جوفيند جوفيند, Senior Engineer

جوفيند جوفيند

Senior Engineer

INDIAN RAILWAYS-Railway Coach MaintenanceShop

البلد
الهند
التعليم
الثانوية العامة أو ما يعادلها,
الخبرات
33 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :33 years, 0 أشهر

Senior Engineer في INDIAN RAILWAYS-Railway Coach MaintenanceShop
  • الهند
  • أشغل هذه الوظيفة منذ أكتوبر 1997

- Production, Fabrication and Quality Control
• Working with one of the world’s largest railway networking system, efficiently engaged in Locomotives and Coach
Production facilities.
• Working with the aim of Safety and comfort for the General Public is the prime responsibility of this department.
• Important role at different stages like production and inspection of mass components used for rebuilding of passengers
coaching vehicle (PCV), Bogies, Rail Tanks, Wagons, Pipelines, rotatic / static equipments.
• Other activities related to welding, fabrication, manufacturing, inspection according to international codes and
specifications also being part of the role.
• Certified ASNT Level-II (UT, MPT, LPT, RTFI), and looking after material testing, inspection of weldments, railway bogie
frames structure, storage tanks, piping system, cranes, shell subassemblies, side-walls, End-welments, including complete
responsibility of production and quality control Deptt

Quality auditor في INDIAN RAILWAYS-Railway Coach MaintenanceShop
  • أشغل هذه الوظيفة منذ أكتوبر 1997

Modification and Cost & Revenue Saving • Restructured the plant Layout arrangement of suspension
system (As previously the plant layout of suspension
system was not proper and transportation cost from one
deptt. to other was very high and time consuming and
lots of labour loss). By proper layout and
recommissioning of M/c's, it improved transportation
system, and helped in time saving.
• Provision of Bio-Toilet system in fast passanger trains like
Rajdhani, Shatabdi and Air Conditioned Coaches.
• Safety wire rope arrangements for Break Beam in Braking
system.
• Manufacturing of componsating rings from scrap (Bolster
spring coupler) which was previously manufactured from
2500 x 1250 x 5 mm plates - lots of revenue saved by
utilizing scrap by this method.
Welding and Fabrication • Replacement of orthodox oil cooled welding machines to
most modern invertor based welding plants. Latest IGBT
technology, portable and light weight with the help of
commission of such welding plants, power saving up to
50%.
• Commission of shot blasting plant instead of old sand
blasting for cleaning of components, environmental
friendly, less hazardous to the health of workers and safe.
• Transfer from SMAW M/cs (Shielded metal arc welding)
to advance MIG/MAG welding plant for continuous
welding of large components. It drastically reduced the
consumption of electrodes, stub - end losses reduced
very much and cost saved. Quality of weld improved very
much, weld defects also minimized.
Inspection and Quality Control • Prepared WPS (Welding Procedure Specification) / PQR
for most of the weldments like Bolster, shell, storage
tank, static / rotating equipments with the help of
preparation of above procedures properties improved
and by application of best procedure cost is reduced very
much.
• Standard gauges made in such a way to inspect joint fit
up before welding. During welding and structures in
progress and on completed jobs.
• Quality Management System (QMS), Quality Plans formed
for various processes .
• Concept of three C's (Cost, Customer & Change) is
adopted.
Training • Organized skill Development Programmes in various
areas.
• Introduced Welders qualification System up to AR2
• (Acceptance Requirement Level-2) as per ASME Section -
IX. Previously welders were categorized in Indian Standards
System in groups A, B, C.
• Interacted with external training institute like -
WRI, RWTI to uplift the knowledge of staff in welding,
quality improvement, safety.
ISO-9001-2008
ISO-14000
ISO-3834
• Introduction Certification, Implementation of ISO-
90012008, ISO-14001. Working as a

Production Engineer في Emirates steel pipes
  • الإمارات العربية المتحدة - دبي
  • أغسطس 1995 إلى سبتمبر 1997

As a production engineer manufacturing of ERW Galvanized and Black Steel pipes from 1/2 " to 8" confirming to various international standards.

Production Engineer في Projects and supplies
  • الإمارات العربية المتحدة - دبي
  • يناير 1993 إلى يناير 1994

Responsible for production of asbestos and aluminium tiles for the false ceilling of different assigned projects. To procure
raw material for production of required tiles.
• Heat treatment of tile, colour coating as desired. Packing and despatching to various clients, maintenance of various Press
machines, ovens, tools and Dies fork lifts

Site Engineer في Aseel Construction Services
  • الإمارات العربية المتحدة - الشارقة
  • يناير 1991 إلى يناير 1992
Mechanical Production Engineer في Shree Cement LTD
  • الهند - جايبور
  • يناير 1990 إلى يناير 1991

Project Enginner-Construction
• Projects - Installation & Commissioning of Different Conveyors for transportation of raw material to finish product.
• Fabrication of Different types of belt conveyors, Screw conveyors for the transportation of raw material to finished product.
Different Conveyors & their maintenance.
• Preventive maintenance & lubrication of motors, Pumps & pulleys (with team of maintenance staff), Good Liaison with staff
&

  • يناير 1989 إلى يناير 1990

الخلفية التعليمية

الثانوية العامة أو ما يعادلها,
  • في Corrosions repairs & its prevention
  • يناير 2010

Accident Control & Management) •

الثانوية العامة أو ما يعادلها,
  • في Corrosions repairs & its prevention
  • يناير 2009

Seminar on Heat Treatment by center for advance maintenance technology, Gwalior

الثانوية العامة أو ما يعادلها,
  • في NDTLPTRTFITrinity NDT Engineerswelding Research institute
  • يناير 2008

courses: TRAINING & CERTIFICATIONS •

الثانوية العامة أو ما يعادلها,
  • في ICF
  • يناير 2007

courses: Welding Process & Inspection procedures, WPS, PQR

ماجستير, Production & Mktg
  • في MDS Universityof Engineers
  • يناير 1989

Associate member of the Indian Institute of welding Kolkata. IIW. Certificate No-AM/R-5372 1997

بكالوريوس, Mech. Engg
  • في Govt. Polytechnic College
  • يناير 1985

الثانوية العامة أو ما يعادلها, Mech. Engg
  • في Rajasthan Board
  • يناير 1981

Science, Maths

Specialties & Skills

Inspection
Manufacturing
Welding
Team Management
COACHING
CONCEPT DEVELOPMENT
ISO 9000
LAYOUT DESIGN
LEADERSHIP
MECHANICAL
NETWORKING

اللغات

الانجليزية
متمرّس
الهندية
متمرّس