Farid Najari, Maintenance Senior Engineer Planner

Farid Najari

Maintenance Senior Engineer Planner

Arya Sasol

Lieu
Iran - Tehran
Éducation
Doctorat, Industrial Engineering & Management
Expérience
16 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 4 Mois

Maintenance Senior Engineer Planner à Arya Sasol
  • Iran - Tehran
  • Je travaille ici depuis janvier 2008

Preparation of WBS & progress measurement system (PMS) based on contract; define stages for activities progress and quantity measurement.
Preparing different periodical and case reports include Progress& Cost Status, Quantity Curves& Reports, Schedule Review Report, ...
Raise work orders within the ERP for CM Corrective maintenance Work Order
Coordinate with the maintenance and operations team in the management of the maintenance daily work activities
Provide operational input into modification projects
Progression of the planned and unplanned work orders through planning and work stages to completion
Coordination of materials associated with work orders
Update work orders for actual labor craft, work class, scheduling time and date, work condition
Using Document and Warehouse during planning activity
Create, amend or cancel Preventive Maintenance schedule or work orders by raising Management Of Change (MOC) forms as required
Coordinate all active MOC forms for review, approval, authorization, implementation and finally completion
Participate in the improvement of ERP by attending clients meetings for changing awareness
Prepare ahead plans in MS Project for maintenance and operation works
Advise material specification of pipe works, tanks, and vessels

Éducation

Doctorat, Industrial Engineering & Management
  • à Kharazmi university
  • décembre 2018

First mentioned the combination of selected techniques for the resolution steps after collecting data. In the first technique, AHP-G, the final weight of the failure probability and the consequences of failure for each asset were identified. Second step was to evaluate to prioritize all possible failure modes in order to finally choose the most appropriate maintenance strategy for each failure mode. The techniques selected for this evaluation were three WASPAS-G, MULTIMOORA-G, and EDAS-G techniques, because these techniques are a fast and functional way of HMCDM. In the third step, the optimal maintenance and repair strategy was performed for each of the failure modes using the three techniques TOPSIS-G, COPRAS-G, ARAS-G.

Master, Industrial Engineering & Management
  • à Tehran Polytechnic University
  • octobre 2012

In this treatise, systems that were repairable and non-repairable were separated using the system boundaries. By demonstrating that MFOP is a reliable metric relative to MTBF, it has been shown that the concept of MFOP not only succeeds in the petrochemical field but also can add measurable value in terms of optimizing maintenance activities.

Baccalauréat, Industrials Engineering -Production Industry
  • à Shomal University
  • septembre 2004

Studied books of Industrial Engineering and learned of beleow skills: Analytical Skills · Statistical Data Analysis · Ergonomics · Statistical Process Control (SPC) · Research and Development (R&D), Operation Research

Specialties & Skills

Primavera P6
Schedule Planning
Plant Maintenance
Project Planning
Maintenance Planning
PRIMAVERA & MS Project & MS Office
Maintenance Planning
Project Execution
Materials Management
Maintenance Engineering
Maintenance Management
Cost/Budget Monitoring & Control
Resource Planning & Forecasting
EPC Project
Progress Monitoring & Control
Project Planning & Scheduling
Delay Analysis, EOT& Claim
Critical Path Analysis & Recovery Plans
Performance Measurement using EVM

Profils Sociaux

Langues

Anglais
Expert
Persan
Expert
Azerbaïd
Expert

Adhésions

ARYASASOL POLYMER COMPONY
  • PETROCHEMICAL
  • December 2008

Formation et Diplômes

Project Management Professional (PMP) Certificate Course (Formation)
Institut de formation:
Fan Pardaz
Date de la formation:
August 2008
Durée:
58 heures
Physical Asset Management (Certificat)
Date de la formation:
June 2015
Primavera (Certificat)
Date de la formation:
August 2010

Loisirs

  • Reading , Social Service, Travel