govind assudani, Senior Engineer

govind assudani

Senior Engineer

INDIAN RAILWAYS-Railway Coach MaintenanceShop

Lieu
Inde
Éducation
Etudes secondaires ou équivalent,
Expérience
33 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :33 years, 0 Mois

Senior Engineer à INDIAN RAILWAYS-Railway Coach MaintenanceShop
  • Inde
  • Je travaille ici depuis octobre 1997

- Production, Fabrication and Quality Control
• Working with one of the world’s largest railway networking system, efficiently engaged in Locomotives and Coach
Production facilities.
• Working with the aim of Safety and comfort for the General Public is the prime responsibility of this department.
• Important role at different stages like production and inspection of mass components used for rebuilding of passengers
coaching vehicle (PCV), Bogies, Rail Tanks, Wagons, Pipelines, rotatic / static equipments.
• Other activities related to welding, fabrication, manufacturing, inspection according to international codes and
specifications also being part of the role.
• Certified ASNT Level-II (UT, MPT, LPT, RTFI), and looking after material testing, inspection of weldments, railway bogie
frames structure, storage tanks, piping system, cranes, shell subassemblies, side-walls, End-welments, including complete
responsibility of production and quality control Deptt

Quality auditor à INDIAN RAILWAYS-Railway Coach MaintenanceShop
  • Je travaille ici depuis octobre 1997

Modification and Cost & Revenue Saving • Restructured the plant Layout arrangement of suspension
system (As previously the plant layout of suspension
system was not proper and transportation cost from one
deptt. to other was very high and time consuming and
lots of labour loss). By proper layout and
recommissioning of M/c's, it improved transportation
system, and helped in time saving.
• Provision of Bio-Toilet system in fast passanger trains like
Rajdhani, Shatabdi and Air Conditioned Coaches.
• Safety wire rope arrangements for Break Beam in Braking
system.
• Manufacturing of componsating rings from scrap (Bolster
spring coupler) which was previously manufactured from
2500 x 1250 x 5 mm plates - lots of revenue saved by
utilizing scrap by this method.
Welding and Fabrication • Replacement of orthodox oil cooled welding machines to
most modern invertor based welding plants. Latest IGBT
technology, portable and light weight with the help of
commission of such welding plants, power saving up to
50%.
• Commission of shot blasting plant instead of old sand
blasting for cleaning of components, environmental
friendly, less hazardous to the health of workers and safe.
• Transfer from SMAW M/cs (Shielded metal arc welding)
to advance MIG/MAG welding plant for continuous
welding of large components. It drastically reduced the
consumption of electrodes, stub - end losses reduced
very much and cost saved. Quality of weld improved very
much, weld defects also minimized.
Inspection and Quality Control • Prepared WPS (Welding Procedure Specification) / PQR
for most of the weldments like Bolster, shell, storage
tank, static / rotating equipments with the help of
preparation of above procedures properties improved
and by application of best procedure cost is reduced very
much.
• Standard gauges made in such a way to inspect joint fit
up before welding. During welding and structures in
progress and on completed jobs.
• Quality Management System (QMS), Quality Plans formed
for various processes .
• Concept of three C's (Cost, Customer & Change) is
adopted.
Training • Organized skill Development Programmes in various
areas.
• Introduced Welders qualification System up to AR2
• (Acceptance Requirement Level-2) as per ASME Section -
IX. Previously welders were categorized in Indian Standards
System in groups A, B, C.
• Interacted with external training institute like -
WRI, RWTI to uplift the knowledge of staff in welding,
quality improvement, safety.
ISO-9001-2008
ISO-14000
ISO-3834
• Introduction Certification, Implementation of ISO-
90012008, ISO-14001. Working as a

Production Engineer à Emirates steel pipes
  • Émirats Arabes Unis - Dubaï
  • août 1995 à septembre 1997

As a production engineer manufacturing of ERW Galvanized and Black Steel pipes from 1/2 " to 8" confirming to various international standards.

Production Engineer à Projects and supplies
  • Émirats Arabes Unis - Dubaï
  • janvier 1993 à janvier 1994

Responsible for production of asbestos and aluminium tiles for the false ceilling of different assigned projects. To procure
raw material for production of required tiles.
• Heat treatment of tile, colour coating as desired. Packing and despatching to various clients, maintenance of various Press
machines, ovens, tools and Dies fork lifts

Site Engineer à Aseel Construction Services
  • Émirats Arabes Unis - Sharjah
  • janvier 1991 à janvier 1992
Mechanical Production Engineer à Shree Cement LTD
  • Inde - Jaipur
  • janvier 1990 à janvier 1991

Project Enginner-Construction
• Projects - Installation & Commissioning of Different Conveyors for transportation of raw material to finish product.
• Fabrication of Different types of belt conveyors, Screw conveyors for the transportation of raw material to finished product.
Different Conveyors & their maintenance.
• Preventive maintenance & lubrication of motors, Pumps & pulleys (with team of maintenance staff), Good Liaison with staff
&

  • janvier 1989 à janvier 1990

Éducation

Etudes secondaires ou équivalent,
  • à Corrosions repairs & its prevention
  • janvier 2010

Accident Control & Management) •

Etudes secondaires ou équivalent,
  • à Corrosions repairs & its prevention
  • janvier 2009

Seminar on Heat Treatment by center for advance maintenance technology, Gwalior

Etudes secondaires ou équivalent,
  • à NDTLPTRTFITrinity NDT Engineerswelding Research institute
  • janvier 2008

courses: TRAINING & CERTIFICATIONS •

Etudes secondaires ou équivalent,
  • à ICF
  • janvier 2007

courses: Welding Process & Inspection procedures, WPS, PQR

Master, Production & Mktg
  • à MDS Universityof Engineers
  • janvier 1989

Associate member of the Indian Institute of welding Kolkata. IIW. Certificate No-AM/R-5372 1997

Baccalauréat, Mech. Engg
  • à Govt. Polytechnic College
  • janvier 1985

Etudes secondaires ou équivalent, Mech. Engg
  • à Rajasthan Board
  • janvier 1981

Science, Maths

Specialties & Skills

Inspection
Manufacturing
Welding
Team Management
COACHING
CONCEPT DEVELOPMENT
ISO 9000
LAYOUT DESIGN
LEADERSHIP
MECHANICAL
NETWORKING

Langues

Anglais
Expert
Hindi
Expert