Total Years of Experience: 7 Years, 0 Months
December 2017
To October 2018
Head Quality Assurance and Control Engineer
at Iron Products Industries Limited
Location :
Nigeria
As Outlined in my curriculum vitae
January 2016
To January 2017
Contractor
Project Construction /QA&QC Manager Same as Above
January 2013
To January 2016
Project /Quality Assurance and Control Engineer
at TLD Global Services Ltd Nigeria Operation
Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Total Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Conoil Plc Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Oando Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Forte Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at SAHARA Aviation Downstream Facility, MMA Airport, Lagos. Nigeria.
•Develops manufacturing processes by designing and modifying equipment for fabrication, building, assembling and installing components.
•Assures system and product quality by designing testing methods, testing finished product and system capabilities, confirming fabrication assembly, and installation processes.
•Develops mechanical and electromechanical products by studying customer requirements, Researching and testing manufacturing and assembly methods and materials. And lastly Soliciting observations from operators.
•Prepares product reports by collecting, analyzing and summarizing information and trends.
•Maintains product and company reputation by complying with government regulations.
• The project engineer that completed construction and testing of Atmospheric Tank vessels, piping, instrumentation, and metering equipments for sahara group ( Sahara Bulk Storage Facility Limited) Aviation PHC, Rivers State. 2014(April) -2015 ( May 2015)
•Quality Assurance and Control Engineer for the construction of three numbers of 12millions capacity Atmospheric AGO Tanks for NIPCO PLC, Apapa, Lagos.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Conoil Plc Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Oando Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at Forte Downstream Facility, Apapa, Lagos. Nigeria.
•Carrying-out routine inspections of downstream metering skids, calibrations and maintenance services at SAHARA Aviation Downstream Facility, MMA Airport, Lagos. Nigeria.
•Develops manufacturing processes by designing and modifying equipment for fabrication, building, assembling and installing components.
•Assures system and product quality by designing testing methods, testing finished product and system capabilities, confirming fabrication assembly, and installation processes.
•Develops mechanical and electromechanical products by studying customer requirements, Researching and testing manufacturing and assembly methods and materials. And lastly Soliciting observations from operators.
•Prepares product reports by collecting, analyzing and summarizing information and trends.
•Maintains product and company reputation by complying with government regulations.
• The project engineer that completed construction and testing of Atmospheric Tank vessels, piping, instrumentation, and metering equipments for sahara group ( Sahara Bulk Storage Facility Limited) Aviation PHC, Rivers State. 2014(April) -2015 ( May 2015)
•Quality Assurance and Control Engineer for the construction of three numbers of 12millions capacity Atmospheric AGO Tanks for NIPCO PLC, Apapa, Lagos.
January 2010
To January 2011
NYSC TRAINEE
at DELTA STEEL COMPANY
Steel Melting/ Continuous Casting
•Making Daily, Weekly and Monthly Production Reports using
Spread Sheet application package (Excel)
•Ensure maintenance of Standard Operating Procedure/ Fill the S.O.P. Plan Heatwise (Shiftwise).
•Inspection/ supervision of vessel/furnace maintenance.
•See to the availability of prime/coupled electrodes/alloying/refract. materials for production.
•Take Slag, Lime, Ferro-Alloy, CPC samples for Laboratory analysis.
• Fill the Heat Log Sheet, ensure accurate documentation of all process data, material consumption, delays etc, in the Heat Report Sheets
• Assisting equipment supervisor in daily worked hour of equipment documentation.
•Participating in good housekeeping and TPM activities.
•Carrying out other duties that may be assigned by Head of Department.
•Making Daily, Weekly and Monthly Production Reports using
Spread Sheet application package (Excel)
•Ensure maintenance of Standard Operating Procedure/ Fill the S.O.P. Plan Heatwise (Shiftwise).
•Inspection/ supervision of vessel/furnace maintenance.
•See to the availability of prime/coupled electrodes/alloying/refract. materials for production.
•Take Slag, Lime, Ferro-Alloy, CPC samples for Laboratory analysis.
• Fill the Heat Log Sheet, ensure accurate documentation of all process data, material consumption, delays etc, in the Heat Report Sheets
• Assisting equipment supervisor in daily worked hour of equipment documentation.
•Participating in good housekeeping and TPM activities.
•Carrying out other duties that may be assigned by Head of Department.
Project Engineer
at Doeserve International Limited
Duties are:
• Ensuring that the Materials and Tools for the project are properly inspected and effectively handled.
•Supervision of mechanical fitters in the erection of first african automated compack storage rack system.
• Ensuring that the manpower employed work effectively and efficiently by working
Effective and efficiently so as to encourage them to work.
• Ensuring that all bottle- necks are completely minimized.
• Ensuring that the job is done safely by using effective and efficient safety management Skills
• Ensuring that the Materials and Tools for the project are properly inspected and effectively handled.
•Supervision of mechanical fitters in the erection of first african automated compack storage rack system.
• Ensuring that the manpower employed work effectively and efficiently by working
Effective and efficiently so as to encourage them to work.
• Ensuring that all bottle- necks are completely minimized.
• Ensuring that the job is done safely by using effective and efficient safety management Skills
Share on Facebook
Share on Twitter
Share Via Email