Ghazi Abdul Mateen Babur, Electrical Inspector

Ghazi Abdul Mateen Babur

Electrical Inspector

Saudi Arabian Parsons

البلد
المملكة العربية السعودية - الرياض - الخليج
التعليم
بكالوريوس, Electrical Technology
الخبرات
28 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :28 years, 0 أشهر

Electrical Inspector في Saudi Arabian Parsons
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ مايو 2015

Overall responsible for site installation inspection, Testing & Commissioning.
Attend the site meeting with the contractor for day-to-day activities.
Review shop drawing in line with approved design drawing & project specification.
Preparation of manpower log & activity tracker.
Preparation of progress report.
Review the construction work package & inspection test plan (ITP) for submitting to RE for final review and further processing
To ensure and adhere to the quality of work and safety measurements at the site.
Raising quality observation for defective installation to the contractor and maintaining the quality log. Also, a follow-up to the contractor for close-out.
Monitoring the installation activity and raising the non-conformance to the contractor for rectification.
Unsafe & near miss observation to be escalated to the contractor for corrective action and maintaining the safety observation log.
To ensure electrical safe work permit systems is in place and monitoring for zero accidents, zero near-miss at site
To ensure and adhere to the quality of work and safety measurements at the site.

Electrical Supervisor في Pak arab Fertilizers Multan
  • باكستان - ملتان
  • أغسطس 2006 إلى مايو 2015

Verify the redness of the work location & material requirement for completion of turnaround task in the scheduled timeframe.
Main role played for all major breakdown
Monitor the installation work in line with the quality plan and project Specification.
Installation and commissioning PLC-based motors (Ready to start, Running, Tripping) Annunciation system.
Supervision for cable laying, termination, jointing from MCCs, Substation, and Motors.
Testing, commissioning, and control circuits of all cubicles Motor’s Starters and Transformers Breakers.
All Electrical Schedule Corrective and Preventive Maintenance at Ammonia, CO2, Nitric Acid, Co-generation, and NP Plants.
Turn Around Supervision activities all MV, LV Motors, Substations, and MCCS.
Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment, repair, or replacement.

Sr.Electrical Technician في Jal Internation Limited
  • المملكة العربية السعودية - الجبيل
  • أبريل 2004 إلى أبريل 2006

SAMREF: Saudi Aramco Mobil Refinery Company, Low Sulphur ADO Projects- From December 2005 to April 2006.
Gulf Stabilizers Catalyst Extension projects - From July 2005 to December 2005
SABIC: Jubail united petrochemical Company Projects - From April 2004 to July 2005.

Installation, commissioning, and testing of Simplex PLC System for Sulphur Recovery Unit.
Extension of Oil Pump Station motors and control termination.
Installation, commissioning, and termination of MOVS (motor-operated valve) in field pipelines through remote Control Operation in the control room.
Installation, commissioning and testing of Heat Tracing Media of Ammonia pipelines.
Worked in SABIC (JUPC) Supports services in central workshop Jubail.
Installation, commissioning, and testing of Maintenance Machinery (lath Machines Radial drilling machines, Power cutters, welding sets, etc.) in central workshop JUPC project.
Maintenance of LV motors and lightings.

Electrical Technician في Ibrahim Group (Plyester plant)
  • باكستان - فيصل أباد
  • أبريل 2002 إلى أبريل 2004

Installation, commissioning of Motors Control Centre and HT, LT Substation.
Maintenance of LT, HT control panels.
Installation and commissioning of plant lights and wiring Circuits.
Cables lying and termination Project of Draw line and Spinning Section.
Installation, commissioning, and termination of power and control 3MW to 5 MW transformers.
Maintenance of 1.5 KW to 630 KW VFDs, Battery Banks, and MCCs.

Electrician Electrical في Dynasty Textiles and Dying (Pvt.) Ltd
  • باكستان - لاهور
  • ديسمبر 1994 إلى أكتوبر 2001

Initial Factory Textiles (Knitting, Stitching, Dyeing) Machines Installation Commissioning activities.
Start-up Phases.
Trouble Shooting and Maintenance activities.
Lighting installation and control wiring through Lighting DBs’.
Installation, commissioning steam pressure (100Psi) Boiler Project.

Electrician Electrical في Iram Textiles Ltd
  • باكستان - لاهور
  • مايو 1993 إلى نوفمبر 1994

Installed, repaired, and Maintained motors, transformer, Generator, lights, appliances, circuits, wiring, other electrical system equipment, and components.
Troubleshooting of Garments Machines (Tumbler Winch, Soft Flow, Knitting, Dryer, Embroidery) Control and Power Circuits

الخلفية التعليمية

بكالوريوس, Electrical Technology
  • في Preston University
  • مارس 2011
دبلوم, D.A.E (3years) Electronics Technology
  • في Government College of Technology Multan
  • ديسمبر 1993
الثانوية العامة أو ما يعادلها, Science Group
  • في Government High School Kot Addu
  • يوليو 1988

Specialties & Skills

Troubleshooting
Project Planning
Microsoft Excel
Plant Commissioning
Electrical Maintenance
Microsoft Word
Microsoft Excel
Commissioning
Inspection
Trouble Shooting
Engineering
Electrical Supervision
Microsoft Office

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

التدريب و الشهادات

Hamaari Taqat (الشهادة)
تاريخ الدورة:
July 2007
صالحة لغاية:
July 2007