فيصل حسن فضل المولي محمد علي فيصل, Project Planning department manager

فيصل حسن فضل المولي محمد علي فيصل

Project Planning department manager

Sudanese Thermal Electricity power generation

البلد
مصر - القاهرة
التعليم
بكالوريوس, MECHANICAL ENGINEERING
الخبرات
29 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :29 years, 10 أشهر

Project Planning department manager في Sudanese Thermal Electricity power generation
  • السودان - الخرطوم
  • أشغل هذه الوظيفة منذ نوفمبر 2016

Preparation for projects feasibility study, tender documents, bidding process, evaluation, contracting.

project planning management في Sudanese Thermal Power Genrating
  • السودان - الخرطوم
  • أشغل هذه الوظيفة منذ نوفمبر 2016

Preparation electricity power plant projects, feasibility study, tender documents, bidding process, evaluation, and contracting.
with my team implemented: Albagair 320 mw PPOC tendering process
Alfula 450 mw PPCC tendering Process
Merowe Hydro 1250 mw project execution
..

Commercial affair department manager في Merowe Dam Electricity company
  • السودان - الخرطوم
  • أبريل 2010 إلى نوفمبر 2016

Responsible for Preparation and follow up the implementation of the Power purchase agreements and protocols to sell electricity.
Technical Assistant at H.Q. office for all purchases of spare parts and equipments for the company.

Chief Mechanical Engineer في Dam implementation unit
  • السودان
  • يوليو 2005 إلى أبريل 2010

Responsibility: Design, Manufacturing, Factory acceptance Tests, transportation and daily fabrication and construction activity of the site; coordinating with the project manager, construction manager, consultants, subcontractors and all concerned functional department etc. using all approved drawings, method statement and materials for the safe, efficient and compliant execution of the project, ensure all contractual and specification requirements are fulfilled. In execution of:
1/ No. 10 units of steel ling pipes of 8.5 meter diameter, 37 m length, 14 to 32 mm steel thickness, including the welding seems and welding NDT testing, (UT, Die penetrate, magnetic field, X-ray),
2/ 450/ 250/180/10/5 Tons 2 Overhead Travelling Cranes, gantry Carnes, auxiliary cranes and Handling equipments
3/ No. 28 Gates and automated hydraulic systems 1000 ~ 3000 KN capacity.

Chief mechanical engineer في National Electricity Corporation
  • السودان - الخرطوم
  • أغسطس 1994 إلى يوليو 2005

Responsibility: NEC, Sudan is the Government sector responsible for all electrical energy in Sudan, generation, transmission, and distribution, Manages the generation Station (steam turbine power plant, gas turbine power plant, combined Cycle power plant, Water turbine power plant and a number of diesel plants / transmission station and lines, distribution stations, and Thermal Power Plants projects under constructions)
After my Graduate I employed to NEC and Move up from junior mechanical eng. To senior, chief eng. and to department manager, during that period I acquired an experience in the followings
- I'm excellent and familiar about the Detail of steam turbine plant, because I was trained by Accumulated experience engineers and I Lead the team of operation and maintenance in a manual operational steam turbine station (manufactured in 1925) for 2 years, and then in automated 2x60 +2x30 mw steam plant stations. For another 2 years.
- I'm excellent and familiar about the Detail of Various Gas turbine I Lead the team of operation and maintenance in 15, 2x20 6x30 for 2 years.
- I'm excellent and familiar about the Detail of Combined Cycle, as project site engineer and then operation and maintenance eng. In 6x35 gas turbine and 3x35 steam turbine power plant for 3 years.
- I'm excellent and familiar about the Detail of Various water turbines, I lead the team of operation in 40x7 mw Kaplan turbine station for 5 years.

الخلفية التعليمية

بكالوريوس, MECHANICAL ENGINEERING
  • في FACULTY OF MECHANICAL ENGINEERING – UNIVERSITY OF KHARTOUM – SUDAN 1994
  • فبراير 1994

Internal and External Crosses in Sudan, ABB Germany, Alstom France, China, Egypt , .. (Cert. attached

Specialties & Skills

Project QS
MS Project
Power Plants
Mechanical Testing
V. Good in Windows, office Programs, Auto cad, Arch cat, Ms Project, Primavera, C++,
Very good knowledge of , Drawing , specification,Construction program
Very good knowledge of Method Statements
Very good command of related international codes and standards
Resolve any technical related issues as instructed and directed by project

حسابات مواقع التواصل الاجتماعي

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

Member of Sudanese engineering society
  • Specialist
  • February 1994

التدريب و الشهادات

Project feasibility study and tendering (تدريب)
معهد التدريب:
Cairo begets electricity company – Egypt
تاريخ الدورة:
January 2011
ALASBA P320 SYSTEM (تدريب)
معهد التدريب:
Alstom FRANCE
تاريخ الدورة:
January 2008
power plants Maintenance planning, Electrical protection, and gas turbines operation and maintenanc (تدريب)
معهد التدريب:
NEC Trainning center
تاريخ الدورة:
January 1997
STEEL STRUCTURE (تدريب)
معهد التدريب:
CCMD CHINA
تاريخ الدورة:
October 2005
Basics of power Plant Control System structure and components Procontrol P Configuration, programmin (تدريب)
معهد التدريب:
ABB Germany
تاريخ الدورة:
January 2003

الهوايات

  • Discovery, learning and technical creativity