QA/QC ENGINEER
CARLO GAVAZZI ARABIA
Total years of experience :17 years, 4 Months
Project Name : Riyadh Metro Project Line-3, Package-B
Jeddah south thermal power plant is one of the big power plant in Saudi Arabia. With Boiler 2640Tph *4 Units & 971MVa*4Units Steam Turbine Generator.
Responsibilities :
•Verifying the activities and scope of EPC Contractor as per the project specifications.
•Witness Testing & Pre Commissioning of Motors (Winding Resistance, Insulation resistance, solo run test & load tests for MV & LV motors), Electrical Switchgears (13.8KV, 6.9KV & 480V). MCC & Distribution Panels (Including CT, PT, Transducers, Meters VCB, ACB, Timing test, primary & Secondary injection tests, ATS& MTS Scheme checking, Function & Interlock Test).
•Witnessing the Testing of Transformers up to 80MVA (winding Resistance, Turns ratio, Short circuit test, Tan-delta- power factor test, Vector group, Transformer auxiliary devices testing like WTI, OTI, Bocholt’s relay, CT, OLTC and SFRA Test etc)
•Contact Resistance, Insulation Resistance & Hipotential test of IPB, SPB & NSPB.
•Schematic Diagram Modification and Rewiring as per the Client’s comments
•Operation/Function check for Generator Circuit Breaker (GCB).
•Witnessing Pre-Commissioning and Commissioning Activities of MV/LV SWGRS, Transformers, Motors, MCC panels, UPS, Diesel Generators, Generators, IPB, etc.
3). Project Name : Increase Gas Handling Capacity (IGHC OIL & GAS PLANT project)
Plant Owner : Saudi Aramco KSA (GOSP 1, 2, 3 & 4) SHAYBAH
Main contractor : Samsung Engineering
One of the Leading E & I Construction Company from Italy member of Bonatti group of companies. Got this project as a sub-contractor of Samsung Engineering for all E & I works. Have completed many International and National Projects successfully.
(Website: www.carlgavazziarabia.com).
Responsibilities :
•Inspection of Erection works such as Transformers, Motors, MV/LV cables, UPS system, Batteries & its chargers, EDG, Normal & Emergency Lighting Panels, HVAC and HT/LT panels.
•Implementation of Saudi Aramco Standards & IEC standards as per the project Specifications..
•Witnessing the installation & testing of Grounding systems(earth rod resistance measurement test) & lighting systems( illumination test.).
•Witnessing the installation of cable trays & Cable pulling as per the standards.
•Witnessing of Testing and Commissioning of Fire Fighting Pump Motors, ac motors & Dry Type Molded Transformer.
•Winding resistance test, Insulation resistance test and Solo run test of MV & LV motors.
•Site Modification works depending upon the critical issues when the commissioning activities are involving with the interface systems.
•Witnessing the oil filling & testing the
•Preparing Documents, Procedures & Test Reports.
4). Project Name : Jubail Export Refinery Package 5A
Interconnecting, Flare, PCS and Electrical Systems
Plant Owner : SATORP
Main contractor : TECHNIP ITALY
Website: www.carlgavazziarabia.com).
Responsibilities :
•Implementation of JERP Standards & IEC standards as per the project Specifications.
•Witnessing the installation & testing of Cathodic protection systems
•Witnessing the installation & testing of Grounding systems(earth rod resistance measurement test) & lighting systems( illumination test.).
•Witnessing the installation of cable trays & Cable pulling as per the standards.
•Witnessing the installation & testing of Heat Tracing cables.
•Site Modification works depending upon the critical issues when the commissioning activities are involving with the interface systems.
•Preparing Documents, Procedures & Test Reports.
Manufactures of ballasts, transformers & auto transformers, Metal Halide Light & Lighting Accessories (for GE, Osram, Bajaj Electrical and Philips) An Advanced Lighting technologies Group Company-US).
Website: www.venturepower.co.in
Responsibilities :
•Check the specification of product in every stage as per the documents
•Monitor the collected data’s and given approval certificate to allow production as per procedure
•Analysis the types of causes occurred and plan how to reduce it
•Implement new suggestion to improve the quality and safety
•Implement of 5’S and ISO Documents
Maintenance of oil filling pump stations
Manufacturer, supplier and exporter of SMPS transformer, telecom magnetics, high current inductors etc
(
in
completed bachelor of engineering in electronics and communication engineering in 2008