Farid Najari, Maintenance Senior Engineer Planner

Farid Najari

Maintenance Senior Engineer Planner

Arya Sasol

البلد
إيران - Tehran
التعليم
دكتوراة, Industrial Engineering & Management
الخبرة
16 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 3 أشهر

Maintenance Senior Engineer Planner في Arya Sasol
  • إيران - Tehran
  • أشغل هذه الوظيفة منذ يناير 2008

Preparation of WBS & progress measurement system (PMS) based on contract; define stages for activities progress and quantity measurement.
Preparing different periodical and case reports include Progress& Cost Status, Quantity Curves& Reports, Schedule Review Report, ...
Raise work orders within the ERP for CM Corrective maintenance Work Order
Coordinate with the maintenance and operations team in the management of the maintenance daily work activities
Provide operational input into modification projects
Progression of the planned and unplanned work orders through planning and work stages to completion
Coordination of materials associated with work orders
Update work orders for actual labor craft, work class, scheduling time and date, work condition
Using Document and Warehouse during planning activity
Create, amend or cancel Preventive Maintenance schedule or work orders by raising Management Of Change (MOC) forms as required
Coordinate all active MOC forms for review, approval, authorization, implementation and finally completion
Participate in the improvement of ERP by attending clients meetings for changing awareness
Prepare ahead plans in MS Project for maintenance and operation works
Advise material specification of pipe works, tanks, and vessels

الخلفية التعليمية

دكتوراة, Industrial Engineering & Management
  • في Kharazmi university
  • ديسمبر 2018

First mentioned the combination of selected techniques for the resolution steps after collecting data. In the first technique, AHP-G, the final weight of the failure probability and the consequences of failure for each asset were identified. Second step was to evaluate to prioritize all possible failure modes in order to finally choose the most appropriate maintenance strategy for each failure mode. The techniques selected for this evaluation were three WASPAS-G, MULTIMOORA-G, and EDAS-G techniques, because these techniques are a fast and functional way of HMCDM. In the third step, the optimal maintenance and repair strategy was performed for each of the failure modes using the three techniques TOPSIS-G, COPRAS-G, ARAS-G.

ماجستير, Industrial Engineering & Management
  • في Tehran Polytechnic University
  • أكتوبر 2012

In this treatise, systems that were repairable and non-repairable were separated using the system boundaries. By demonstrating that MFOP is a reliable metric relative to MTBF, it has been shown that the concept of MFOP not only succeeds in the petrochemical field but also can add measurable value in terms of optimizing maintenance activities.

بكالوريوس, Industrials Engineering -Production Industry
  • في Shomal University
  • سبتمبر 2004

Studied books of Industrial Engineering and learned of beleow skills: Analytical Skills · Statistical Data Analysis · Ergonomics · Statistical Process Control (SPC) · Research and Development (R&D), Operation Research

Specialties & Skills

Primavera P6
Schedule Planning
Plant Maintenance
Project Planning
Maintenance Planning
PRIMAVERA & MS Project & MS Office
Maintenance Planning
Project Execution
Materials Management
Maintenance Engineering
Maintenance Management
Cost/Budget Monitoring & Control
Resource Planning & Forecasting
EPC Project
Progress Monitoring & Control
Project Planning & Scheduling
Delay Analysis, EOT& Claim
Critical Path Analysis & Recovery Plans
Performance Measurement using EVM

حسابات مواقع التواصل الاجتماعي

انستغرام
انستغرام
instagram.com/farid.najari

اللغات

الانجليزية
متمرّس
الفارسية
متمرّس
الاذربيجانية
متمرّس

العضويات

ARYASASOL POLYMER COMPONY
  • PETROCHEMICAL
  • December 2008

التدريب و الشهادات

Project Management Professional (PMP) Certificate Course (تدريب)
معهد التدريب:
Fan Pardaz
تاريخ الدورة:
August 2008
المدة:
58 ساعة
Physical Asset Management (الشهادة)
تاريخ الدورة:
June 2015
Primavera (الشهادة)
تاريخ الدورة:
August 2010

الهوايات

  • Reading , Social Service, Travel