Firoze Kuthabdeen, Project Engineer Electrical

Firoze Kuthabdeen

Project Engineer Electrical

Dome Advanced Electromechanical

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Electrical
Expérience
15 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :15 years, 10 Mois

Project Engineer Electrical à Dome Advanced Electromechanical
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis mars 2019

Project Engineering, procurement, design, coordination, manpower allocation, drawing preparation, material submital, RFIs, CVIs.

Electrical Engineer (Design) à Nortec Engineering consultant
  • Émirats Arabes Unis - Dubaï
  • mai 2018 à janvier 2019

All Electrical calculations and design job, prepare drawings, data sheets, using softwares for calculations

Electrical Engineer à Trans gulf international Electromechanical
  • Émirats Arabes Unis - Dubaï
  • octobre 2015 à janvier 2018

• Phase 2 project is mixed use development buildings with residential, Hotels, Mosque, Supermarkets, Office and Retails shops in the ground floor.
• Total connected load of around 13MW, with all buildings sharing common basements of six levels with parking and service corridors.
• Phase 2 project Consists of 11 buildings with 10 sub stations and 18 LV panels, 5 Generators with ratings 2250KVA, 1250KVA, 1000KVA, 18 Nos of Transformers with ratings 2000KVA, 1500KVA, 1000KVA, feeding from 11kV HV panels
• All LV panels’ incomers are Bus Bar feeders from transformers with appropriate ratings.
• Each buildings have dedicated Transformers, CBS, UPS, FAS, BMS, FPS, shared Generators and other MEP interfacing systems for life safety, Energy Management and sustainability.
• Responsibilities involves mainly in project engineering and Testing Commissioning activities
• Preparation of daily work activities sheet with risk assessment for HSE and issuing to all site Engineers and supervisors for man power allocation and work planning
• Preparation of manpower schedule and planned work completion dates for the management review to decide on manpower requirement or reduction.
• Follow up for the material with the procurement department and material control section Engineers.
• Preparation of site activities work progress sheet for management review
• Assisting the planning Engineers for weekly updating of the work in the KPI.
• Regular site walks and meetings with Senior project manager, Engineers, Sub contractors for the review and progress of works.
• Involvement in LOTO, PTW, and Energisation permit preparations and coordination with safety department for proper HSE regulations.
• Coordination for LV panel REF test, contact resistance test, insulation test, Hi pot test, labelling of LV panels and cables prior to temporary energisation of LV panels
• Coordination with Kahramaa contractor for the approval for LV wiring and substation approval (from kahramaa) prior to the Power ON process with comments for LV rooms, LV panels, CT meters, bus bar connections.
• Coordination with the LV panel supplier and bus bar supplier for the end connections and modifications required as per the site condition
• Coordination for the test procedures before the energisation of bus bar such as Insulation test, continuity test contact resistance test and torque test.
• Coordinates with the transformer supplier during the kahramaa inspection for the transformer installation approvals and LV wiring inspection approval for final HV panel terminations.
• Test sheet preparation and inspection with consultant for DB/SMDB live test, MCC panels functional testing, sequence of operation of all equipment with fire alarm, CO sensor, BMS system, VFD operation, and its settings.
• Have participated in the Civil defence inspection and ensure proper functioning of sequence and controls of MCC panels and damper controls etc.
• Carry out additional works at site in MCC like installation of relays, contactors for temporary energisation of panels for mechanical pump/Fan start up for partial Civil defence approvals.
• Coordination with safety department for the implementation of LOTO procedure required before the energisation of all live activities.
• Test sheet preparation and inspections with consultant for lighting control system, Generator testing, ATS operation central battery system, battery test, lux level, UPS system,
• Preparation of method statement for all Electrical systems for consultant review, comments and final approval.
• Co-ordinate schedules, report the testing and commissioning progress schedule with the Commissioning Manager.
• Communicate efficiently between the drafting team and the construction team for addition, deletion and /or modifications in the approved drawing to make as built drawings.
• Follow up with the suppliers for the proper functioning of all equipment and devices, for any

Project Engineer à Steelman Electromechanical
  • Émirats Arabes Unis - Dubaï
  • novembre 2013 à septembre 2015

Inspection of material to check whether it is in compliance with the approved material submittals /drawings/specifications.
Coordination with civil and other services representative to ensure that all other discipline requirements are being fulfilled for the on-going construction works.
Preparation of field changes request based on the encountered limitation in the approved drawing and obtaining approval of the same.
Conducting field test (IR, continuity and earth resistance) and coordinate client inspection with 3rd party required.
Coordination with purchase department for the materials required at the site as per the approved material submittal
Attending work progress meeting, technical meeting and coordination meeting with Main contractor, consultant, sub-contractors, suppliers
Review the MEP shop drawings and coordination with the drafting team to modify as per the consultant comments and giving input as per the calculations, requirements, and regulations.
Coordination with different suppliers/ specialist contractors for requirements, quotations, approvals, material submittals and ensure coordination for the timely completion of site activities until commission stage.

Testing and commissioning à Thermo.l.l.c
  • Émirats Arabes Unis - Dubaï
  • avril 2011 à juillet 2013

 Worked as testing and commissioning Engineer for LV, MV, Lighting controls systems, earthing and lightning protection
systems, Central battery systems etc.
 Preparation of method statement for consultant review, suggestions, comments and final approval.
 Preparation of Testing and commissioning report from the installations which have passed the quality inspection.
 Preparations of work notification for the consultant to witness the Testing and commissioning report at site.
 Co-ordinate schedules, report the testing and commissioning progress schedule with the Commissioning Manager.
 Communicate efficiently between the designers and the construction team for addition, deletion and /or modifications in the
approved drawing to make as built drawing.
 Verify all the installations and run performance test to meet the requirements.
 Constant follow up with the suppliers for the proper functioning of all equipment and devices, for any missing items required or
for the replacement of the faulty materials/devices.
 Attend meetings with the Commissioning Manager and Client members for progress report and completion time.
 Prepare log sheet based on the tests carried out at the site and the status of the result, maintain it by updating frequently to
know the progress and balance items required to complete the project on time.
 Provide suitable advice where necessary to ensure the building will be fully functional

MEP Cordinator à Lulu Group
  • Émirats Arabes Unis - Abu Dhabi
  • juillet 2007 à octobre 2010

 Report work details to the Chief MEP Engineer and Project Coordinator.
 Site inspection for fire alarm systems, gas protection system, chemical dosing and deluge systems and its commission.
 Site inspection for HVAC ducting and piping and A/C machine commissioning.
 Site inspection for firefighting sprinkler points, smoke and commissioning of fire pumps.
 Coordinated with MEP contractors to make coordinated MEP drawings.
 Preview drawings submitted by MEP contractors and made rough comments.
 Supervising all subcontractors and carried out inspection wherever required for clearance.

Éducation

Baccalauréat, Electrical
  • à Mar Baselios College of Engineering and TEchnology
  • avril 2006

Btech in Electrical And Electronics Engineering

Specialties & Skills

Lighting Control
Lighting
Project Management
Commissioning
Testing
AutoCAD 2D
Primavera P6
Carrier hap
E-20 sheet

Langues

Anglais
Expert
Malayala
Expert

Formation et Diplômes

JAVA (Certificat)
Date de la formation:
March 2006
Primavera P6 (Formation)
Institut de formation:
Cadd Point
Date de la formation:
February 2014
Durée:
50 heures
Electrical Design course (Formation)
Institut de formation:
Danush MEP training center
Date de la formation:
January 2013
Durée:
40 heures
HVAC design course (Formation)
Institut de formation:
Danush MEP training center
Date de la formation:
January 2013
Durée:
40 heures
Autocad 2D (Formation)
Institut de formation:
Cadd center
Date de la formation:
April 2006
Durée:
50 heures
Primevera 6 (Formation)
Institut de formation:
Cadd center
Date de la formation:
March 2014
Durée:
50 heures
Electrical designing and estimation (Formation)
Institut de formation:
Danush
Date de la formation:
January 2011
Durée:
150 heures

Loisirs

  • Music
    singing
  • Reading, music, films
    Have participated in entertainment activity for refreshment tours and industrial visit
  • Painting
  • Music
  • Travelling
  • Travelling
  • Music
  • Painting