General Manager Tabuk Water District, LWUA-Local Water Utilities Administration
Tabuk Water District
Total years of experience :45 years, 11 Months
• General Manager Tabuk Water District, LWUA-Local Water Utilities Administration
Tabuk City, Kalinga, Philippines 1984-1996
Implementation of vision and mission of Tabuk Water District in the delivery of service in the field of potable water to constituents.
• Design Manager/Principal Structural Engineer, Fast Planets Engineering Design Consultants, Riyadh, Kingdom of Saudi Arabia 2008-2013
Management of Design Teams from pre design activities towards to Submission of Final Detailed Engineering Design (FDED) -Structural Investigations of existing buildings and towers in the field of telecom structural engineering. Includes roads and retaining walls at greenfield sites.
• Supervising/Lead Civil Engineer, Provincial Engineering Department, Tabuk City, Kalinga, Philippines, 1980-1987
Engineering Procurement Construction Management (EPCM) of building construction including residential, commercial, industrial and institutional buildings such as schools, universities, gyms, sport complexes, warehouses, hospitals, infrastructures such as potable waterworks & foul waterworks, irrigation and drainage systems, roads, highways and bridges etc.
• Sr. Structural Engineer, ASCO Qatar Consulting Engineers, Doha, State of Qatar, 2008
Reviews of Structural Analysis and Design, ACAD details and drawings, BOQs & Specifications of various structures such as commercial buildings, potable water facilities such as reservoirs and pumping stations and foul water facilities such as precast pipes and manholes, and retaining walls.
• Material Testing and Quality Control Engineer, National Irrigation Administration
Chico Diversion Dam, Calanan, Tabuk City, Kalinga, Philippines 1978-1980
Implementation of Quality Control as per ACI and ASTM Specs in the construction of RC Dam nd other facilities such as administration buildings, personnel quarters, equipment pools, car parks, field offices, roads & bridges, and irrigation facilities. Includes material testing activities on aggregates & concrete production, concrete placement, concrete repairs and curing works.