technical engineer في solico fiberglass factory
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ فبراير 2019

• Preparing shop drawing and material submittal for GRP water tank
• Assist production manager in some technical data sheet in GRP panel
• Clarifying with salesman and consulting some miss understanding data
• Assist the production team with maximum of Cost control
• Assist the installation team in some special recommendation tanks
• Following complains with maintenance team and insure the complains are solved

mechanical engineer في Advanced national contracting
  • الإمارات العربية المتحدة - دبي
  • مارس 2017 إلى فبراير 2019

Assist in preparation and implementation of project execution plan ( PEP)
● Attend the weekly progress meeting ( internally as will as client ) and assist in preparation of minutes of meeting
●Monitoring work progress and prepare weekly report of the status of each assignment
● Ensuring all procedure and calculations are submitted to engineer for review and approval
● Coordinate material and assist in the logistics, it's shipment and receipt at construction site
●Progress work activity, procurement and operation to ensure timely completion of the project
● provide full support as required by the management and PMT for all projects

mechanical engineer في Al Gurg consultants
  • الإمارات العربية المتحدة
  • أكتوبر 2016 إلى مارس 2017

Review and Check Materials / Shop drawings submittals in accordance with contract document
• Review and Check Builders work drawing and coordination drawing
• Prepare all design drawing and calculation related to HVAC, water supply, drainage, equipment schedule
• Coordinate with all partners (MEP, Architectural, contact and follow up department
• Review and check method statements
• Establish inspection schedule, logs and check list
• Cary out routine site inspection and issue field instructions
• Inspect and check material delivered to the site
• Review and monitor progress of work
• Provide technical support and feedback to the site and design team
• Conduct regular site visit to ensure that execution as per contract document
• Follow up with draft man while preparing drawing
• Attend coordination meeting and weekly progress meeting with contractor
• Conduct site inspection, testing and handling over procedure
• Issued field instruction, NCRs letters, reply to contractor RFI
• Manage and control variation related to changes that might come as per client request, authorities as site condition requirement
• Check and approve material/shop drawing/ submittal
• Ensure the project execution and approved materials are as per contract document
• Report all cases ( variation and modification to the management
• Response to authority concerns and comments and do the required amendments

Mechanical Engineer في Drake & Scull International
  • الإمارات العربية المتحدة - دبي
  • ديسمبر 2014 إلى يونيو 2016

• To study all technical drawings, documents and any revisions thereon.
• Raise technical query for any conflict information within the project technical document
• To assist of preparing comparison report between tender documents and IFC documents in terms of materials quantities, specification and scope of work to commercial department to claim any variations in project objectives
• To supervise the construction in terms of proper method, material reservation and optimum output of labor.
• To give full and extensive instruction to his team.
• To execute the works according to the latest approved revision of drawings and /or
instruction of authorized authorities.
• Follow up of progress planning and arranging all its requirements
• Monitoring of Subcontractor’s performance.

• To pass all instructions issued to him by the authorized representatives to his manager to handle contractually prior to commencement. However, in some cases he should act immediately and then report.
• To ensure that the construction team are working to approved to the latest and
approved construction issue drawings
• To ensure that the construction issue drawings fully reflect the scope of works and
requirements of the contract
• To ensure that any variations and instructions received from the client are incorporated into the latest construction issue drawings and auctioned by the construction team
• To ensure that the quantity surveyor is aware of any such changes (reference above)
• Analyzing and resolving field problems.
• Reporting to management
• Materials take off from contract drawings
• Materials requisition
• To prepare pre commissioning reports if required
• To prepare red marked drawings for final AS Built Drawings

• Installing the HVAC system, AHU, FAHU, HMU, HTU, FCUs child water system, Extracting Fans and Balancing Fans
• Worked in firefighting system,
• Worked in child water system
• Good coordination between all services
• Contact with suppliers and making orders
• Worked in Testing and commissioning, HVAC testing and Commissioning Specialists CSA International LLC (Traverse reading of Air Flow in main branch in HVAC system and Air Terminals using the AIRFLOW INSTRUMENTS MULTI-FUNCTION ANEMOMETERS, AIRFLOW INSTRUMENTS MICROMANOMETERS, AIRFLOW INSTRUMENTS ROTATING VANES and AIRFLOW INSTRUMENTS PROHOOD CAPTURE HOOD, respectively
• Child water flow rate using Ultrasound device and mercury pressure difference.
• Making leakage test for, GI Duct, MS (Mild steel duct for Kitchens ), SS Duct (stainless steel duct ) using the AIRFLOW INSTRUMENTS POSITIVE AND NEGATIVE DUCT ACCREDITATION SYSTEM
• Good in technical issue and standards (SAMACNA ) of HVAC and ( NFPA ) for Fire fighting

Mechanical Engineer في FICHTNER Water & Transportation GmbH
  • الأردن - عمان
  • يوليو 2014 إلى نوفمبر 2014

• Detailed site inspections of approximately 115 wells and 15 pumping stations with the aim to define the necessary rehabilitation works as well as the interfaces (power, drinking water, access to the site etc.).
• Preparation of general layouts for approximately 105 wells (new operation building, pipe alignment, access to the site for construction and operation etc.)
• Preparation of bills of quantities for parts of the aforementioned sites

• Support to the senior mechanical Eng. of our project team (check of drawings etc.)

Mechanical Site Engineer في TAFF Contracting Establishment
  • الأردن - العقبة
  • مارس 2013 إلى مايو 2014

First project AL MADAEN MARKET project (13335m2) worked as Site Engineer (installation of mechanical equipment, Pumps, plumping, Ducted system (ventilation), Manholes And fire fighting System) &worked as Shop drawing, as-built drawing, Quantity Surveying & Document Control


2nd project: Quantity surveyor, Shop drawing and plumping for Steel Construction (Hanger of 1800m2) in Aqaba Industrial Zone


3rd project: Al Balqa’ University in Aqaba (866m2 worked as operating time & maintenance engineer (Of Chiller system (Petra Brand) and Fan Coil Unite with all pipes and fittings and plumping of the building ), As-Built drawing, quantity surveyor )


4th project: Castle of Wadi RAM worked as installation of Plumping Pipes, Fire fighting system, and AC Unite System

Mechanical Design Engineer في Dar AL Handasah Al Dowalya AL Hadetha
  • الأردن - اربد
  • أكتوبر 2011 إلى أبريل 2013

Mechanical design engineer in Dar AL Handasah Al Dowalya AL
Hadetha, Jordan -Irbid in (Drainage & sewage water, extensions of hot & Cold water and the basic of HVAC System Window Type & AC Split Unite wall mounted Residential & Commercial buildings

الخلفية التعليمية

ماجستير, Business Administration
  • في Swiss Business School Zurich
  • مارس 2018
بكالوريوس, Mechanical Engineer
  • في Jordan University of Science and Technology
  • سبتمبر 2011

Specialties & Skills

Microsoft Office
Primavera
Primavera P6
AutoCAD
Pro-Engineer
HVAC Softwear
Creo-Element
AutoCAD 2D-3D
Microsoft Office
Primavera P6

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

نقابة المهندسين الاردنيين
  • مهندس ميكانيك / قوى حرارية
  • September 2011

التدريب و الشهادات

Maintenance team (تدريب)
معهد التدريب:
Yarmok University
تاريخ الدورة:
August 2010
المدة: