Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Francisco Jr Aleja, Senior Electrical Engineer / Owner's Engineer

Francisco Jr Aleja

Senior Electrical Engineer / Owner's Engineer·Mott Macdonald Ltd.

Saudi Arabia

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 35 years, 11 months

Senior Electrical Engineer / Owner's Engineer

May 2023 - June 2025

Mott Macdonald Ltd.

Eastern Province, Saudi Arabia

May 2023 - June 2025

1. Lead the establishment of Inspection Test Plan (ITPL) for
Electrical from Material Receiving Inspection, Storage, Handling,
Calibration, Erection, and Turn-Over Package Inspection (TOP)
prior to Hand-Over to Commissioning.
2. Participate in daily Construction meeting with EPC contractor
related to plan daily activities.
3. Lead, Monitor and inspect all electrical erection works prior to
commissioning activities of the Contractor in compliance with the
contract and applicable codes and standards, quality, safety and
environmental acceptance.
4. Lead Turn Over Package (TOP) inspection and issue punch list
prior to hand-over to commissioning.
5. Lead the inspection for 380kV GIS, Generator Step up
transformers, Unit Auxiliary Transformer, Isolated Phase Bus
duct (IPB), 13.8 kV switchgear, MCC Board, emergency diesel
generator, Un-interrupted Power Supply (UPS), Battery Banks,
DC Distribution Boards, small power and lightings.
6. Witness the testing and review the related test reports done by
EPC contractor.
7. Monitor and verify Contractors work progress in the electrical
and instrumentation installation and prepare regular progress
reports.
8. Review and approve site related electrical design and
engineering matters submitted by the Contractor.
9. Review the final as built documents submitted by the
contactor.
10. Review and comments the documents Dossier prepared by the
EPC prior to the Hand-over to the Client.

Company industry:
Business Consultancy Services
Job role:
Electrical Engineering

Lead Electrical Engineer / Owner's Engineer

January 2019 - March 2023

FICHTNER GMBH & Co. KG

Dubai, United Arab Emirates

January 2019 - March 2023

Lead the inspection of all electrical erection, installation, and pre
commissioning activities of the Contractor with regards to
compliance with the contract and applicable codes and standards,
quality, safety, and environmental acceptance.
Lead the Turn Over Package (TOP) inspection and issue punch list
prior to hand-over to commissioning.
Review and approve the proposed electrical test procedures for the
equipment in the plant to be tested on Site by the Contractor.
Conduct inspection for Generator Step up transformers, Unit
Auxiliary Transformer, Isolated Phase Bus duct (IPB), 10.0kV
switchgear, MCC Board, emergency diesel generator, Un-interrupted
Power Supply (UPS), Battery Banks, DC Distribution Boards, small
power and lightings.
Witness the testing and review and approved the related test
reports. Provide comment when necessary.
Review and comment site related electrical design/engineering
matters submitted by the Contractor.
Monitor and verify Contractors work progress in the electrical
installation and prepare regular progress reports.
Participate in Site coordination meetings with the Contractor and
the Employer.
Review the final as built documents submitted by the contactor.

Company industry:
Business Consultancy Services
Job role:
Electrical Engineering

Electrical Construction Superintendent

September 2017 - December 2018

GN Power Dinginin (GNPD)

Mariveles, Philippines

September 2017 - December 2018

Job 1. Responsible for the day-to-day electrical construction execution
effort related to the power island electrical works. This includes
overseeing the constructability reviews, leading and participation
in work groups, planning interventions and problem-solving
session and implementing an integrated approach with the EPC
Contractor and Sub-contractors. This will require limited
resources that will ensure that the targets to support the overall
project goals are met. Ensure that the works are executed within
the required timeframe, not deviating from the desired quality
requirements and without harm to people and equipment.
2. Planning and monitoring of all electrical activities that includes
day to day supervision of the EPC Contractors Electrical work
progress (i.e. Verification of EPC Contractors schedule, detail
tracking the 4-week look ahead and daily activities.
Understanding of the project float and milestones).
3. Recovery related to the electrical discipline. Monitor/assist the
EPC contractor in recovering slippage. This includes the
following. Proactively conduct what if analyses to understand
possible obstacles and create contingency plans to mitigate
impact. Monitor progress according to recovery plans on an
ongoing basis.
4. Integration- ensuring smooth interfaces between plant areas.
Liaise with construction team and planning to review and
analyse project plans and look ahead schedules (two week and
one day) and identify coordination/integration requirements.
5. Compliance to design (Electrical construction) - Monitor and
ensure construction works complies with the design. Assess if
construction progress according to latest electrical design
drawings.
6. Quality - ensure the quality of electrical construction activities.
7. Safety during all electrical construction - ensure all electrical
construction activities is carried out in a safe working
environment.
8. Documentation and communication - ensuring that the required
electrical construction documentation is maintained and records
kept for future use. Record all electrical delays as well as root
causes in a standard daily progress report format.
9. General - participate and update electrical related information in
the visual environment to display build status. Incorporate
lessons learned from similar projects, to proactively prevent any
delay and rework. Implement skills transfer programs between
eternal expatriate labor and local staff within the electrical
discipline. Direct electrical team internal and external) efforts on
the projects common goal and promoted open communication
and harmonized team. Scrutinise monthly reports from EPC
Contractor for Electrical construction progress verification and
reports any discrepancies.

Company industry:
Electric Power Production & Transmission

Lead Electrical Engineer

January 2016 - January 2017

Marubeni Power System Corporation

Bheramara, Bangladesh

January 2016 - January 2017

Manage the work to be executed by Marubeni’s construction / equipment supply contractor (hereinafter called as “Subcontractor”) and coordinate with owner, overall project management party's personnel assigned in the Project and any other concerned party and its personnel in connection with the engineering / procurement / construction works to be performed by Subcontractor to assure that the engineering / procurement / construction work should be executed in compliance with conditions and requirements of the Marubeni’s contract for the Project.
2.
Monitor and report to project manager/site manager of Marubeni’s Project and/or Marubeni’s management for progress as instructed by Marubeni, quality and any aspects as deemed necessary of the engineering / procurement / construction work
3.
Consider corrective actions, countermeasures, and advice Marubeni’s project manager/site manager of the Project to take in timely manner whenever deemed necessary in view of quality and schedule of the engineering / procurement / construction work.

Company industry:
Electric Power Production & Transmission
Job role:
Electrical Engineering

Lead Electrical and Instrumentation Engineer

January 2015 - December 2015

Tractebel Engineering (GDF Suez)

Batangas, Philippines

January 2015 - December 2015

1. Review and approve (or comment) the design, the work method
statement, materials, and the commissioning documents issued
by the EPC contractor to ensure the design completeness and
consistency about the EPC Contract and specification, the Project
requirement, and the good practice;
2. Ensure the project quality plan, construction specification, for
electrical equipment and system are complete, consistent with
the design and fit with the project requirements;
3. Monitor the progress of the electrical activities and compare the
actual progress with the contractual planning to detect delays at
an early stage;
4. Participate and actively follow up electrical construction and
commissioning activities, attend site coordination meetings and
lead site E&I meetings with his peers;
5. Participate in the electrical commissioning activities, including
scheduling, commissioning meetings, witnessing, and assessing
tests
6. Keep written records of all activities under his responsibility and
provide input for the daily, weekly and monthly reports;
7. Asses the importance and value of non-conformances and
deviations from the contract and advise on the close-out;
8. Assist the Project Manager in the management of claims
between the Owner and the EPC contractor.

Company industry:
General Engineering Consultancy

Lead Electrical Engineer

June 2011 - July 2014

Marubeni Power Systems Corporation

Hat Yai, Thailand

June 2011 - July 2014

1. Manage the work to be executed by Marubenis construction /
equipment supply contractor (hereinafter called as
Subcontractor) and coordinate with owner, overall project
management partys personnel assigned in the Project and any
other concerned party and its personnel in connection with the
engineering / procurement / construction works to be performed
by Subcontractor to assure that the engineering / procurement /
construction work should be executed in compliance with
conditions and requirements of the Marubenis contract for the
Project.
2. Monitor and report to project manager/site manager of
Marubenis Project and/or Marubenis management for progress
as instructed by Marubeni, quality and any aspects as deemed
necessary of the engineering / procurement / construction work
3. Consider corrective actions, countermeasures, and advice
Marubenis project manager/site manager of the Project to take
in timely manner whenever deemed necessary in view of quality
and schedule of the engineering / procurement / construction
work.

Company industry:
Electric Power Production & Transmission

Lead Electrical Site Engineer for Power Plant

January 2010 - May 2011

Poyry Energy Ltd. (Switzerland)

Puttalam, Sri Lanka

January 2010 - May 2011

1. Monitor and inspect all electrical erection / installation /
commissioning activities of the Contractor with regards to
compliance with the contract and applicable codes/standards,
quality, safety, and environmental acceptance.
2. Review and approve the proposed electrical test procedures for
equipment in the plant to be tested on Site by the Contractor.
3. Conduct inspection for High Voltage Transformer, Generator
Transformer, Unit Auxiliary Transformer and SST, Isolated Phase
Bus duct (IPB), 6.0kV switchgear, MCC Board, emergency diesel
generator, Un-interrupted Power Supply (UPS), Battery Banks,
DC Distribution Boards, small power, lightings and low voltage
system such as fire alarming, telephone, cctv, radio
communication and all the low voltage services in the plant.
4. Witness the testing and review the test reports, comment when
necessary and approved.
5. Review and approve site related electrical design or engineering
matter submitted by the Contractor.
6. Monitor and verify Contractors work progress in the electrical
installation and prepare regular progress reports.
7. Attend the regular (daily/weekly/monthly) Site coordination
meetings with the Contractor and the Employer.
8. Review the preliminary (prior to commissioning) and final (prior
to taking over) O&M manuals submitted by the Contractor.
9. Assist the commissioning manager in executing his duties during
the commissioning phase of the project.
10. Review the final as built documents submitted by the
contactor.

Company industry:
Electric Power Production & Transmission

Sr. Electrical Site Engineer for Substations - (Electrical/Mechanical)

December 2007 - December 2009

Iberdrola Middle East

Doha, Qatar

December 2007 - December 2009

1. Electrical Engineer for the construction of 3 Substations 400kV,
220 kV and 132kV KahraMaas Substations.
2. Reviews & approves the material submittals to be installed and
used in the substations.
3. Conduct inspection for HV transformer, Gas Insulated
Switchgear (GIS 400kV, 220kV & 132kV), HV cables, MCC
Board, emergency diesel generator, Un-interrupted Power
Supply (UPS), Battery Banks, DC Distribution Boards, air
conditioning, ventilation, lightings and low voltage system such
as fire alarming, CCTV, Public address system and
telecommunication.
4. Conducts site inspection, material verification, progress report
evaluation, snag list preparation and updating.
5. Ensure that contractor complies with the contractual
requirement i.e. approved drawings and contact specifications
and maintain safety working condition at site.

Company industry:
Oil & Gas

Sr. Electrical Engineer

December 2006 - December 2007

Energoprojekt Entel

Doha, Qatar

December 2006 - December 2007

1. KahraMaas Site Consultant Sr. Electrical Engineer for the
construction of 39 Substations (220kV GIS, 132kV GIS, 66kV
GIS and 11kV switchgear).
2. Conduct inspection for High Voltage Transformer, LV Board, Un
interrupted Power Supply (UPS), Battery Banks, DC Distribution
Boards, overhead cranes, HVAC, lightings and low voltage
system such as fire alarming, telephone system.
3. Checks & approves the material submittals.
4. Conducts inspection, material verification, progress report
evaluation, snag list preparation and updating.
5. Ensure that contractor complies with the contractual
requirement i.e. approved drawings and specifications and
maintains safety working condition at site.

Company industry:
Business Consultancy Services

Sr. Electrical Engineer

July 2005 - November 2006

Parsons Brinckerhoff UK – PB Power,

Doha, Qatar

July 2005 - November 2006

1. KahraMaas Site Consultant Sr. Electrical Engineer for the
construction of Seven High Voltage GIS Substations (220kV GIS,
132kV GIS, 66kV GIS) and Refurbishment of Distribution Control
Center.
2. Conduct inspection for High Voltage Transformer, GIS, 11kV
Switchgear, LV Board, Un-interrupted Power Supply (UPS),
Battery Banks, DC Distribution Boards, overhead cranes, HVAC,
lightings and low voltage system such as fire alarming.
3. Conduct inspections, progress report evaluation, snag list
preparation and updating.
4. Ensure that contractor complies with the contractual
requirement i.e. approved drawings and specifications and
Resume
maintains safety working condition at site.

Company industry:
Electric Power Production & Transmission

MEP/Electrical Engineer

May 2004 - May 2005

Elemec Electrical Contracting L.L.C.

Dubai, United Arab Emirates

May 2004 - May 2005

Site supervision and inspection, ensuring that all MEP (Mechanical,
Electrical and Plumbing) works are carried out as per approved
drawings and specifications.
Preparation of material and equipment submittals for electrical,
mechanical and plumbing works.

Company industry:
Construction & Building

Electrical Field Engineer

January 2001 - May 2004

Hyundai Engineering. & Construction Company

Musayid, Qatar

January 2001 - May 2004

1. Assigned as Electrical Field Engineer for the construction of
Natural Gas to Liquid plant in Messaeed Industrial City with two
33/3.3/0.44kV sub-station supplying the plant.
2. Supervised installation of HV transformer, medium voltage
switchgear, distribution board, battery chargers, DC distribution
boards, UPS panels, Small Power and Lightings, Public address
system, Close Circuit Television (CCTV), Fire Alarm system,
Radio Communication system, including pre-commissioning and
commissioning with the vendor representative.

Company industry:
Construction & Building

Electrical Commissioning Engineer

July 1998 - April 1999

Techint-CimiMontubi–

Alexandria, Egypt

July 1998 - April 1999

1. Electrical Com. Engineer for the Commissioning of Medium
voltage switchgear, MV motors and balance of plant equipment
i.e. Desalination plant and Water Treatment plant

Company industry:
Electric Power Production & Transmission

Electrical Commissioning Engineer

October 1996 - March 1998

CimiMontubi/Marubeni

Jakarta, Indonesia

October 1996 - March 1998

1. Commissioning Electrical Engineer for the pre-commissioning
and commissioning of Medium Voltage switchgear (6.6kv),
motor control centre, distribution panels, dry type Distribution
transformer with vendor representative.
2. Conduct inspection for High Voltage Transformer, MCC Board,
emergency diesel generator, Un-interrupted Power Supply
Resume of Francisco - Lead Electrical Engineer
(UPS), Battery Banks, DC Distribution Boards, lightings and low
voltage system such as fire alarming, CCTV, Public address
system and telecommunication.

Company industry:
Electric Power Production & Transmission

Electrical Engineer

January 1995 - July 1996

Al-Yusr & Townsend Bottom Co.

Musayid, Qatar

January 1995 - July 1996

Involved: project 1. Project Engineer for the upgrading of existing salt plant, which
involves the replacement of power and control cables and cable
trays.
2. Coordinated with the Operation Department for the smooth
switch-over of the plant equipment and facilities such as
conveyor motors, control panels and power distribution system.
3. Worked as Electrical Maintenance Supervisor in the Main plant,
which consists of Ethylene Plant, Power Plant, Chlorine and EDC
plant, Port and Ship Loading Facilities and Tank farm, upon
completion of the project.

Company industry:
Oil & Gas

Sr. Electrical QA/QC Engineer

January 1994 - December 1994

Engineering Equipment Inc. (Flour Daniel-USA)

Batangas, Philippines

January 1994 - December 1994

1. Supervised the electrical installation of HV switchgear, motors
and cables (6.6kV), motor control centre, LV motors, power and
control cables and all the balance of plant electrical equipment
installations, ensuring that all works are carried out as per
approved drawing and specifications.
2. Responsible in maintaining and updating the inspection and test
report status, witnessing and checking the on-going testing and
commissioning activities.

Company industry:
Oil & Gas

Electrical Engineer

November 1992 - December 1993

ABV Rock Group KB Site 5 (Swedish-Norwegian Co.)–

Western Province, Saudi Arabia

November 1992 - December 1993

Electrical Supervisor for maintenance of heavy electrical equipment
used in the tunnel construction such as rigs, compressors, diesel
generators, power distribution, ventilation and cooling system in the
tunnel.

Company industry:
Oil & Gas

Electrical Engineer

July 1991 - September 1992

Blount Inc. (Thru US Army Corps of Engineers)

Al Jahra, Kuwait

July 1991 - September 1992

Projects Involved: Construction of Military Air Base Complex, Building Offices and
33/11kv Substations Electrical Supervisor for installation works related to electrical
facilities in the Military airbase complex, Hospitals and Ministry
Buildings such substation, power distribution system, UPS, DC
distribution, fire detections, telephone and air-conditioning system
(HVAC).

Company industry:
Electric Power Production & Transmission

Electrical Engineer

April 1986 - June 1991

Benedicto Steel Corporation

Pasig City, Philippines

April 1986 - June 1991

Electrical Supervisor for the construction of new steel plant. Conduct
inspection for HV transformer, MCC Board, emergency diesel
generator, Un-interrupted Power Supply (UPS), Battery Banks, DC
Distribution Boards and low voltage system of the plants including
testing and commissioning.

Company industry:
Industrial Production

Education

Central Luzon Polytechnic College (now: Nueva Ecija University of Science and Technology)

April 1986

April 1986

Bachelor's degree, Electrical Engineering

Philippines

GPA (point): 4 out of 4

GPA (point): 4 out of 4

Team Leader in class
View attachment

Nueva Ecija University Of Science And Technology

April 1986

April 1986

Bachelor's degree, Electrical Engineering

Philippines

GPA (point): 4 out of 4

GPA (point): 4 out of 4

Team Leader in class
View attachment

Skills

AUTOMATION
Intermediate
AUTOMATION
Intermediate
COMMISSIONING
Intermediate
COMMISSIONING
Intermediate
ENGINEERING ANALYSIS
Intermediate
ENGINEERING ANALYSIS
Intermediate
INDUSTRIAL AUTOMATION
Intermediate
INDUSTRIAL AUTOMATION
Intermediate
INSTALLATION
Intermediate
INSTALLATION
Intermediate
OIL AND GAS
Intermediate
OIL AND GAS
Intermediate
PROJECT MANAGEMENT
Intermediate
PROJECT MANAGEMENT
Intermediate
SAS SOFTWARE
Intermediate
SAS SOFTWARE
Intermediate
SUPERVISORY CONTROL AND DATA ACQUISITION SCADA
Intermediate
SUPERVISORY CONTROL AND DATA ACQUISITION SCADA
Intermediate
WATER TREATMENT
Intermediate
WATER TREATMENT
Intermediate

Languages

English
Intermediate

Training and Certifications

Certifications
Registered Electrical Engineer
Permit to Work System Level 2
Public address system & Alarm System

Hobbies

  • walking, swimming and all outdoor activities
    1st placed in Step Challenge by Mott McDonald International competition done in 2025