Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Fazal rehman, Instrumentation QC inspector

Fazal rehman

Instrumentation QC inspector·Bin Quraya

Saudi Arabia

Bachelor's degree, ELECTRICAL ENGINEERING

Work experience

Total years of experience: 10 years, 10 months

Instrumentation QC inspector

August 2025 - Present

Bin Quraya

Jubail, Saudi Arabia

August 2025 - Present

Executed calibration of field instruments, including pressure indicator Transmitters, Temperature indicator Transmitters, pressure gauges, temperature gauges, Resistance Temperature Detectors, combustible and hydrogen sulfide detectors and transmitters, Motor operated valves, Motor control valves, and Pressure relief valves in accordance with project specifications and safety standards.
Performed tubing leak testing, loop checks, and functional testing of fire alarm systems and building management systems to ensure proper performance and operational reliability.
Reviewed loop folders to verify documentation accuracy and support installation and commissioning readiness.
Installed pressure indicator Transmitters, Temperature indicator Transmitters thermowell, flow indicator Transmitters with sensors, pressure gauges, sampling cabinets, oxygen analyzer cabinets, junction boxes, Remote Terminal Units, Motor operated valves, Motor control valves, and Pressure relief valves hydrogen detectors, horns and beacons, , corrosion probes, and associated transmitters.
Conducted cable laying, pulling, dressing, insulation resistance testing, torquing, and termination in line with approved drawings, specifications, and site procedures.

Company industry:
Project & Construction Planning
Job role:
Oil and Gas

QA/QC MANAGER

February 2022 - May 2025

SPF

Mingora, Pakistan

February 2022 - May 2025

Compliance with ISO 9001, 14001, 45001 and Goods manufacturing practices
Follow up with customer complaints and managing Corrective actions Preventive Actions & Root Cause Analysis & use of quality tools(Failure Mode Effect Analysis, Pareto chart, fish bone diagram, scatter diagram, flow chart
Ensure proper storage, handling, packing and transport
Ensure Company quality policy, SOP .
Perform audit, prepare audit report and quality management review report
Raw materials inspection, process monitoring & final product testing.

Company industry:
Manufacturing
Job role:
Manufacturing

Electrical & Instrumentation Materials Receiving QC INSPECTOR

March 2021 - January 2022

TEKFEN

Riyadh, Saudi Arabia

March 2021 - January 2022

Perform Materials receiving inspection of swithracks, panel boards, Remote terminal
units, circuit breakers, dry type transformers, Cathodic Protection materials battery
enclosure, above grade & below grade conduits and overhead power line materials.
Perform preservation according to manufacturer’s recommendations
Raise Non Conformance Report in reference to any violation.
Prepare over usage, shortage and damage) report,

Company industry:
Project & Construction Planning
Job role:
Oil and Gas

Electrical & Instrumentation QC Inspector

February 2019 - November 2020

AUVA

Dammam, Saudi Arabia

February 2019 - November 2020

Ensure that the material receiving, installation, testing inspections are carried out
according to Quality Control Plans/Inspection Test Plans, contract scope of work
, technical specification
 Verify the compliance of the equipment with applicable standards and specifications
prior to release to be used as part of the work.
 Ensure that project relevance materials and equipment are properly received,
handled & preserved.Prepare and notify the client of two week look ahead
inspection schedule.
 Identify the nonconformance, initiate NCR & recommend corrective and preventive
action.
 Initiate a kick-off meeting(Quality control toolbox)
 Prepare NCR log, RFI log, equipment monitoring log.
 Oil breakdown test, turn ratio test, winding resistance test, vector group test, insulation
resistance test of Power transformer, gauges caliberation
 Insulation resistance, continuity, sheath test, soak test, hipot test, potential discharge
test
 Document review during material receiving, installation, preservation and testing
inspection activity of 13.8KV Cable, 13.8KV switchgear, 13.8KV power and distribution
transformer, MCC, Battery, and UPS system 480V switchgear, low voltage panel
boards, DC panel boards, PSA, DCS, Cable bus, MCT’s, cable trays, PLTC cables,
control cables, low voltage cables, fire detection & alarm system, BMS, Combustible gas
detection system, Grounding system, Lighting & lightning system etc.
 Contact resistance test, trip test, timing test of circuit breakers.
 Check the protection schemes, interlocks and other functional tests of Switchgears
 Coordinate with other discipline mechanical, civil and telecomm.

Company industry:
Project & Construction Planning
Job role:
Oil and Gas

ELECTRICAL & Instrumentation QA/QC INSPECTOR

January 2018 - January 2019

TEKYAPPI

Dammam, Saudi Arabia

January 2018 - January 2019

Ensure that the material receiving, installation, testing inspections are carried out
according to Quality Control Plans/Inspection Test Plans, contract scope of work
, technical specification
 Verify the compliance of the equipment with applicable standards and specifications
prior to release to be used as part of the work.
 Ensure that project relevance materials and equipment are properly received,
handled & preserved.Prepare and notify the client of two week look ahead
inspection schedule.
 Identify the nonconformance, initiate NCR & recommend corrective and preventive
action.
 Initiate a kick-off meeting(Quality control toolbox)
 Prepare NCR log, RFI log, equipment monitoring log.
 Oil breakdown test, turn ratio test, winding resistance test, vector group test, insulation
resistance test of Power transformer, gauges caliberation
 Insulation resistance, continuity, sheath test, soak test, hipot test, potential discharge
test
 Document review during material receiving, installation, preservation and testing
inspection activity of 13.8KV Cable, 13.8KV switchgear, 13.8KV power and distribution
transformer, MCC, Battery, and UPS system 480V switchgear, low voltage panel
boards, DC panel boards, PSA, DCS, Cable bus, MCT’s, cable trays, PLTC cables,
control cables, low voltage cables, fire detection & alarm system, BMS, Combustible gas
detection system, Grounding system, Lighting & lightning system etc.
 Contact resistance test, trip test, timing test of circuit breakers.
 Check the protection schemes, interlocks and other functional tests of Switchgears
 Coordinate with other discipline mechanical, civil and telecomm.

Company industry:
Project & Construction Planning
Job role:
Construction and Building

Project Manager

April 2016 - December 2017

ABAJA

Dammam, Saudi Arabia

April 2016 - December 2017

Low voltage, medium voltage, high voltage & control cable pulling, Cable laying, trench
excavation, sand bedding, backfilling & compaction.
Pole erection, alignment, Dressing, clipping, Stringing, Sagging, Framing, Jumpering,
cable termination, transformer installation.
Bonding box, Anode & cathode junction box, transformer rectifier Test station & Post
marker installation .Perform holiday test
 .Termination of cables in RMU, switchgear, MCC.
 (Continuity test, Phase sequence test, IR test, sheath test,
Hipot test of MV cable).
 MV cable splicing, OPGW splicing & termination in junction box.
 Optical fibre splicing and termination.Check end to end continuity and attenuation
 Materials take off from IFC. Schedule daily activities
 Follow up with safety about work permits, JSA, safety orientation, risk register, toolbox
talk and construction team .
 Coordination with main contractor as well as Saudi Aramco PID, LPD and PMT.
COMPANY NAME: Global Track Automation Est.

Company industry:
Project & Construction Planning
Job role:
Oil and Gas

Electrical Engineer

April 2015 - April 2016

Circle Training Centre

Mingora, Pakistan

April 2015 - April 2016

Transmission lines, distribution feeders and 132KV substation operation & maintenance, Construction

Company industry:
Electric Power Production & Transmission
Job role:
Training and Development

Education

University Of Engineering And Technology,peshawar

May 2015

May 2015

Bachelor's degree, ELECTRICAL ENGINEERING

Pakistan

ELECTRICAL ENGINEERING

Skills

Microsoft Office

Expert

PLAINSWIFT

Expert

Outlook

Expert

Languages

English

Expert

Arabic

Intermediate

Training and Certifications

Certifications
ISO management System Audit techniques and Best practices.
Alison
Principles of Occupational Health and Safety Management System ISO 45001;2018
Alison
Environmental Management System(EMS) ISO 14001:2015
Alison
Quality Management system Lead Auditor ISO 9001:2015 from
Avanta Global Pte Ltd

Training
Log Out tag Out Awareness.
Alison