construction Manager
Orascom Construction
Total years of experience :23 years, 6 Months
1-Execution the Concrete works for manholes and duct banks according to drawings .
2-Production for concrete sinkers (Precast Blocks) required for Intake Pipe Lines (Marine work).
3-Coordination between involved parties about requirements to start sinkers erection for Intake Pipe Lines.
1- Executing the work items according the specifications and
drawings.
2- Coordination with subcontractors about the priorities.
3- Check the material needed in site.
4- Finalizing and solving problems occurred on site.
1- Executing the work items according the specifications and drawings.
2- Coordination with subcontractors about the priorities.
3- Check the material needed in site.
4- Finalizing and solving problems occurred on site.
1-Following-up the work items according the specifications and drawings.
2-Inspection the reinforcement and formwork items for tanks & the finishing
works, the insulation epoxy paint and
3-Sharing in preparing Quality inspection plan and the Quality Control procedure .
4- Mission to El Obour Bridge for (Egyptian Armed Forces) (35, 000, 000 L.E)
As a Senior Quality Control Engineer (within the same work period)in 2013
Owner Representative on site.
check the contractor schedules and progress
meeting and progress discussion
1-Following-up the work items according the specifications and drawings.
2-Inspection the finishing work items (masonry, plaster, painting, false
ceiling, marble, wall paper and carpet…etc), and following-up the
subcontractors, checking their progress & quality and quantities.
3-Handing over the work items to the owner.
1-Interfacing with the customer.
2-Dealing with the subcontractors and discuss them about their
Presented data and TSS.
3- Revision of TSS data presented from the subcontractors teams .
4-Supervision, revision, correction &responsible of all Auto-CAD
Drawings presented in the documents.
5- Filling the Final Detail Engineering Design and As Built
Documents &finalizing it to be without comments to presented to The customer.
1- New sites (roof top) supervision: (Towers, Poles, Shelters).
2- site installation works: antennas, feeders, clamps, earthing and cableTrays.
3- supervision on towers and monopoles bases reinforced concrete works.
4- Co-sites (existing sites)supervision : Changing the frequency 900 MHZ by 1800
MHZ to achieve high frequency for the network.
1- Mobinil Works ( Pylons -shelters- Masts ).
2- Check the structure systems of the bulidings which will carry Mobinil stations, If
these buildings can carry the Mobinil Equipmetns safely, otherwise chosing the
suitable solutions.
3-Supervision on Mobinil site works.
4-Supevision onVillage in Sheraton Heliopoils-Concrete works (Beam &H.B.
Systems).
5-Supervision on Village in El Obour city - Concrete works(Beam- H.B.Systems ).
6-Supervision on the R.C.Mobinil Towers 45&55 m bases.
1- 6 October University Hotel (retrofitting of columns and footings)
2-Constructions of new extensions for the existing building by using Very good adhesive chemical matrials (Flat Slab System )
3-The finishing works ( plastering, ceramic, paints, …etc )
4- 6 October University Hospital (completing its all finishing works) .
1- El Shekh Zaaid Canal excavation &sand fixation and isollation works
2- Casting concrete using pumps and (Alkonz&Rahco ) machines.
3- Curing of concrete using a liquid material to protect the concrete
B.Sc. In Civil Engineering, Faculty of Engineering Cairo University, 1998 Project Grade: V. Good Description of the Project: • Lining of the El Shekh Zaaid Canal and its four Branches. • Choosing the suitable path for El Shekh Zaaid Canal and its four branches. • Planning of 1000 feddans farm and (Irrigation&drainage) canals paths.