ghulam mustafa, communication engineer for C4I Projects

ghulam mustafa

communication engineer for C4I Projects

jash technical services co ltd

Lieu
Pakistan - Rawalpindi
Éducation
Baccalauréat, telecommunication
Expérience
14 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 7 Mois

communication engineer for C4I Projects à jash technical services co ltd
  • Arabie Saoudite - Tabuk
  • Je travaille ici depuis novembre 2011

Worked in the NOC of Seder Group Advance project Department as a engineer to look after the status of worthiness of more than 2000 communication sites for Ericson, Alcatle &Lucent.Participated in the drive tests assignments carried out in the Dammam areas.I was also assigned the duties of project equipment migration supervisor in Riyadh STC installations. November 2009 to August 2011.

Working as a Electronics &communication Engineer (Consultant) in the ministry of Seaport Authority (SEAPA) Riyadh to look after the affairs of 9 seaports for their communications and navigational aid equipment and to plan for achieving the high-level of their operations according to the international standards. My responsibilities are as under to carry out the inspections for operational worthy of all the seaports Communication equipment after every three months for their communication systems i.e. HF, VHF (Handheld radios and base stations) on the ships/tug boats and control towers. To make the plan for equipment modernization for communication and navigational aid electronics, To prepare the tenders for modernization. To check the operations according to the ITU levels.

Tabuk Airbase as a communication engineer for the followings communication systems à JASH TECHNICAL SERVICES CO LTD KSA - TABUK
  • Arabie Saoudite - Tabuk
  • Je travaille ici depuis novembre 2011

June 2005-Nov 2007
Served at Tabuk Airbase as a communication engineer for the followings communication systems.
HF .VHF.UHF. Microwave Satellite Tropo scatter and Mobile communications on American C4I System (command control communications Intelligence through computers. I was responsible for VHF, UHF radios, Satellite, Microwave and Mobile Communication covering 2.5 G to 3.5 G activities Systems.Carried out equipment optimization in the area of responsibility. Also served at one of the radar site for two years. Following equipment were supposed to be maintained for their operational worthy.
1. radar
2. VHF & UHF radios
3. 12 system exchange.
4. security equipment (data gathering and cctv)

COMMUNICATION ENGINEER C4I PROJECT à JASH TECHNICAL SERVICES CO LTD TABUK -KSA
  • Arabie Saoudite - Tabuk
  • Je travaille ici depuis novembre 2011

• Installation of Mitel switch 2000. (Digital exchange)
• Installation of photo state machines on channels, teleprintres and. computers.
• Installation of satellite Hub Station equipment and Earth Stations.
• Conducted the Path profile surveys of different sites and power transmission test with Indonesia on graphic x y printers.
• Carried out the spectrum analysis of all types of signal transmissions.
• Installed the following types of antenna systems.
• Rohmbic Antennas
• Yagi antennas
• C-plath antenna systems
• Dish antennas fot satellite systems.
Operation & maintenance of tropo scatter communication
Systems in the Kingdom of Saudi Arabia.
• Changing of klystron tubes and power amplifiers.
• Carrier mx-180 and km-9 systems
• Microwave system Ambala
• Low level radios
• High power amplifiers.
• Beam reflectors . 1978-1993

communication engineer for C4I Project à jash technical services co ltd tabuk ksa
  • Arabie Saoudite - Tabuk
  • Je travaille ici depuis novembre 2011

1996-2004
Served in Sanam Establishment as a regional manager.762 persons were in this company. My responsibilities were to maintain the power generation, air conditioning systems and their communication systems operational worthy for five hospitals and fifty medical centre in the northern region (Tabuk) . 1995-1996

Served in the Pakistan military at the highest rank of Major in the Corps of Signals at different technical, administrative, electronics and communication security and logistic appointments including monitoring and surveillance of different communications of target countries
• Carried out the installation of following communication systems.
• Line communication multichannel carrier systems/ equipment.
• ACT (1+1) - Two channel carrier system
• ACT (1+4) - Four channel carrier system.
• VZ-12K- Twelve channel carrier system
• AN/TCC 23-Four channel carrier system
• AN/TCC-7-Twelve channel carrier system.
• Radio relay/microwave communication systems.
• Radio relay for four channels carrier systems. (Military microwave)
• Radio relay for 12 channels carrier systems.GRC-103 with TD-660.
• Radio relay FM-200 with carrier VZ-12k system.
• Digital Harris Microwave with baseband equipment.
• Direction finding systems c-plath. ( communication security)
• Satellite communication systems.
• Installation of 3 meter dish antenna system including the LNA, UP converter, Down converter. Power Amplifier and Power Supplies of C band earth satellite and Hub station on Intelsat -5 and 7. Installation of antenna control system .modulators and demodulators and baseband equipment.

project engineer and Project Administrator for the following projects à Siemens Project
  • Arabie Saoudite - Riyad
  • novembre 2007 à novembre 2009

November 2007to November 2009
Worked as a project engineer and Project Administrator for the following projects.
• Project Engineer
• CCTV-Siemens Project. Completed the installation of CCTV equipment on 34 sites in the kingdom (15xRiyadh and 19 x Southern area)
• Installation of electromagnetic locks at 19 sites of STC, each site having 5 x locks, card readers, alarm and control panels panels.
• Installation of 25x 5ton air conditioning units (indoor and out door units) at different STC sites in Riyadh.
• Electrical and HVAC Surveys of 26 sites in the kingdom.
• Implementations of 24 GSM sites for 3G activities in Riyadh. Jeddah and Madina. Towers at all the sites were also extended up to 8 feet. Placing of second equipment shelter including civil works and electrification.
• Implementation of Physical Access Security System for 19 gates at Jubail Marafiq. (installation of turn styles. card readers, sensors, control panels and motorized gates, motorized cameras along with the monitors including their master control cards.
• Audio Alert and Warning System installed at Jubail Marafiq main office multistory building.
• Project Administrator
• Preparation of papers for project bidding
• Coordination for Purchase order
• Preparation of schedule for site surveys.
• Preparation of drawings for approval from the client /authority.
• Preparation of SOPs
• Coordination for scope of work
• Preparation for the demand of stores for the project implementation.
• Preparation of schedule for implementations
• Preparation of as built diagrams/drawings.
• Coordination for preliminary acceptance tests.
• Preparation of invoices for payments.
• Preparing the schedule for handing over the sites.

Éducation

Baccalauréat, telecommunication
  • à university of modern technology ( military college of signals
  • janvier 1984

Pakistan Bachelor degree in electronics and sciences military college of signals rawalpindi 1981-1984

Specialties & Skills

Communication Systems
Air Conditioning
Satellite Systems
Science
Military
AIR CONDITIONING
ANTENNA
COMMUNICATION SYSTEMS
POWER GENERATORS
MICROWAVE
POWER AMPLIFIER
POWER GENERATION
POWER SUPPLIES
SECURITY

Langues

Urdu
Débutant
Arabe
Moyen
Chinois
Débutant
Anglais
Débutant

Formation et Diplômes

satellite operation course (Formation)
Institut de formation:
UNITED STAES GOVERNMENT
Date de la formation:
June 1988
Durée:
240 heures

Loisirs

  • GETTING THE DC POWER OUT OF DIFFERENT SUBSTANCES
    YES i AM ABLE TO GET DC VoLTAGE OUT OF SAND , ORANGE SKIN AND COLD DRINKS