محمد كرم محمود عبد الحليم, Acting as / Mechanical Construction Manager

محمد كرم محمود عبد الحليم

Acting as / Mechanical Construction Manager

ELSEWEDY POWER SYSTEM PROJECTS

البلد
مصر - القاهرة
التعليم
ماجستير, Master of Business Administration - MBA
الخبرات
13 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 1 أشهر

Acting as / Mechanical Construction Manager في ELSEWEDY POWER SYSTEM PROJECTS
  • تنزانيا - Morogoro
  • أشغل هذه الوظيفة منذ ديسمبر 2021

Project Name: Julius Nyerere Hydropower Project JNPP, 2115 MW, Project
Location: Tanzania.

Owner: Tanzania Electric Supply Company - TANESCO
Client: TANROADS ENGINEERING CONSULTING UNIT - TECU

Project Brief: Joint Venture between The Arab Contractors and ELSEWEDY Electric for The Engineering, Procurement, Construction, and Commissioning (EPCC) of Julius Nyerere Hydropower Station is a hydroelectric dam across the Rufiji River in eastern Tanzania. The power station is expected to have an installed capacity of 2, 115 megawatts

Employer: Joint Venture of The Arab Contractors & ELSEWEDY Electric - JVACEE.

1- Work Duration: September 2022 till Present.
Job Role: Acting as / Mechanical Construction Manager for the Power House Package.

o Managing the site activities of the Powerhouse, including 9 Francis turbines, generators, and all related balance of plant systems and utilities.
o Leading a team of over 500 members from 5 different countries for the self-execution scope.
o Managing package subcontractors and overseeing budget issues.
o Managing communications with the relevant key stakeholders (client, consultant, and/or owner).
o Facilitating effective communication with key stakeholders including clients, consultants, and owners.
o Facilitating and coordinating communication internally and externally among all project teams and disciplines.


2- Work Duration: December 2021 - September 2022.
Job Role: Lead Construction Engineer - Mechanical.

o Managing the site activities for the self-execution scope of the Powerhouse and leading its related teams.

Acting as Deputy Construction Manager في ELSEWEDY POWER SYSTEM PROJECTS
  • مصر - أسيوط
  • يونيو 2018 إلى ديسمبر 2021

Project Name: Assiut Supercritical Power Station 1X650 MW, Project
Location: Assiut, Egypt.

Owner: Upper Egypt Electricity Production Company (UPPEC)
Client: Power Generation Engineering and Services Company (PEGSCO)

Project Brief: Main Contractor for CP-118 (Mechanical Equipment / Pipe Installation) Package, EEPSP is the first Egyptian contractor awarded CP-118 Package


1- Work Duration: March 2020 - December 2021.
Job Role: Acting as Deputy Construction Manager

o Directing and overseeing all mechanical site activities and subcontractor works throughout the various project phases, including construction, testing, pre-commissioning, commissioning, and handing over.
o Monitoring and addressing health, safety, and environmental (HSE) issues on-site, as well as ensuring adherence to quality standards
o Taking charge of pre-commissioning activities and providing assistance during the commissioning process
o Managing the seamless handover of systems to the client
o Facilitating effective communication with key stakeholders including clients, consultants, and owners

2- Work Duration: June 2018 - March 2021.
Job Role: Senior Construction Engineer - Mechanical

o Taking charge of subcontractor activities specifically related to the BOP (Balance of Plant) piping systems.
o Conducting inspections of the piping systems, including both the piping and supports, to verify quality, integrity, and adherence to design and engineering standards.
o Conducting inspections of static and rotating equipment associated with the piping systems to ensure proper installation and functionality.
o Overseeing the receiving and inspection process for materials used in the BOP piping systems and their equipment.
o Collaborating with procurement teams and suppliers to resolve material-related issues or discrepancies.

Senior Construction Engineer – Mechanical في ELSEWEDY POWER SYSTEM PROJECTS
  • مصر - بني سويف
  • يونيو 2017 إلى يونيو 2018

Project Name: Beni Suef Combined Cycle Power 4800MW, Project
Location: Beni Suef, Egypt.
Client: Upper Egypt Electricity Production Company (UPPEC)

Project Brief: A Consortium between SIEMENS AG & ELSEWEDY ELECTRIC for The Engineering, Procurement, Construction, and Commissioning of Beni Suef new Combined Cycle Power with 4800 MW

Job Role: Senior Construction Engineer - Mechanical for Heat Recovery Steam Generator 42 (HRSG)

o Leading a multicultural team of about 200 members from more than 3 different countries
o Managing Self-Execution Construction Activities related to the piping systems.
o Supervising Daily Activities: through guidance and direction to the team members involved in the construction activities for the piping systems, assigning tasks, monitoring progress, and addressing any issues or challenges that arise.
o Planning Upfront Activities, creating detailed plans, coordinating resources, and setting clear objectives and timelines for the team.

Senior Mechanical Engineer في The Petroleum Projects and Technical Consultations Company (PETROJET)
  • العراق - البصرة
  • فبراير 2016 إلى يونيو 2017

Project Name: SIBA Field Development Project,
Project Location: Basra, Iraq.

Client: Kuwait Energy Iraq limited (KEIL)

Project Brief: The Engineering, Procurement, Construction, and Commissioning (EPCC) contract with $185-million to build a central processing facility (CPF) at the SIBA gas field development with a capacity of 110 million cubic feet a day to treat the production fluids and raw water to produce dry gas. And also include gas-gathering units from the well-sites, raw water in-take station


Work Duration: February 2016 - June 2017
Job Role: Senior Mechanical Engineer at the Plant scope

o Maintaining effective communication channels with key stakeholders such as clients, consultants, and owners, ensuring timely and accurate information exchange.
o Taking charge of the technical recruitment process for technicians from Egypt to join the project in Iraq. This includes sourcing candidates, conducting interviews, evaluating qualifications, and facilitating the onboarding process.
o Ensuring compliance with project requirements and industry standards by preparing and reviewing comprehensive work packages, procedures, and method statements for mechanical construction activities.
o Overseeing the fabrication and installation process of Glass Reinforced Epoxy (GRE) piping. This involves witnessing inspections, verifying compliance with specifications, and ensuring proper execution.
o Taking responsibility for the preparation of the assembly procedure for the thermal oxidizer flare, which includes planning and documenting the step-by-step process for the installation of this specific component. The procedure accounts for its substantial length (over 60 meters) and weight (650 tons).


Work Duration: February 2016 - June 2017
Job Role: Area Construction Manager for Upstream Pipelines

o Ensuring compliance with project requirements and industry standards by preparing and reviewing comprehensive work packages, procedures, and method statements for mechanical construction activities.
o Reviewing received drawings and identifying obstacles such as material shortages, routing issues, clashes, or mismatches. Proposing redesign solutions to address these challenges and ensure smooth construction progress.
o Develop comprehensive plans for site construction activities, aligning them with the project schedule, milestones, and priorities. This includes creating a detailed roadmap that outlines the sequence of tasks and resources required for successful execution.
o Take charge of day-to-day site management, assuming leadership in overseeing and monitoring the site labor force and subcontractor activities. This involves ensuring compliance with safety protocols, quality standards, and project specifications.
o Coordinate and supervise the site labor force, providing guidance, support, and clear instructions to optimize productivity and maintain a safe working environment. Foster a collaborative and motivated team atmosphere to enhance overall performance.

Site Manager في The Petroleum Projects and Technical Consultations Company (PETROJET)
  • العراق - البصرة
  • ديسمبر 2014 إلى فبراير 2016

Project Name: Khor Al Zubair - Nasiriyah LPG Pipeline (PL.),
Project Location: Basra, Iraq.

Client: Oil Pipeline Company - OPC

Project Brief: The Engineering, Procurement, Construction, and Commissioning (EPCC) contract $100-million for a 16-Inch pipeline with 200 KM length to transfer Liquefied petroleum gas (LPG)

Job Role: Site Manager for 70 KM Section.

Main Achievements:
Completed the construction activities ahead of schedule, encompassing:
o Welding, laying, and tie-in of a 70 KM length pipeline.
o Excavation and backfilling along the entire pipeline route.
o Installation of cathodic protection systems and fiber optics cable.
o Successfully executed three river-crossings using open-cut methods.
o Accomplished twenty-five road crossings through a combination of thrust boring and open-cut techniques.
o Fabrication and erection of four valve-room stations.
The efficient completion of these tasks demonstrates the project team's ability to meet and exceed project milestones while ensuring the highest standards of quality and safety.

Mechanical Construction Engineer في The Petroleum Projects and Technical Consultations Company (PETROJET)
  • مصر - السويس
  • فبراير 2011 إلى سبتمبر 2014

1- 20 KM Length, 10” Ammonia PL., Suez, Egypt Feb 2014 till Sep 2014
Job role: Mechanical Site Manager, succeed to overcome the lateness of project start and finish all work in fast track schedule plus change order equal to 30% of project budget

2- 6 KM, Sokhna Power station 20” Feeding Mazut PL., Suez, Egypt Dec 2013 till Feb 2014
Job role: Superintended Mechanical Engineer, succeed to select the best route of the pipeline in the project initiation phase as the area was having many obstacles and future construction facility

3- Mechanical site Engineer Feb2012 till Dec 2013
- 4.5 KM, Sokhna Power station 24” Natural Gas (NG.) PL., Suez, Egypt
- 40 KM Gamasa - Venusa 42” NG. PL., Dakahlia, Egypt
- Utility Cycle, New land Oil Train, South Sinai, Egypt
- 6 KM, 32” Importing NG. PL. Suez, Egypt
- 90 KM, Badr - El Tebbin 20" Petroleum PL., Helwan, Egypt
- 9 KM, 32” Water Disposal PL., South Sinai, Egypt
- 1 KM Length, 20” Ezz Steel Feeding NG. PL., Suez, Egypt
- 34 KM, Abo Sultan - ElShabab Power Station 24” NG. PL., Ismailia, Egypt
- 14 KM, Gamasa - Abo Madi 24” NG. PL., Dakahlia, Egypt

الخلفية التعليمية

ماجستير, Master of Business Administration - MBA
  • في The Arab Academy For Management, Banking And Financial Sciences
  • فبراير 2024
ماجستير, Pre-Master of Operations Research
  • في Cairo University - Institute of Statistical Studies and research (ISSR)
  • يونيو 2011

Pre-Master of Operations Research, Cairo University - Institute of Statistical Studies and research

بكالوريوس, Bachelor of Science in Mechanical Engineering, Design & Production Department
  • في Ain Shams University
  • يوليو 2010

Bachelor of Science in Mechanical Engineering, Design & Production Department

Specialties & Skills

Organised
Leadership
Management
Pipelines
Leadership
Planning
Management
Autodesk AutoCAD 2D
MS Word
MS Power Point
MS Excel
Project Management
Mechanical Construction Supervision
Mechanical Construction Inspection
Project Coordination
Team Management
Site Management
Construction Management
Stockholders Management
Pipelines Construction
Piping Construction

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.


اللغات

الانجليزية
متوسط
العربية
اللغة الأم

العضويات

Industry Development Team - IDT, student activity in Ain Shams University
  • Cofounder
  • August 2008
Search Results Web result with site links PMI: Project Management Institute
  • Member & PMP certified
  • May 2020
Egyptian Engineers Syndicate
  • Member
  • July 2010

التدريب و الشهادات

Project Management Professional (PMP)® (الشهادة)
تاريخ الدورة:
May 2020
صالحة لغاية:
May 2026
ASNT Level II - VT (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
December 2020
ASNT Level II - UT (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
December 2020
ASNT Level II - RT (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
December 2020
ASNT Level II - PT (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
December 2020
ASNT Level II - MT (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
December 2020
OSHA General 1910 (الشهادة)
تاريخ الدورة:
August 2013
ASME B31.1 (تدريب)
معهد التدريب:
American University in Cairo
تاريخ الدورة:
September 2017
المدة:
30 ساعة
ASME B31.3 (تدريب)
معهد التدريب:
American University in Cairo
تاريخ الدورة:
December 2017
المدة:
30 ساعة
Pipeline Engineering for Oil & Gas Industries Qualification Diploma (الشهادة)
تاريخ الدورة:
March 2019
ASME B31.1 Process Piping Diploma (الشهادة)
تاريخ الدورة:
August 2019
ASME Sec. VIII Div. I Boiler & Pressure Vessel Code Diploma (الشهادة)
تاريخ الدورة:
September 2019

الهوايات

  • Photoshop
  • Learning
  • Reading