Girgis Twfilis, construction Manager

Girgis Twfilis

construction Manager

Orascom Construction

Location
Egypt - Cairo
Education
Bachelor's degree, Civil Engineering
Experience
23 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 6 Months

construction Manager at Orascom Construction
  • Egypt - Damietta
  • My current job since June 2016

1-Execution the Concrete works for manholes and duct banks according to drawings .
2-Production for concrete sinkers (Precast Blocks) required for Intake Pipe Lines (Marine work).
3-Coordination between involved parties about requirements to start sinkers erection for Intake Pipe Lines.

Construction Manager at Azmeel Contracting Company
  • Saudi Arabia - Jubail
  • December 2014 to December 2015

1- Executing the work items according the specifications and
drawings.
2- Coordination with subcontractors about the priorities.
3- Check the material needed in site.
4- Finalizing and solving problems occurred on site.

Construction Manager at Orascom Construction Company
  • Egypt - Cairo
  • January 2014 to November 2014

1- Executing the work items according the specifications and drawings.
2- Coordination with subcontractors about the priorities.
3- Check the material needed in site.
4- Finalizing and solving problems occurred on site.

senior quality control engineer at Orascom Construction Industries
  • Egypt - Cairo
  • April 2010 to June 2013

1-Following-up the work items according the specifications and drawings.
2-Inspection the reinforcement and formwork items for tanks & the finishing
works, the insulation epoxy paint and
3-Sharing in preparing Quality inspection plan and the Quality Control procedure .
4- Mission to El Obour Bridge for (Egyptian Armed Forces) (35, 000, 000 L.E)
As a Senior Quality Control Engineer (within the same work period)in 2013

Owner Representative at Concord
  • Egypt - Cairo
  • January 2009 to April 2010

Owner Representative on site.
check the contractor schedules and progress
meeting and progress discussion

quality control engineer at Orascom Construction Industries
  • Egypt - Cairo
  • January 2007 to December 2008

1-Following-up the work items according the specifications and drawings.
2-Inspection the finishing work items (masonry, plaster, painting, false
ceiling, marble, wall paper and carpet…etc), and following-up the
subcontractors, checking their progress & quality and quantities.
3-Handing over the work items to the owner.

Site Engineering Department at Alcatel ( through Sub-contractor)
  • Ghana
  • July 2005 to October 2006

1-Interfacing with the customer.
2-Dealing with the subcontractors and discuss them about their
Presented data and TSS.
3- Revision of TSS data presented from the subcontractors teams .
4-Supervision, revision, correction &responsible of all Auto-CAD
Drawings presented in the documents.
5- Filling the Final Detail Engineering Design and As Built
Documents &finalizing it to be without comments to presented to The customer.

site works Engineer at ALAN DICK
  • Egypt - Cairo
  • August 2004 to June 2005

1- New sites (roof top) supervision: (Towers, Poles, Shelters).
2- site installation works: antennas, feeders, clamps, earthing and cableTrays.
3- supervision on towers and monopoles bases reinforced concrete works.
4- Co-sites (existing sites)supervision : Changing the frequency 900 MHZ by 1800
MHZ to achieve high frequency for the network.

Supervision Engineer at (Civitech (consulting Center of Civil Engineering
  • Egypt - Cairo
  • June 2001 to April 2004

1- Mobinil Works ( Pylons -shelters- Masts ).
2- Check the structure systems of the bulidings which will carry Mobinil stations, If
these buildings can carry the Mobinil Equipmetns safely, otherwise chosing the
suitable solutions.
3-Supervision on Mobinil site works.
4-Supevision onVillage in Sheraton Heliopoils-Concrete works (Beam &H.B.
Systems).
5-Supervision on Village in El Obour city - Concrete works(Beam- H.B.Systems ).
6-Supervision on the R.C.Mobinil Towers 45&55 m bases.

site works Engineer at El Sherook Contracting
  • Egypt - Cairo
  • December 1999 to May 2001

1- 6 October University Hotel (retrofitting of columns and footings)
2-Constructions of new extensions for the existing building by using Very good adhesive chemical matrials (Flat Slab System )
3-The finishing works ( plastering, ceramic, paints, …etc )
4- 6 October University Hospital (completing its all finishing works) .

site works Engineer at Mosahmet El –Behera
  • Egypt
  • July 1999 to November 1999

1- El Shekh Zaaid Canal excavation &sand fixation and isollation works
2- Casting concrete using pumps and (Alkonz&Rahco ) machines.
3- Curing of concrete using a liquid material to protect the concrete

Education

Bachelor's degree, Civil Engineering
  • at Cairo University
  • November 1998

B.Sc. In Civil Engineering, Faculty of Engineering Cairo University, 1998 Project Grade: V. Good Description of the Project: • Lining of the El Shekh Zaaid Canal and its four Branches. • Choosing the suitable path for El Shekh Zaaid Canal and its four branches. • Planning of 1000 feddans farm and (Irrigation&drainage) canals paths.

Specialties & Skills

Finishing
AUTO BODY
CERAMIC
COLUMNS
CONCRETE
ENGINEER
ENGINEERING DEPARTMENT
FINISHING
RETROFITTING
SOLUTIONS

Languages

Arabic
Expert
English
Intermediate

Memberships

نقابة المهندسين
  • 22/94
  • March 1999

Training and Certifications

Project Managment Program (Certificate)
Date Attended:
May 2011
PRMG (AUC) (Certificate)

Hobbies

  • Swimming-walking