash Butt Welding, Fixed Plant @ Welding Train and MFBW - VAIA Car & MFBW Welding System Serstar V.
• Supervision of Production & Unloading of Long Welded Rails (LWR); Evaluation of Weekly Bend Tests of Flash Butt Welds on the Welding Train
• Geometrical Check after Final grinding of welded joint on Track by Recti Rail.
• Supervision of Rail Destressing with Rail Tensors + Mobile FBWM - VAIA Car, SERSA MFBW Welding System - Serstar V.
• Long Welded Rails to Continuous Welded Rails - CWR Formation.
• Assembling and Installation of High Speed Track Turnout & Crossover.(R318, R500, R1760, R15000 & R10, 000)
• Supervision the work of Tamping Machine, Ballast Regulator and Track Stabilizer Machine.
• Installation of Hydraulically Bounded Layer of Concrete (Mass Concrete Layer MCL, Slab Track) with the Power Paver SF-1700.
• Installation of 2nd Layer of concrete of REHEDA-2000 Track System (Slab Track).
• Supervision of setting steel work, formwork of concrete, Temperature of Concrete & Pouring of Concrete.
• Carry Out the inspection according ITP, Preparation of QC Site Inspection Note, Checklist and Submitting the RFI and Reply of the amendments.
• Joint inspection with consultant. (DB International).

Company industry:
Civil Engineering
Job role:
Quality Control

Permanent Way Inspector

July 2012 - December 2013

Pakistan Railways

Quetta, Pakistan

July 2012 - December 2013

• Renewal of Railway Track, Rails, Sleepers etc.
• Inspection and Maintenance of all work related with the railway Track.
• Installation & maintenance of Rail Road level crossing.
• Installation & maintenance of Railway line culverts and bridges.
• Inspection & maintenance of Railway line side drains and catch water drains.
• Inspection & maintenance of Railway line tunnels.
• Assembling, Installation and maintenance of Turnouts.
• Manage the gang leaders and labors.
• Preparation of estimate for ballast, Sleepers & rails etc.
• Responsibility of store.

Company industry:
General Engineering Consultancy
Job role:
Quality Control

Track Supervisor

June 2011 - June 2012

Al Mobty Company for Contracting

Dammam, Saudi Arabia

June 2011 - June 2012

• Assembling of Turnout & replacement.
• Construction of new Railway lines.
• Supervision of Ballast cleaning project.
• Supervision of Complete Track Renewal project.
• Supervision of Tamping Machine work and Ballast Profile Machine work.

Company industry:
Construction & Building
Job role:
Quality Control

Permanent Way Inspector

August 2009 - June 2011

Pakistan Railways

Peshawar, Pakistan

August 2009 - June 2011

• Renewal of Railway Track, Rails, Sleepers etc.
• Inspection and Maintenance of all work related with the railway Track.
• Installation & maintenance of Rail Road level crossing.
• Installation & maintenance of Railway line culverts and bridges.
• Inspection & maintenance of Railway line side drains and catch water drains.
• Inspection & maintenance of Railway line tunnels.
• Assembling, Installation and maintenance of Turnouts.
• Manage the gang leaders and labors.
• Preparation of estimate for ballast, Sleepers & rails etc.
• Responsibility of store.

Company industry:
Construction & Building
Job role:
Quality Control

track Supervisor

July 2008 - July 2009

Saudi Archirodon Co.

Hafr Albaten, Saudi Arabia

July 2008 - July 2009

• Preparation of Rail panels.
• Supervision the loading of Rail panels & Sleepers.
• Work with CPG500 Track - Laying Machine.
• Check the quality of work in the back of CPG500 Track - Laying Machine.
• Manage the gang leaders and labors.

Company industry:
Construction & Building
Job role:
Engineering

Assistant Way Inspector

September 2005 - July 2008

Pakistan Railways

Peshawar, Pakistan

September 2005 - July 2008

• Renewal of Railway Track, Rails, Sleepers etc.
• Inspection and Maintenance of all work related with the railway Track.
• Installation & maintenance of Rail Road level crossing.
• Installation & maintenance of Railway line culverts and bridges.
• Inspection & maintenance of Railway line side drains and catch water drains.
• Inspection & maintenance of Railway line tunnels.
• Assembling, Installation and maintenance of Turnouts.
• Manage the gang leaders and labors.

Company industry:
Construction & Building
Job role:
Engineering

Sub Engineer Civil

July 2002 - July 2003

Khalid Rauf and Co. pvt

Islamabad, Pakistan

July 2002 - July 2003

• Planning and Supervision of Civil Work.
• Preparation of daily progress report and material requirement report and submission to Construction Manager.
• Execute job in professionally sound manner and full filly the HSE requirements.

Company industry:
Construction & Building
Job role:
Civil Engineering

Education

SARHAD UNIVERSITY BANNU

December 2016

December 2016

Bachelor's degree, civil

Pakistan

Skills

Office Work
Expert
Office Work
Expert
Field Work
Expert
Field Work
Expert
QC
Expert
QC
Expert
Rail
Expert
Rail
Expert
Civil
Expert
Civil
Expert
railway track work
Expert
railway track work
Expert
Civil Work
Expert
Civil Work
Expert
P-Way Work
Expert
P-Way Work
Expert
Railway Track Work
Expert
Railway Track Work
Expert
Office Work
Expert
Office Work
Expert
Field Work
Expert
Field Work
Expert
QC
Expert
QC
Expert
Rail
Expert
Rail
Expert
Civil
Expert
Civil
Expert

Languages

English

Expert

Arabic

Expert

Urdu

Expert

Pushto

Expert

Spanish

Intermediate

Training and Certifications

Training
Theory and Practical
Railway Track Training
Sep 2005

Hobbies and interests

Computer