جورج اميل حنا, Senior Mechanical Engineer

جورج اميل حنا

Senior Mechanical Engineer

ConocoPhillips

البلد
استراليا
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
22 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 3 أشهر

Senior Mechanical Engineer في ConocoPhillips
  • استراليا
  • أشغل هذه الوظيفة منذ ديسمبر 2018

 Work in IOSC and support OPS team onshore (DLNG) and offshore (Bayu-Undan) facilities.
 Manage Engineering MOC for drawings, procedures, and datasheets updates.
 Tech Notes, Root Cause Analysis and Incident Investigation Reports.
 Perform Engineering proposals for temporary and permanent repairs safely and in cost effectively manners in accordance to National/International Standards and Industry Good Practice.
 Pipe stress analysis and equipment external loads reports assessment (FEA & CAESAR II reports).
 Communicate with cross-functional stakeholders/disciplines the proposed design/procedure changes.
 Issue Material/Fabrication requisitions and specification datasheets for Piping & Static Equipment.
 Support Asset integrity team in Static Equipment scope analysis in Major Hazard Facilities.
 Scope packaging, Engineering Dossiers and support DLNG Life Extension & Plant growth.
 Small projects, Vendor packages, and stakeholder’s management.

Mechanical Engineer في KBR/Chevron
  • استراليا
  • يونيو 2017 إلى ديسمبر 2018

 Perform Root Cause Analysis and Engineering assessment for Static Equipment issues.
 Implement Engineering solutions and changes via MOC procedure.
 Write up Technical Notes and Decision Sheets including cost analysis.
 PID and Design verification review for equipment rerating (Ex. vessels, drums, and Heat Exchangers)
 Write up Scope of Work for design changes, equipment rerating, procurement, and execution scope.
 Coordinate and manage Contractors and stakeholders for the proposed solution and executed scope.
 Monitor and report on project progress and provide alternative proposals to mitigate schedule delay.
 Issue Construction details and fabrication requests and respond to Contractors TQs.
 Submission of design alteration for WorkSafe WA registration in accordance to Occupational Health and Safety Regulations.

 Represent the client to:
 Identify and manage scope of work and apply Management of Changes process.
 Identify and report on unapproved deviations and deficiencies.
 Verify executed work complies with plans and specifications.
 Monitor progress and manage Sub-contractors performance and scope transfer.
 Supervise Field Engineers and coordinate with various entities.
 Risk assess design changes in accordance to Process Conditions.
 Resolve Engineering conflicts and mitigate negative impact to work progress.
 Prepare, review, and issue Work Packs, cost estimate, WRN, Site Instructions, TQs, and TDRs.
 Project Completion, Carry Over Works closing, and Vendor back charge.
 Commissioning interface and Coordinate commissioning schedule.
 Legal interface and Scope MOC.
 Assist Package Manager in planning, directing, supervising, and controlling Scope of Work.
 Priorities Management and communicate commercial and contractual impacts to Management.

Project Engineer Mechanical في CCC
  • استراليا
  • مايو 2016 إلى يونيو 2017

 FEED engineering and procurement support.
 Develop Project Documents QMP, CMP, CEP, SOW, WAP, ITP, and update Project Specifications.
 HAZOP workshops, PID review, design proposals assessment, coordinate and record design changes.
 Carry out site visits prior to construction commencement.
 Perform Risk Assessment Workshops, Design constructability, and construction methodology.
 Live Line welding and critical lifts Management.
 Evaluate proposed WPS and provide test coupons MTO.
 Lead Procurement in sub-contractors’ packages and Long Lead Items.
 Implement QA check to delivered material and certificates.
 Process RFQ, perform Technical Bid Evaluation, and prepare sub-contracts’ packages.
 Review sub-contract agreements and develop Split Responsibility Matrix.
 Manage and lead Constructions readiness and progress meetings with client and subcontractors.
 Manage and control sub-contractors and achieve Project milestones.
 Plan construction program and 2-weeks look ahead schedule.
 Schedule facility’s shutdown for Tie-ins with Operations interface.
 MDR, CDR, and as-built verification and signing of.
 Execute undertaken works under Origin PTW system for brown field.

Contract & Planning Manager في Nicheliving
  • استراليا
  • مارس 2015 إلى يناير 2016

 Develop, monitor, and track program schedules for all projects.
 Prepare budget breakdown and cost estimate.
 Implement Cost control to deliver projects within the approved budget.
 Lead and supervise Contracts Administrators and approve requested POs.
 Negotiate sub-contractor's quotations, prepare and review sub-contract agreements.
 Identify and report on project's delays and provide alternative plans for reparation.
 Prepare, submit, and negotiate progress claims with clients as progressed on site.
 Process RFQ, perform Technical Bid Evaluation, and prepare sub-contracting packaging
 Verify invoices against progress claims, approve payment, and apply retention.

Field Piping Engineer في Bechtel
  • استراليا
  • أغسطس 2014 إلى مارس 2015

 Provide Field Engineering support to resolve design discrepancies and conflicts.
 Flange management verification and Field Weld mapping.
 Module Yard piping Hydro-testing and punch list management.
 Develop action list to verify construction completion.
 Punch List walk-downs and Coordinate joint walk-downs with client for punch list closing.
 Test Packs, NDE clearance, and manage client release “ready for test”.
 Sign off test boundaries and check M&TE certs, ranges, valves installation, positions, etc.
 Test witnessing and signing off and obtain Client acceptance.
 Perform field substantiation of spool testing, Flushing, and drying.
 Verify systems’ restoration prior to commissioning commencement.
 Communicate with supervisors to ensure that procedures are understood and properly implemented.

Project Engineer في Consolidated Contractors Company (CCC)
  • استراليا
  • مايو 2013 إلى يونيو 2014

+ Acting as a CM in facilities section and coordinate between Mechanical/Civil/E&I and subcontractors.
+ Planning, monitoring, and control projects' progress and cost to achieve project’s milestones.
+ Prepare Work Breakdown Structure (WBS), detailed schedule, and weekly look ahead plan.
+ Site technical support, Risk Management assessment and apply the quality management plan.
+ Full site management for mechanical pipeline’s facilities installations and erections (Pig Launchers, Receivers, Liquid Separators, Storage Tanks, Valves, accumulators, MIJs, platforms ... etc).
+ Full material control, review BOQ, check grades and classes, and prepare material balance orders.
+ Reviewing Isometric drawing, Fab-shop and Mark-ups welding drawings and provide as-built drawings.
+ Control and manage all welding activities as per approved WPS including PWHT and NDT testing (RT, UT, PAUT, MPI).
+ Prepare and reviewing lifting plans for critical lifts in accordance to Safety procedures.
+ Coordinate for per-commissioning and Hydro-test activities (HT Packages and Valves testing).
+ All Back-end activities, Punch lists, red mark and as-built drawings review and signing off.
+ Authorized as a work Permit issuer for all pipeline works and back-end activities

Senior Mechanical Engineer في Engineering Consulting Group "ECG"
  • مصر - الإسكندرية
  • يناير 2012 إلى فبراير 2013

 Study P&IDs, Isometric drawings and project specifications, and Responsible to find out any deviation before construction phase.
 Collect information for design completion and Prepare net sketches for new proposed pipe's routings.
 Prepare planning schedule and method of statement for equipments installation and present an estimation for towers & piping welding schedule.
 Coordinate with the client for any change/update in design drawings and study the impact to the main design and estimated project schedule.
 Review and approve shop drawings and method of statements submitted by contractor and reply to related RFIs & DFCs.
 Prepare sketches and layout drawings for equipment’s arrangement storage for loading and unloading operation to ensure easy access for lifting plan and installation.
 Check the delivered equipments on site and prepare reports for any damage found.
 Following up the installation of mechanical equipments and towers according to vendor drawings and instructions, and to ensure full compliance with specifications and contract conditions.
 Following up job performed by the contractor on site and check welding process to confirm its compliance with the approved WPS (Welding Procedure Specification).
 Produce weekly programs, risk assessment and as-built information.
 Reports to Construction Manager / Resident Engineer monthly reports and prepare necessary correspondences with the client.

: Mechanical Technical Office Section Head في Consolidated Contractors Company ( CCC )
  • مصر - القاهرة
  • أغسطس 2008 إلى يناير 2012

 Lead and supervise of 12 engineers and draftsmen of MEP technical office.
 Review contract drawings, BOQ, project specifications and managing submittals schedule.
 Preparing all mechanical shop drawings for HVAC, Plumbing and Fire Fighting systems.
 Planning and setting out of Mechanical Plant Rooms and equipments layouts such as Fire Fighting, Water Treatment and Domestic Water systems, AHUs, Chillers, HVAC pumps, Cooling towers, … etc.
 Reviewing equipment’s calculations and provide selection schedules.
 Reviewing material submittals and select the proper material according to required specifications.
 Study and review all design changes and arrange for the required RFIs, DFCs, and VORs accordingly.
 Preparing material take-off and arranging for balance material orders.
 Prepare and Review all EM coordinated shop drawings with fully Arch / structural interface.
 Signing off all mechanical drawings before issuing it to the consultant for approval.
 Reviewing Elec. and Arch. drawings, and signing it off before submitting.
 Managing site problems and coordinate the proposed solutions with the consultant.
 Liaison with project’s sub-contractors and attending site tours

Sr. Mechanical Engineer (site / office) في Consolidated Contractors Company ( CCC )
  • المملكة العربية السعودية - الشرقية
  • يوليو 2006 إلى أغسطس 2008

 Responsible of HVAC, Plumbing and Fire Fighting works in 34 of Project buildings (sub stations, Process Interference Buildings, OMEs, …)
 Review all drawings, make the necessary modifications and coordinate between main technical office in Abu-Dahabi and Saudi ARAMCO to ensure full compliance with ARAMCO's Standards (SAES) before installation.
 Prepare agenda for engineering meetings and call for overseas meetings.
 Full site supervision for construction and installation of Plumbing, Fire Fighting and HVAC systems and equipments (AHU, ACCU, Fans, heaters, Filters, BRV, etc …).
 Prepare planning schedule for work plan between mechanical, electrical and civil teams to get the best progress and avoid any delay.
 Provide time schedule, submit weekly progress reports, prepare look a head plan and responsible to achieve the target constant program.
 Following up purchase orders and monitoring material status.
 Reviewing all variation orders and monthly BOQ for sub contractors and vendors and signing it off before payment.
 Responsible for managing closure of punch list items for HVAC, Plumbing, Fire Fighting Systems.
 Prepare a schedule and following up for HVAC commissioning, pre-commissioning, start up and balancing tests and coordinate with all concerning vendors and handling over to the client (ARAMCO).
 Prepare a schedule for preventive maintenance and be On-Call for emergency failures.
 Prepare site Work Permits as a Work Permit Receiver authorized by ARAMCO

: Site - office Mechanical Engineer in the Electromechanical Department. في Consolidated Contractors Company ( CCC )
  • مصر - الإسكندرية
  • فبراير 2005 إلى يونيو 2006

 Surveying site conditions and preparing shop drawings for the mechanical equipment arrangement and piping layout (Residual Pumps, Backwash Pumps, Alum Pumps, …)
 Responsible for Providing Submittals, shop drawings, pipe’s supports calculations and similar installations to the Project Consultant and follow it up till the final approval.
 Prepare method statements to replace / install Pumps and mechanical equipments (Vertical & Horizontal rotating pumps) in existing buildings without plant shutdown, including constant time schedules.
 Check received materials and assuring that it is comply with Project’s specifications.
 Full Site Administration and assign tasks to site workers to meet the time schedule with high quality performance.
 Full responsibility of Chemical Feeding Pumps System (shop drawings, take off, Installation, Commissioning, operation and maintenance) and prepare required material for preventive maintenance.
 Follow up and negotiate with instrumentation engineers for the required modifications in PLC Programs to get best performance for the automatic dosing and operation.
 Responsible of punch list closure and over all check for installed equipments.
 Coordinate between Civil and Electromechanical Departments, and following up work performed by Sub-Contractors.

Designer Engineer in the Technical Office. في Marina Platforms Factory
  • مصر - الإسكندرية
  • سبتمبر 2001 إلى يناير 2005

 Visit project’s sites and provide different proposals for buildings façades maintenance systems after studying project’s drawings.
 Discuss with consultants - for the large scale projects (such as Bibliotheca of Alexandria, smart Village, American University, German Embassy, …) - the proposed solutions and recommend the most suitable.
 Design in details the approved proposal and prepare the drawings sheet for machining.
 Design Special mechanisms for industrial needs (Such as power steering, scissor lifts, self drive scissor, mono rail carriage …) and get the consultant approval.
 Design and select required steel sections for different products according to variable loads.
 Performing the mechanical loads and design by computer programs.
 Design of goods lifts including motor capacity calculations, wire rope selection and velocity calculations under various loads.
 Developing the Design of articular and telescopic lifts and improve its stability.
 Design & develop hydraulic circuits of company products to get best performance.
 Responsible to get the registration for different designs in the “Egyptian Authority for Designs Development”.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Faculty of Engineering
  • يوليو 2001

Specialties & Skills

Oil and Gas
Commissioning
autoCAD, mechanical desktop, SAP 200, other design program
technical mechanical engineering solutions

اللغات

الانجليزية
متمرّس
الالمانية
مبتدئ
العربية
اللغة الأم

العضويات

Syndicate of Engineers - Egypt
  • Mechanical Engineer
  • July 2001
Engineers Australia
  • Mechanical Engineer
  • October 2012
Project Management Institute - USA
  • Project Manager
  • June 2017

التدريب و الشهادات

Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
June 2016
صالحة لغاية:
June 2023