Total Years of Experience: 18 Years, 4 Months
September 2018
To Present
procurement specialist
at China Petroleum Engineering and construction corporation
Location :
United Arab Emirates - Abu Dhabi
Responsible for Procurement of Mechanical and process equipment like Gas dehydration Unit, Pressure Vessels, Compressors, Gas Sweetening Unit, Condensate deslater Unit, Instrument air compressor, piping, valves, stariners, etc
September 2015
To September 2018
Deputy Manager
at Dodsal Engineering and Construction Pte Ltd
Location :
India
Projects handling:
•End to End responsibility of Project Procurement for EPC FOR RUMAITHA/SHANAYEL FACILITIES - PHASE III.
Key Deliverables
1. Review and receipt of Engineering MR’s along with Datasheets and QA Docs requirement.
2. Float FQ’s, which includes technical and commercial requirements and guidelines to the Suppliers.
3. Follow-up for receipt of technical offers and coordinates for TQ clarifications.
4. Review of Technical offers for completeness.
5. Arrange Technical Clarifications meeting to complete Technical Evaluation.
6. Conduct commercial evaluation of offers.
7. Short-listing of suppliers for commercial evaluation.8. Negotiate Commercial Terms & Conditions & Prepare Award Recommendation.
9. Follow up for the acceptance of the PO, Manufacturing Plan & Vendor Documents.
10. Follow-up for the necessary deliverables, Drawings and documents from suppliers.
11. Continuous Monitoring of dispatches from suppliers works to Project warehouse.
12. Coordination with Logistics for timely and smooth scheduling of collection, freight forwarder.
13 Vessels, Flights, Custom clearance, Duty exemption and fast and safe delivery of goods to project warehouse.
14. Expediting from European Suppliers.
Package Involved:
Handled end to end procurement of equipment’s for project materials like Line Pipes, Non-ferrous pipes, CS Pipes, SS Pipes, Wrought Fittings, Forged Fittings, Cladded pipes and fittings, Butterfly Valves, Gate Valves, Globe valves, Ball Valves, Control Valves, Choke Valves, DBB Valves, Chemical Injection Skids, Export Pumps, Booster Pumps, Passive cooled shelters, Lighting fixtures, Cables, Junction Boxes, etc.
Vendor Mobilization co-ordination for Pre-commissioning and Commissioning of various mechanical, Electrical & Instrumentation packages like ICSS, SCMS, Transformers and OLCMS, Power Supply Skids (LV Switchgear, MV Switchgear), Fault Monitoring system (FMS), Fire alarm Control system, Fire Fighting,
Effective Field Expediting deliveries of items/packages from the various suppliers in Germany, Italy, Spain, China, South Korea, etc to meet project requirement. Procurement of project Packages like Piping Bulk, Gate valve, Ball Valve, Globe valve, Butterfly Valve, Control Valves like MOV's, On-Off Valves, Shut-down valves, from client approved suppliers across the globe Solenoid operated valves (SOV), HIPPS System, Power & distribution Transformers, etc.
•LARSEN AND TOUBRO CONSTRUCTION, AHMEDABAD as an
•End to End responsibility of Project Procurement for EPC FOR RUMAITHA/SHANAYEL FACILITIES - PHASE III.
Key Deliverables
1. Review and receipt of Engineering MR’s along with Datasheets and QA Docs requirement.
2. Float FQ’s, which includes technical and commercial requirements and guidelines to the Suppliers.
3. Follow-up for receipt of technical offers and coordinates for TQ clarifications.
4. Review of Technical offers for completeness.
5. Arrange Technical Clarifications meeting to complete Technical Evaluation.
6. Conduct commercial evaluation of offers.
7. Short-listing of suppliers for commercial evaluation.8. Negotiate Commercial Terms & Conditions & Prepare Award Recommendation.
9. Follow up for the acceptance of the PO, Manufacturing Plan & Vendor Documents.
10. Follow-up for the necessary deliverables, Drawings and documents from suppliers.
11. Continuous Monitoring of dispatches from suppliers works to Project warehouse.
12. Coordination with Logistics for timely and smooth scheduling of collection, freight forwarder.
13 Vessels, Flights, Custom clearance, Duty exemption and fast and safe delivery of goods to project warehouse.
14. Expediting from European Suppliers.
Package Involved:
Handled end to end procurement of equipment’s for project materials like Line Pipes, Non-ferrous pipes, CS Pipes, SS Pipes, Wrought Fittings, Forged Fittings, Cladded pipes and fittings, Butterfly Valves, Gate Valves, Globe valves, Ball Valves, Control Valves, Choke Valves, DBB Valves, Chemical Injection Skids, Export Pumps, Booster Pumps, Passive cooled shelters, Lighting fixtures, Cables, Junction Boxes, etc.
Vendor Mobilization co-ordination for Pre-commissioning and Commissioning of various mechanical, Electrical & Instrumentation packages like ICSS, SCMS, Transformers and OLCMS, Power Supply Skids (LV Switchgear, MV Switchgear), Fault Monitoring system (FMS), Fire alarm Control system, Fire Fighting,
Effective Field Expediting deliveries of items/packages from the various suppliers in Germany, Italy, Spain, China, South Korea, etc to meet project requirement. Procurement of project Packages like Piping Bulk, Gate valve, Ball Valve, Globe valve, Butterfly Valve, Control Valves like MOV's, On-Off Valves, Shut-down valves, from client approved suppliers across the globe Solenoid operated valves (SOV), HIPPS System, Power & distribution Transformers, etc.
•LARSEN AND TOUBRO CONSTRUCTION, AHMEDABAD as an
August 2012
To May 2015
ASSISTANT. MANAGER
at Reliance Industries
Location :
India
End to End responsibility of Project Procurement for
1.) Coal Handling Plant of 1600 TPH (Client—Hindalco) for 2x600 MW power plant, Singrauli, M.
•Material Handling System
1.) Coal Handling Plant of 1600 TPH (Client—Hindalco) for 2x600 MW power plant, Singrauli, M.
•Material Handling System
December 2009
To August 2012
Asst. Manager
at LANCO INFRATECH LIMITED
Location :
India
End to End responsibility of Project Procurement for :
1. 3 x 660 MW Koradi Thermal Power Project (Client-MAHAGENCO), Nagpur District, Maharashtra.
2. 2 x 600 MW Anuppur (Client-Moserbaer) Thermal Power Projects, Madhya Pradesh.
2. 2 x 660 MW Lanco Amarkantak Thermal Power Projects, Chhatisgarh.
3. 2 x 600 MW Lanco Babandh Power Project, (Orissa)
Key Deliverables:
•Successfully managed procurement of BOP items of Thermal Projects such as LP Piping, Power Cycle Piping, Auxiliary Steam Piping, Fabricated Structures & Components, Steel, Mechanical Erection Contracts, Misc. Pumps, EOT Cranes & Hoists, Valve Packages, DG Sets, Fire Fighting Package, HVAC, ERW Pipes, Fittings, fasteners etc.
•Significantly involved in Sourcing products & components from European and China market and developing long term relationships with prospect suppliers for future business aspects.
•Accountable for Price Negotiations, improving product quality & timely delivery of materials & equipment’s to achieve the project delivery targets.
Achievement
•Successful completion of Project Procurement for Thermal Power Project Packages within budget.
•Rewarded as an Outstanding Performer.
1. 3 x 660 MW Koradi Thermal Power Project (Client-MAHAGENCO), Nagpur District, Maharashtra.
2. 2 x 600 MW Anuppur (Client-Moserbaer) Thermal Power Projects, Madhya Pradesh.
2. 2 x 660 MW Lanco Amarkantak Thermal Power Projects, Chhatisgarh.
3. 2 x 600 MW Lanco Babandh Power Project, (Orissa)
Key Deliverables:
•Successfully managed procurement of BOP items of Thermal Projects such as LP Piping, Power Cycle Piping, Auxiliary Steam Piping, Fabricated Structures & Components, Steel, Mechanical Erection Contracts, Misc. Pumps, EOT Cranes & Hoists, Valve Packages, DG Sets, Fire Fighting Package, HVAC, ERW Pipes, Fittings, fasteners etc.
•Significantly involved in Sourcing products & components from European and China market and developing long term relationships with prospect suppliers for future business aspects.
•Accountable for Price Negotiations, improving product quality & timely delivery of materials & equipment’s to achieve the project delivery targets.
Achievement
•Successful completion of Project Procurement for Thermal Power Project Packages within budget.
•Rewarded as an Outstanding Performer.
March 2008
To December 2009
Procurement & Contracts Engineer
at PUNJ LLOYD LIMITED
Location :
India
Projects handling:
• End to End responsibility of Project Procurement for
HEERA REDEVELOPEMENT PRO-JECT -Setting up of Offshore Platform in Mumbai High Sea Region for exploration of oil & Gas. Handling System (Client- ONGC).
Key Deliverables
•Procurement of Mechanical, & Electrical materials like ERW Pipes, CS Pipes, Ball Valves, Butterfly valves, Gate Valves, Centrifugal Pumps, Actuators, Shutdown Valve, Cables, Cable Trays, Junction Boxes, Grating, Gaskets, fasteners, etc.
•Handling inviting tenders, preparing comparative statement for International suppliers
•Coordination with Project Management team for approval of drawings, QAP and vendor pre qualification documents from clients.
• Coordination with QC department for arranging inspection.
•Coordination with Third Party Inspection agencies.
•Liaison with finance department for timely payment of bills.
•Conciliation of all supply invoices with payments to finance department.
•Complying the punch points to hand over the projects.
Involved in Bidding of various Offshore Projects like NHRC, MHN, MHN PIPELINE, .
This involves to get the Budgetary quote from vendors for the Packages like Piping, Pumps, Compressors, Electrical, Instrumentation, (Packages are Gas dehydration Unit, Fuel Gas conditioning Skid, Fuel & Gas Detection System, HP & LP Flare System, Skimmer Vessels, Waste heat recovery unit, Shutdown panel, HP and LP Separators, Multiphase flow meter, Emergency generator etc.
• End to End responsibility of Project Procurement for
HEERA REDEVELOPEMENT PRO-JECT -Setting up of Offshore Platform in Mumbai High Sea Region for exploration of oil & Gas. Handling System (Client- ONGC).
Key Deliverables
•Procurement of Mechanical, & Electrical materials like ERW Pipes, CS Pipes, Ball Valves, Butterfly valves, Gate Valves, Centrifugal Pumps, Actuators, Shutdown Valve, Cables, Cable Trays, Junction Boxes, Grating, Gaskets, fasteners, etc.
•Handling inviting tenders, preparing comparative statement for International suppliers
•Coordination with Project Management team for approval of drawings, QAP and vendor pre qualification documents from clients.
• Coordination with QC department for arranging inspection.
•Coordination with Third Party Inspection agencies.
•Liaison with finance department for timely payment of bills.
•Conciliation of all supply invoices with payments to finance department.
•Complying the punch points to hand over the projects.
Involved in Bidding of various Offshore Projects like NHRC, MHN, MHN PIPELINE, .
This involves to get the Budgetary quote from vendors for the Packages like Piping, Pumps, Compressors, Electrical, Instrumentation, (Packages are Gas dehydration Unit, Fuel Gas conditioning Skid, Fuel & Gas Detection System, HP & LP Flare System, Skimmer Vessels, Waste heat recovery unit, Shutdown panel, HP and LP Separators, Multiphase flow meter, Emergency generator etc.
March 2007
To March 2008
Procurement & Contracts Engineer
at RELIANCE PETROLEUM LIMITED
Location :
India
Key Deliverables
Procurement of Mechanical Items like Pipes, Plates, Fittings, Valves, Fasteners, Gaskets, Insulation Material for Piping, etc
Procurement of Mechanical Items like Pipes, Plates, Fittings, Valves, Fasteners, Gaskets, Insulation Material for Piping, etc
August 2005
To February 2007
at PUNJ LLOYD LIMITED
Location :
India
Accountable for Site fabrication, material handling, store management for LNG Terminal Re-gasification project for Dabhol Power Plant
Share on Facebook
Share on Twitter
Share Via Email