Planning Manager في Louis Berger
  • قطر - الدوحة
  • مارس 2012 إلى يونيو 2012

Supervising and managing scheduling and document control for the 8 projects comprising the Louis Berger CMCS program on Education City in Doha, Qatar.

Independent Consultant في Codest s.r.l.
  • أذربيجان
  • يونيو 2011 إلى أكتوبر 2011

Provide planning, scheduling, and report preparation services for the construction of a 278-unit five-star hotel in downtown Baku, Azerbaijan.

Project Controls Manager في AECOM
  • أذربيجان
  • أكتوبر 2009 إلى مارس 2011

Manage all aspects of cost, schedule and document control for the Crescent Development Project in Baku, Azerbaijan.

Program Controls Manager في KEO International Consultants
  • الإمارات العربية المتحدة - أبو ظبي
  • أغسطس 2006 إلى مايو 2009

2008 to 2009
Manage all aspects of cost and schedule for the $1.26 billion Dar Al Dhabi Development on Reem Island.

2007 to 2009
Supervise and manage all aspects of cost, schedule, document control, as well as oversee CAD management and IT for the $7.1 billion Mohammed bin Zayed City Commercial Towers Project (MBZ City).

2006
Supervise all aspects of project controls for QAR 831 million ($228 million) Energy City project in Qatar.

As owner’s representative, supervise all aspects of project controls for the $11 billion Al Khor Beach Development.

Senior Project Controls Engineer في HDR Design Build, Inc
  • الولايات المتحدة
  • مارس 2005 إلى يوليو 2006

As an independent contractor for HDR Design-Build, Inc., responsible for developing and maintaining the master schedule for two design-build projects: the $45 million Hershey Medical Center East, a new facility in Hershey, PA and the $20 million Desoto Medical Center, a renovation and expansion of an existing hospital in Arcadia, FL.

Facilities Manager في American University of Afghanistan
  • أفغانستان
  • أكتوبر 2005 إلى مارس 2006

As an independent contractor for the American University of Afghanistan (AUAf), responsible for overseeing ongoing renovation work at the new campus and outfitting the buildings so that the facility would be ready for classes to begin in March 2006. This included soliciting bids for the restoration of the powerhouse structure; making sure that all utilities are available and functioning; supervising the layout and uses of the rooms; overseeing the ordering and installation of furniture, computers, HVAC, lighting, floor coverings, etc. Since this was a new facility, and the timeline was relatively short there is an emphasis on obtaining locally manufactured commodities that conform to high quality guidelines. Also served on the review committee for proposals for the Master Plan for the new AUAf campus submitted by the short listed consultants.

Senior Project Controls Manager في The Louis Berger Group
  • أفغانستان
  • يونيو 2003 إلى يونيو 2005

Responsible Planning and Scheduling on the USAID funded Rehabilitation of Economic Facilities and Services (REFS) program in Afghanistan. The $665 million REFS program encompasses rebuilding highways, secondary roads, urban roads, schools, clinics, dams, irrigation, power generation, water and wastewater projects. Responsible for cost control relating to specific contracts. Responsible for the setup and administration of document control via Expedition contract control software. Involved in delay claims and impact analyses, as well as other type of cost related studies.

Cost & Schedule Manager في Burns & McDonnell
  • الولايات المتحدة
  • يوليو 2000 إلى أكتوبر 2002

Supervised all aspects of the cost and schedule for the $218 million Terminal Improvement Program (TIP) at Kansas City International Airport. Reviewed payment applications, schedule cost loading, and produced various cost reports pertaining to TIP as well as non-TIP contracts. Also oversaw the reviews of the schedules submitted by the individual contractors. In addition, also involved in claims and impact analyses, as well as other type of cost related studies.

Civil Engineer V/Senior Project Controls Engineer في Black & Veatch
  • الولايات المتحدة
  • يوليو 1995 إلى يوليو 2000

Developed and maintained a variety of schedules for design-build as well as traditional domestic and international projects. Also served as the cost engineer on several of these projects.

Civil Engineer IV في CH2M Hill
  • الولايات المتحدة
  • سبتمبر 1989 إلى يوليو 1995

As the Program Controls Manager for the CH2M Hill led Construction Management Team (CMT). He was responsible for establishing all scheduling, cost control, document control, and reporting procedures for the Metro Dade Water and Sewer Department’s $53 million North District WWTP expansion.

As Senior Project Controls Engineer for CH2M Hill-Hanford was responsible for developing and maintaining schedules for various types of remediation at the U.S. Department of Energy’s Hanford Nuclear Site. Also a member of the Systems Advisory Group that developed and implemented procedures for WBS and activity coding related to cost and time controls for this multi-million dollar clean-up effort.

In the Cost/Schedule Group of the $2.2 billion Milwaukee Water Pollution Abatement Program (MWPAP) specializing in project controls, scheduling, and time impact analysis. Specific duties included updating the master program schedule, performing time impact analyses, and analyzing all contract modification initiation requests for possible impacts on the construction schedule. Also, utilized Primavera Project Planner (P3) to construct a master closeout schedule for the entire MWPAP. This involved electronic transfer of data from several information sources.

Analyzed the construction contractors’ original overall schedules for conformance with the contract requirements and also reviewed each schedule update and conducted progress review meetings. He also analyzed the contractors’ projected cash flow report, and using the data from these analyses, updated the earned cash flow report. Involved in claims and impact analyses, as well as other type of cost related studies.

Civil Engineer III في City of Milwaukee, Bureau of Engineers
  • الولايات المتحدة
  • أبريل 1974 إلى سبتمبر 1989

Held a series of positions in the Bureau of Engineers with increasing responsibilities in engineering project management, design, analysis, and drafting. Includes supervision of a design team of engineers and drafting techs

الخلفية التعليمية

ماجستير,
  • في Marquette University
  • مايو 1982
بكالوريوس,
  • في Marquette University
  • ديسمبر 1973

Specialties & Skills

Document Management
Schedule Control
Schedule Development
Cost Control
Project Control

اللغات

الانجليزية
متمرّس
الاسبانية
متمرّس