Mechanical Project Engineer
National Project and Construction LLC
مجموع سنوات الخبرة :12 years, 11 أشهر
MECHANICAL PROJECT ENGINEER (Nov 2012 - present)
NATIONAL PROJECTS & CONSTRUCTION L.L.C.(A TROJAN HOLDING COMPANY)
www.npc.ae
Roles & Responsibilities
Preparation of Bill of Quantities (BOQ) and material take off for all Mechanical items (HVAC &Plumbing) including all Mechanical Equipment’s (AHU, FAHU, FCU, Chillers, Pumps etc.).
Verifying and identifying potential Vendors and submission of MTS based on Technical Comparative.
Follow up for Issuing LPO/ Contracts and expedite timely deliveries. Continues Follow up with Vendors, checking the Performance Rating and Management. Monitoring cost aspects of the project and taking action to avoid cost overruns.
Study of Design Drawings and preparation of Shop drawing.
Carrying out measure calculations including ESP calculations for FCU, AHUs, Fans etc. and Pump head calculations for Chilled water pumps and Domestic water supply and sewerage pumps.
Monitoring Mechanical Installation (HVAC & Plumbing) based on Design & Layout Prepared. Planning & controlling the Manpower, Work progress and Material based on the Overall Project program/schedule
Ensuring Progress of work Execution on site utilizing Clause & Program as well as look-ahead programs.Focuses team on achievement of milestones and other key project objectives.
Involving / responsibility for the production, implementation of necessary quality procedures, method statements for the works to be carried out/ undertaken inclusive of site survey / investigation tasks.
Requests for Information (RFI) as well as the Checking and verification of the response received and resubmission of same as necessary.
Ensuring safe working procedures are followed on site in conjunction with the Company HSE Plan and OHSE requirements Perform duties as may be assigned from time to time by management.
PROJECTS WORKED ON
• Baniyas North Development, Abu Dhabi,
United Arab Emirates (www.modon.ae)(On Going)
Description:-1365 Villas
Client:-Modon properties
Project Value:-481 million
• Yas Acers, Yas Island, Abu Dhabi,
United Arab Emirates (www.aldar.com)
Description:-652 Villas + Community Buildings
Client:-Aldar properties
Project Value:-215 million
• Bloom Marina, Al Bateen, Abu Dhabi, United Arab Emirates(www.bloomholding.com)
Description:- hotel & 5 residential buildings(G+5)
Client:-Bloom properties
Project Value:-121 million
• Hydra Avenue, Reem Island, Abu Dhabi, United Arab Emirates (www.hydraproperties.com)
Description:- 3 Towers (B+G+4P+24F)
Client:-Hydra properties
Project Value:-110 million
• VEDC, Al Shahama, Abu Dhabi, United Arab Emirates (www.vedc.ac.ae)
Description:- 8 Hostels (G+3)
Client:-CMW
Project Value:-76 million
Responsibilities:
• Monitor the Installation of PI SAD & GI Ventilation Duct in Building.
• Monitor the Installation of Split Unit in different Areas.
• Involved in the development of Machine Operation & Safety Operation log.
• Helped in creation of tools issue log for mechanical workshop
Responsibilities:
• In Sales Application Department worked in preliminary and final load calculation, equipment selection, cost estimation system design and
Furnishing quotations
• In Design Department worked in different Floor Shops such as the Coil Shop and Assembling Shop.
• Involved in the Final Testing of the Complete Units.
Internships
• Done 4 Months Internship at Toyota Islamabad Motors, Islamabad, Pakistan
• Done 2 Months Internship at Attock Refinery Limited, Rawalpindi.Pakistan
• Done 1 Month Internship at SNGPL, Islamabad, Pakistan
• BE Mechanical Engineering Aug, 2006 - Jun, 2010 Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, Pakistan. Aggregate 1st Division
• Higher Secondary School Certificate Aug, 2004-May, 2006 Gordon College Rawalpindi, Pakistan Aggregate 1st Division
• Secondary School Certificate July, 2002- May, 2004 Pilot Model High School Rawalpindi, Pakistan Aggregate 1st Division