Total Years of Experience: 35 Years, 11 Months
June 2018
To Present
Independent Consulting Engineer
at Norconsult Management Services Philippines, Inc
(ICE) for the
construction of Cebu-Cordova Link Expressway (CCLEX)
construction of Cebu-Cordova Link Expressway (CCLEX)
December 2007
To June 2018
Senior Geologist
at COWI A/S
Location :
Oman
COWI A/S is a leading Consulting Group that has records
of world-class competencies within engineering,
economics and environmental science.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
of world-class competencies within engineering,
economics and environmental science.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
January 2014
To March 2015
at Hotel & Tourism Co., LLC
review of the GIR, excavation face mapping and
Qatar Rails recommends rock anchor supports.
Qatar : Inner Doha Regeneration Implementation Strategy
Feb to Mar 2014 : (IDRIS)
Ashghal : Interpretation of geotechnical factual reports and
prepares the scope of works for the additional
investigation.
Qatar : Roads and Infrastructure in Al Kheesa North & East,
Feb to Mar 2014 Package 1
Ashghal : Geotechnical investigation inspection, shafts excavation
mapping and micro-tunneling inspection.
Ajman-UAE : Construction of Marine Works at Fairmont Hotel
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 7 of 13
Apr to Aug 2013 : Supervision of armour rocks installation and rock tests
Qatar Rails recommends rock anchor supports.
Qatar : Inner Doha Regeneration Implementation Strategy
Feb to Mar 2014 : (IDRIS)
Ashghal : Interpretation of geotechnical factual reports and
prepares the scope of works for the additional
investigation.
Qatar : Roads and Infrastructure in Al Kheesa North & East,
Feb to Mar 2014 Package 1
Ashghal : Geotechnical investigation inspection, shafts excavation
mapping and micro-tunneling inspection.
Ajman-UAE : Construction of Marine Works at Fairmont Hotel
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 7 of 13
Apr to Aug 2013 : Supervision of armour rocks installation and rock tests
January 2013
To March 2013
at New Orbital Highway Projec
Location :
Qatar
Review of factual reports and preparation of interpretative
Ashghal report.
Dubai, UAE : Jumana Island Reclamation Project
Sep to Dec 2012 : Supervision of offshore geotechnical investigation, review
Meeras Development LLC : of factual report and preparation of interpretative report.
Dubai, UAE : Pearl Jumeira Island Reclamation Project
Jun to Aug 2012 : Supervision of armour rocks installation, sand filling,
Meeras Development LLC : vibro-compaction, boreholes & CPT tests
Ajman, UAE : Al Zorah Development, -
May 2012 : Supervision of onshore and near shore soil investigation
Al Zorah Development : drilling for the intake riser, the pumping station, the
pumping main and the outfall station
Qatar : Qurrayah IPP Project, KSA
Mar to Apr 2012 : Process the geotechnical parameters from the factual
Huta Marine Works Ltd reports for the preparation of geotechnical interpretative
report (GIR).
Ashghal report.
Dubai, UAE : Jumana Island Reclamation Project
Sep to Dec 2012 : Supervision of offshore geotechnical investigation, review
Meeras Development LLC : of factual report and preparation of interpretative report.
Dubai, UAE : Pearl Jumeira Island Reclamation Project
Jun to Aug 2012 : Supervision of armour rocks installation, sand filling,
Meeras Development LLC : vibro-compaction, boreholes & CPT tests
Ajman, UAE : Al Zorah Development, -
May 2012 : Supervision of onshore and near shore soil investigation
Al Zorah Development : drilling for the intake riser, the pumping station, the
pumping main and the outfall station
Qatar : Qurrayah IPP Project, KSA
Mar to Apr 2012 : Process the geotechnical parameters from the factual
Huta Marine Works Ltd reports for the preparation of geotechnical interpretative
report (GIR).
June 2011
To February 2012
Geotechnical database reports collection & review, site
Ashghal : supervision of geotechnical investigation, review of
geotechnical factual report and interpretative report
preparation.
Qatar : North Doha Sewerage Project - Inspection/mapping of
Ashghal : supervision of geotechnical investigation, review of
geotechnical factual report and interpretative report
preparation.
Qatar : North Doha Sewerage Project - Inspection/mapping of
September 2010
To May 2011
shafts excavation, groundwater monitoring, pipe jacking
Ashghal : monitoring, trenches excavation mapping & monitoring of
HDD thrust boring.
Qatar : New Doha Port Project
Ashghal : monitoring, trenches excavation mapping & monitoring of
HDD thrust boring.
Qatar : New Doha Port Project
October 2009
To August 2010
Supervision of site geo-environmental investigation and
NDPP : associated soil/water sampling and pumping tests
Qatar : Ras Laffan West Side Road Expansion Project, Phase 2
Sep 2009 : Carryout site inspection, logging of trial pits, review the
QP-RLIC : factual geotechnical reports and preparation of
geotechnical assessment report.
Qatar : Qatar-Bahrain Causeway Project
Aug 2009 : Preparation of geotechnical interpretative report. Assists
QBC the processing of AGS formatted borehole logs and
laboratory test results.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 8 of 13
Qatar : Barwa Financial District Bored Piling
NDPP : associated soil/water sampling and pumping tests
Qatar : Ras Laffan West Side Road Expansion Project, Phase 2
Sep 2009 : Carryout site inspection, logging of trial pits, review the
QP-RLIC : factual geotechnical reports and preparation of
geotechnical assessment report.
Qatar : Qatar-Bahrain Causeway Project
Aug 2009 : Preparation of geotechnical interpretative report. Assists
QBC the processing of AGS formatted borehole logs and
laboratory test results.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 8 of 13
Qatar : Barwa Financial District Bored Piling
August 2008
To June 2009
at Oman Muscat International Airpor
Inspection of bored piling, steel cages installation,
Barwa Financial District : concrete casting and associated slump tests. Witness the
pile strength tests (low strain static, high strain dynamic,
PIT & caliper). Monitor the supplementary geotechnical
investigation boreholes. Process the submitted concrete
test results (cube strength-7/14/24 days, RCP, RCM, etc.)
and preparation of close-out documents.
Qatar Transport Corridors Crossing the Bay of Doha, Concept
May to Jul 2008 Design
Ashghal Data collection of existing geotechnical investigation
reports from the other Consultants and geotechnical
contracting companies in Qatar. Supervision of offshore
geotechnical investigation along the alignment of the
proposed offshore corridor.
Barwa Financial District : concrete casting and associated slump tests. Witness the
pile strength tests (low strain static, high strain dynamic,
PIT & caliper). Monitor the supplementary geotechnical
investigation boreholes. Process the submitted concrete
test results (cube strength-7/14/24 days, RCP, RCM, etc.)
and preparation of close-out documents.
Qatar Transport Corridors Crossing the Bay of Doha, Concept
May to Jul 2008 Design
Ashghal Data collection of existing geotechnical investigation
reports from the other Consultants and geotechnical
contracting companies in Qatar. Supervision of offshore
geotechnical investigation along the alignment of the
proposed offshore corridor.
April 2002
To December 2007
SAUDI ARABIA
at OF PROFESSIONAL KEY STAFF
Prepare the scope of works, the specifications, and the
bill of quantities (BOQs) of the required geotechnical
investigation for the Project Tenders.
QCE geologist for 3.5 m diameter sewerage tunneling
project (shaft excavation mapping and inspection of wall
supports);
PMC supervision geologist for Bahrain LNG offshore
Import Terminal Project (geotechnical investigation &
piling works);
Inspection geologist for the construction of Red Line
North Metro Rails Project (face mapping of deep
excavation as per Hoek & Brown parameters);
Inspection geologist for the sewerage micro-tunnelling
project (shafts and trenches mapping);
PMC site supervision for the dredging works and island
reclamation projects (vibro-compaction, pre/post
compaction CPTu, sediments sampling, etc.);
Supervision of onshore & offshore geotechnical/geo-
environmental site investigation (drilling, SPT, trial pits,
soil/water sampling & in-situ tests);
Supervision of geophysical surveys (MASW, ERT,
downhole P-S, ATV, caliper & gamma ray)
Supervision of bored piling activities & associated pile
tests (caliper, sonic, PIT, high strain dynamic, low strain
static and O-cell).
bill of quantities (BOQs) of the required geotechnical
investigation for the Project Tenders.
QCE geologist for 3.5 m diameter sewerage tunneling
project (shaft excavation mapping and inspection of wall
supports);
PMC supervision geologist for Bahrain LNG offshore
Import Terminal Project (geotechnical investigation &
piling works);
Inspection geologist for the construction of Red Line
North Metro Rails Project (face mapping of deep
excavation as per Hoek & Brown parameters);
Inspection geologist for the sewerage micro-tunnelling
project (shafts and trenches mapping);
PMC site supervision for the dredging works and island
reclamation projects (vibro-compaction, pre/post
compaction CPTu, sediments sampling, etc.);
Supervision of onshore & offshore geotechnical/geo-
environmental site investigation (drilling, SPT, trial pits,
soil/water sampling & in-situ tests);
Supervision of geophysical surveys (MASW, ERT,
downhole P-S, ATV, caliper & gamma ray)
Supervision of bored piling activities & associated pile
tests (caliper, sonic, PIT, high strain dynamic, low strain
static and O-cell).
August 2005
To March 2006
investigation
at Saudi Aramco
Location :
United Arab Emirates
: Supervision of drilling investigation of +800 nos.
boreholes (15-60m); +100 nos. CPTs; +100 nos. trial pits,
and +20 nos. cross-holes. Apply the daily hot work
permits for drilling and attend meeting with the Client's
representative. Carry out logging of soil/rock samples.
Prepare and submit daily reports.
KSA : Saudi Electricity Company Tower Foundation Load Tests
boreholes (15-60m); +100 nos. CPTs; +100 nos. trial pits,
and +20 nos. cross-holes. Apply the daily hot work
permits for drilling and attend meeting with the Client's
representative. Carry out logging of soil/rock samples.
Prepare and submit daily reports.
KSA : Saudi Electricity Company Tower Foundation Load Tests
October 1990
To December 2000
Supervising Geologist
at National Power Corporation
Location :
Philippines
Supervising Geologist, interface with the Foreign
Consultants (Halcrow, Norconsult, Lahmeyer, etc) in site
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 5 of 13
investigation for the Feasibility and Definite Design of
several hydropower projects.
Client's geologist, interface with the Japanese
Consultants in the geotechnical/geophysical study of 132
kV sea-crossing island-to-island power cable
interconnection projects.
Supervision of geotechnical investigations for the
proposed power stations, sub-stations, cable terminal
stations and power barges mooring facilities projects.
Consultants (Halcrow, Norconsult, Lahmeyer, etc) in site
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 5 of 13
investigation for the Feasibility and Definite Design of
several hydropower projects.
Client's geologist, interface with the Japanese
Consultants in the geotechnical/geophysical study of 132
kV sea-crossing island-to-island power cable
interconnection projects.
Supervision of geotechnical investigations for the
proposed power stations, sub-stations, cable terminal
stations and power barges mooring facilities projects.
January 1997
To January 1999
Geologist
.
NAPOCOR : Plan and supervise the geotechnical soil investigation of
+175 nos. tower sites, 02-nos substations and 02-nos
cable terminal stations. Carry out the electrical resistivity
surveys; select the soil samples for laboratory tests and
prepare the geotechnical factual report. Liaise with
Contractors during construction stage. Geophysical team
member, with Japanese Consultants (Aero Asahi) in the
conduct of marine geophysical surveys (side scan sonar,
echo-sounder & sea bottom profiling) for the evaluation
condition of seabed materials related to under-water
power cable laying. Monitor and supervises the seabed
trenching works and power cable laying of approximately
23 kms distance from Leyte Cable Terminal Station
towards Bohol Cable Terminal Station.
Negros Island : Hilabangan Hydro-power Projects Feasibility Study
NAPOCOR : Plan and supervise the geotechnical soil investigation of
+175 nos. tower sites, 02-nos substations and 02-nos
cable terminal stations. Carry out the electrical resistivity
surveys; select the soil samples for laboratory tests and
prepare the geotechnical factual report. Liaise with
Contractors during construction stage. Geophysical team
member, with Japanese Consultants (Aero Asahi) in the
conduct of marine geophysical surveys (side scan sonar,
echo-sounder & sea bottom profiling) for the evaluation
condition of seabed materials related to under-water
power cable laying. Monitor and supervises the seabed
trenching works and power cable laying of approximately
23 kms distance from Leyte Cable Terminal Station
towards Bohol Cable Terminal Station.
Negros Island : Hilabangan Hydro-power Projects Feasibility Study
January 1997
To January 1998
Geologist
. Plan and supervise the
NAPOCOR : geotechnical investigation of + 700 nos. tower sites,
including electrical resistivity surveys. Select the soil
samples for laboratory tests and prepare the geotechnical
factual report. Liaise with the Contractors during the
construction stage.
Leyte & Bohol : 138-KV HVAC Leyte-Bohol T/L Interconnection Project
NAPOCOR : geotechnical investigation of + 700 nos. tower sites,
including electrical resistivity surveys. Select the soil
samples for laboratory tests and prepare the geotechnical
factual report. Liaise with the Contractors during the
construction stage.
Leyte & Bohol : 138-KV HVAC Leyte-Bohol T/L Interconnection Project
January 1990
To January 1997
Mine Geologist
. Carry out detailed mineral and structural
Benguet Corporation : geologic mapping. Directs the mining operations towards
the mineable ore bodies and monitor grade control.
Supervise the underground drilling exploration programs
and perform detailed rock core logging. Update ore
reserves based on underground and surface exploration
data.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
Benguet Corporation : geologic mapping. Directs the mining operations towards
the mineable ore bodies and monitor grade control.
Supervise the underground drilling exploration programs
and perform detailed rock core logging. Update ore
reserves based on underground and surface exploration
data.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
January 1994
To January 1995
Senior Geologist
. Plan and supervise the geotechnical
NAPOCOR : investigation drilling of +100 nos. boreholes (30m to
100m depth). Conduct the electrical resistivity and
shallow seismic refraction surveys. Carry out soil and
rock core logging, and prepare the factual geotechnical
investigation report.
Negros Oriental : Palimpinon 80-MW Modular Geothermal Power Plant
1994 : Project
NAPOCOR : Senior Geologist. Monitor, inspect and carry out detailed
geological mapping on excavations for the foundations of
powerhouse and steam demister. Monitor the slope
stability surrounding the project site.
Panay Island : Timbaban and Villasiga Hydroelectric Projects, Feasibility
NAPOCOR : investigation drilling of +100 nos. boreholes (30m to
100m depth). Conduct the electrical resistivity and
shallow seismic refraction surveys. Carry out soil and
rock core logging, and prepare the factual geotechnical
investigation report.
Negros Oriental : Palimpinon 80-MW Modular Geothermal Power Plant
1994 : Project
NAPOCOR : Senior Geologist. Monitor, inspect and carry out detailed
geological mapping on excavations for the foundations of
powerhouse and steam demister. Monitor the slope
stability surrounding the project site.
Panay Island : Timbaban and Villasiga Hydroelectric Projects, Feasibility
January 1992
To January 1993
Senior
Geologist. Working team with the Consultants,
NorConsult Pty. Ltd., in the Feasibility Study of Timbaban
and Villasiga rivers for hydro-power projects. Carry out
geologic mapping at weir site, surge chamber, penstock
and the potential sources of clay borrow. Supervises
drilling activities, perform rock core logging and evaluates
the water pressure test results.
Negros Occidental : Bago River Hydroelectric Project, Definite Design
NorConsult Pty. Ltd., in the Feasibility Study of Timbaban
and Villasiga rivers for hydro-power projects. Carry out
geologic mapping at weir site, surge chamber, penstock
and the potential sources of clay borrow. Supervises
drilling activities, perform rock core logging and evaluates
the water pressure test results.
Negros Occidental : Bago River Hydroelectric Project, Definite Design
January 1990
To January 1991
Senior Geologist
with the
NAPOCOR : Consultants, Sir William Halcrow & FUJI Engineering, in
the Definite Design Study of Bago River HEP. Carry out
geologic mapping at weir site, surge chamber, penstock
and the potential sources of clay borrow.
Inspects/monitors drilling activities and perform rock core
logging and evaluates the results of water pressure tests.
Acupan Mines, Baguio : Baguio Gold Operations, Underground Mining
NAPOCOR : Consultants, Sir William Halcrow & FUJI Engineering, in
the Definite Design Study of Bago River HEP. Carry out
geologic mapping at weir site, surge chamber, penstock
and the potential sources of clay borrow.
Inspects/monitors drilling activities and perform rock core
logging and evaluates the results of water pressure tests.
Acupan Mines, Baguio : Baguio Gold Operations, Underground Mining
January 1987
To January 1990
Mine Geologist
at Benguet Corporation
Underground mapping and updating mine's ore reserve.
Planning and supervision of the underground drilling
exploration.
Selected Projects:
Qatar : HO CHI MINH (Vietnam) Metro Rails Project
Feb to Mar 2018 : Tender/Proposal. Prepares the geotechnical plan, and bill
of quantities (BOQ) for field geotechnical investigation,
and the associated laboratory tests.
Qatar : Lusail Carparks Ground Settlement Study
Aug to Dec 2017 : Geotechnical investigation supervision and preparation of
QDVC the grouting plans.
Qatar : IDRIS-MTS1 Tunneling Project
Sep to Oct 2017 : QCE inspection team for the shafts excavation and
Ashghal : tunneling.
Qatar : Green Line Extension Project Proposal
Aug. 2017 : Preparation of geotechnical plan and bill of quantities
(BOQ) for field geotechnical investigation and laboratory
tests.
Qatar : Flood Prevention Scheme Study
Apr to Jul 2017 : Carry out in-situ soakaway tests on various flood-
Ashghal/Petroserv prone areas in Doha.
Jeddah, KSA : Special Forces Medical Centre Piling Project
Apr 2017 : Inspection of test piles boring, installation of strain gages
ABB Rock and witness the 8-nos. x 17000 KN low strain static load
tests.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 6 of 13
Jebel Ali, UAE : Jebel Ali Deep Stormwater Tunnel Project
Jan 2017 : Preparation of Surfer and gINT software generated
COWI-UAE borehole plan & profiles for the Geotechnical
Interpretation Report (GIR).
Qatar : Design and Construction of Al Bustan Street North (P007
Nov. 2016 C7 P2.
Ashghal : Preparation of Surfer and gINT software generated
borehole plan & profiles for the Geotechnical
Interpretation Report (GIR).
Qatar : CP07-B LRT Station and Troughs -
Aug to Oct 2016 : Excavation face mapping
QD-SBG
Bahrain : Bahrain LNG Import Terminal Project
Apr to Jul 2016 : Supervision of offshore geotechnical investigation for the
Noga Holding marine structures such as Trestle, Jetty, breakwater, gas
pipeline and onshore receiving facilities.
Qatar : Design of Roads and Infrastructure of Wakrah Logistic
Feb to Mar 2016 Park B.
Ashghal : Site geotechnical investigation supervision and GIR
preparation
Qatar : Design of Roads and Infrastructure of Wakrah Logistic
Aug to Oct 2015 Park A
Ashghal : Site geotechnical investigation supervision and GIR
: preparation.
Qatar : Truck X-ray Facility at Saudi Border in Abu Samra
May to Aug 2015 : Bored piling inspection and pile tests (static, dynamic,
Ministry of Interior sonic & PIT)
Qatar : Metro Rails, Red Line North Underground (RLNU)
Planning and supervision of the underground drilling
exploration.
Selected Projects:
Qatar : HO CHI MINH (Vietnam) Metro Rails Project
Feb to Mar 2018 : Tender/Proposal. Prepares the geotechnical plan, and bill
of quantities (BOQ) for field geotechnical investigation,
and the associated laboratory tests.
Qatar : Lusail Carparks Ground Settlement Study
Aug to Dec 2017 : Geotechnical investigation supervision and preparation of
QDVC the grouting plans.
Qatar : IDRIS-MTS1 Tunneling Project
Sep to Oct 2017 : QCE inspection team for the shafts excavation and
Ashghal : tunneling.
Qatar : Green Line Extension Project Proposal
Aug. 2017 : Preparation of geotechnical plan and bill of quantities
(BOQ) for field geotechnical investigation and laboratory
tests.
Qatar : Flood Prevention Scheme Study
Apr to Jul 2017 : Carry out in-situ soakaway tests on various flood-
Ashghal/Petroserv prone areas in Doha.
Jeddah, KSA : Special Forces Medical Centre Piling Project
Apr 2017 : Inspection of test piles boring, installation of strain gages
ABB Rock and witness the 8-nos. x 17000 KN low strain static load
tests.
Technical Proposal: Independent Consultancy Services for SECTION 5
Cebu Cordova Link Expressway Project CURRICULUM VITAE (CV)
OF PROFESSIONAL KEY STAFF
Fernando V. Sañor Jr Page 6 of 13
Jebel Ali, UAE : Jebel Ali Deep Stormwater Tunnel Project
Jan 2017 : Preparation of Surfer and gINT software generated
COWI-UAE borehole plan & profiles for the Geotechnical
Interpretation Report (GIR).
Qatar : Design and Construction of Al Bustan Street North (P007
Nov. 2016 C7 P2.
Ashghal : Preparation of Surfer and gINT software generated
borehole plan & profiles for the Geotechnical
Interpretation Report (GIR).
Qatar : CP07-B LRT Station and Troughs -
Aug to Oct 2016 : Excavation face mapping
QD-SBG
Bahrain : Bahrain LNG Import Terminal Project
Apr to Jul 2016 : Supervision of offshore geotechnical investigation for the
Noga Holding marine structures such as Trestle, Jetty, breakwater, gas
pipeline and onshore receiving facilities.
Qatar : Design of Roads and Infrastructure of Wakrah Logistic
Feb to Mar 2016 Park B.
Ashghal : Site geotechnical investigation supervision and GIR
preparation
Qatar : Design of Roads and Infrastructure of Wakrah Logistic
Aug to Oct 2015 Park A
Ashghal : Site geotechnical investigation supervision and GIR
: preparation.
Qatar : Truck X-ray Facility at Saudi Border in Abu Samra
May to Aug 2015 : Bored piling inspection and pile tests (static, dynamic,
Ministry of Interior sonic & PIT)
Qatar : Metro Rails, Red Line North Underground (RLNU)
Share on Facebook
Share on Twitter
Share Via Email