girish girish, QA/QC ENGINEER

girish girish

QA/QC ENGINEER

CARLO GAVAZZI ARABIA

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, Electronics & Communication
Experience
17 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 4 Months

QA/QC ENGINEER at CARLO GAVAZZI ARABIA
  • Saudi Arabia - Riyadh
  • My current job since December 2016

Project Name : Riyadh Metro Project Line-3, Package-B

QA/QC ENGINEER at Saudi Electric Company (SEC)
  • Saudi Arabia
  • December 2015 to November 2016

Jeddah south thermal power plant is one of the big power plant in Saudi Arabia. With Boiler 2640Tph *4 Units & 971MVa*4Units Steam Turbine Generator.
Responsibilities :
•Verifying the activities and scope of EPC Contractor as per the project specifications.
•Witness Testing & Pre Commissioning of Motors (Winding Resistance, Insulation resistance, solo run test & load tests for MV & LV motors), Electrical Switchgears (13.8KV, 6.9KV & 480V). MCC & Distribution Panels (Including CT, PT, Transducers, Meters VCB, ACB, Timing test, primary & Secondary injection tests, ATS& MTS Scheme checking, Function & Interlock Test).
•Witnessing the Testing of Transformers up to 80MVA (winding Resistance, Turns ratio, Short circuit test, Tan-delta- power factor test, Vector group, Transformer auxiliary devices testing like WTI, OTI, Bocholt’s relay, CT, OLTC and SFRA Test etc)
•Contact Resistance, Insulation Resistance & Hipotential test of IPB, SPB & NSPB.
•Schematic Diagram Modification and Rewiring as per the Client’s comments
•Operation/Function check for Generator Circuit Breaker (GCB).
•Witnessing Pre-Commissioning and Commissioning Activities of MV/LV SWGRS, Transformers, Motors, MCC panels, UPS, Diesel Generators, Generators, IPB, etc.
3). Project Name : Increase Gas Handling Capacity (IGHC OIL & GAS PLANT project)
Plant Owner : Saudi Aramco KSA (GOSP 1, 2, 3 & 4) SHAYBAH
Main contractor : Samsung Engineering

QA/QC ENGINEER at Carlo Gavazzi Arabia.Co. Ltd (E & I Contacting Company)
  • December 2013 to December 2015

One of the Leading E & I Construction Company from Italy member of Bonatti group of companies. Got this project as a sub-contractor of Samsung Engineering for all E & I works. Have completed many International and National Projects successfully.
(Website: www.carlgavazziarabia.com).
Responsibilities :
•Inspection of Erection works such as Transformers, Motors, MV/LV cables, UPS system, Batteries & its chargers, EDG, Normal & Emergency Lighting Panels, HVAC and HT/LT panels.
•Implementation of Saudi Aramco Standards & IEC standards as per the project Specifications..
•Witnessing the installation & testing of Grounding systems(earth rod resistance measurement test) & lighting systems( illumination test.).
•Witnessing the installation of cable trays & Cable pulling as per the standards.
•Witnessing of Testing and Commissioning of Fire Fighting Pump Motors, ac motors & Dry Type Molded Transformer.
•Winding resistance test, Insulation resistance test and Solo run test of MV & LV motors.
•Site Modification works depending upon the critical issues when the commissioning activities are involving with the interface systems.
•Witnessing the oil filling & testing the
•Preparing Documents, Procedures & Test Reports.


4). Project Name : Jubail Export Refinery Package 5A
Interconnecting, Flare, PCS and Electrical Systems
Plant Owner : SATORP
Main contractor : TECHNIP ITALY

QA/QC ENGINEER at Carlo Gavazzi Arabia.Co. Ltd (E & I Contacting Company)
  • May 2012 to December 2013

Website: www.carlgavazziarabia.com).
Responsibilities :
•Implementation of JERP Standards & IEC standards as per the project Specifications.
•Witnessing the installation & testing of Cathodic protection systems
•Witnessing the installation & testing of Grounding systems(earth rod resistance measurement test) & lighting systems( illumination test.).
•Witnessing the installation of cable trays & Cable pulling as per the standards.
•Witnessing the installation & testing of Heat Tracing cables.
•Site Modification works depending upon the critical issues when the commissioning activities are involving with the interface systems.
•Preparing Documents, Procedures & Test Reports.

QA/QC Inspector at Venture Power Systems India Private Limited
  • India
  • May 2009 to May 2012

Manufactures of ballasts, transformers & auto transformers, Metal Halide Light & Lighting Accessories (for GE, Osram, Bajaj Electrical and Philips) An Advanced Lighting technologies Group Company-US).
Website: www.venturepower.co.in
Responsibilities :
•Check the specification of product in every stage as per the documents
•Monitor the collected data’s and given approval certificate to allow production as per procedure
•Analysis the types of causes occurred and plan how to reduce it
•Implement new suggestion to improve the quality and safety
•Implement of 5’S and ISO Documents

Service Engineer at Larson & Toubro Construction
  • March 2003 to February 2004

Maintenance of oil filling pump stations

Qc Inspector at Sree Vishnu Electronics
  • November 2001 to February 2003

Manufacturer, supplier and exporter of SMPS transformer, telecom magnetics, high current inductors etc

Education

Bachelor's degree, Electronics & Communication
  • at Anna University
  • January 2008

(

Bachelor's degree, Electrical & Electronics Engineering
  • January 2001

in

Bachelor's degree, Electronics and Communication Engineering
  • at Anna University
  • January 1999

completed bachelor of engineering in electronics and communication engineering in 2008

Specialties & Skills

CABLING
FILE MANAGEMENT
LIGHTING
MICROSOFT WORKS
OIL PAINTING
WEB SITE PRODUCTION