Key projects:

Handled following projects as Project Engineering Manager.

900 MWe combined cycle power plant (3GT+1ST), Techgen, Mexico - Balance of Plant (EPC), 50, 000 Mhrs. Power island by GE (EPC). Total project value approx. $ 1.0 billion.
LNG re-gasification terminal, 2 x 190, 000 M3 TANK, 10 BCM/Year, Dunkerque LNG, France - (EPC LSTK), 52, 000 Mhrs.
Mochovce Nuclear Power Plant, Conventional Island (Unit 3 & 4) and Auxiliary Nuclear Systems, Slovakia - Enel (Slovenske Elektrarne) - (Engineering), 120, 000 Mhrs.

Key accomplishments:

 Final handover audit report closure of Yanbu PDS, SPPID & In-tools databases
The activity involved resolution of errors/inconsistencies in PDS database before the final
handover to the client. It involved all the engineering disciplines and around 2000 open points with many points involving more than one discipline. Initially there was no leader appointed for this activity and all the engineering disciplines were working in isolation without any interfacing and real time progress monitoring which resulted in a lot of chaos and vague accountability.
I created a real time progress monitoring spreadsheet (shared by all the engineering disciplines) with clear remarks/actions against each point. With this we were able to close this activity within a very challenging schedule which was initially considered as unrealistic.
 I created a document based real time progress monitoring system which enabled project engineer/lead engineer to review where the documents were stuck up. This helped us to take proactive measures to mitigate the associated risks.
 Enel, Mochovce Nuclear Power Plant (3D PDMS)
For each plant building, different coordinate systems (with different orientations) were followed by the client, with specific requirement of locating the load points (insert plates) from the nearest grid. There were more than 11000 load points.
Since PDMS model and setup was received from the Client, customization of coordinate system was not possible. This forced the users to convert the coordinates manually as per client requirement which created a risk of human error and considerably slowed down the work process. I created an MS Excel spreadsheet which used report from the 3D PDMS model as an input and directly converted the coordinates to the format requested by the client by using predefined formulae. This totally eliminated the possibility of human error and the requirement of
rechecking coordinate values which resulted in faster turnaround and resultant saving more than 1000 man hours.

Responsibilities:

Liaise with client on the technical issues.
Lead engineering disciplines involved in various projects within India office and coordination with other Techint offices involved in those projects.
Interface management between engineering disciplines, vendors and subcontractors.
Client/process licensor/vendor liaison and review of client/process licenser/vendor documentation for technical acceptability.
To ensure safety since the beginning and in each stage of the Project. To ensure quality assurance
To ensure that the project is executed on as per the schedule on time
To ensure that the cost is within the budget, to maintain rework register and to manage scope change requests.

Deputy Manager à Techint India Pvt. Ltd.
  • Inde - Mumbai
  • avril 2013 à décembre 2014

Responsibilities:

Same as above.

Asst. Manager Project Engineering à Techint India Pvt. Ltd.
  • Inde - Mumbai
  • janvier 2013 à mars 2013

Responsibilities:

Same as above

Principal Engineer à Techint India Pvt. Ltd
  • Inde - Mumbai
  • juin 2010 à décembre 2012

Key accomplishments:

 I designed a customized report which resulted in 90% reduction in the time required for checking of Piping MTO for proposals, this was implemented in all the future proposals as well.
 As a piping lead engineer I successfully led teams of layout designers and engineers, stress engineers, support specialist, material engineers etc. for various proposals and projects.
 In Techint Milan office I worked on UMG methanol FEED, I was responsible for engineering coordination between Techint Milan and Mumbai office for this project. Also for Yanbu project in Milan, I was responsible for basic piping studies of jacketed liquid Sulphur lines to finalize the pastillator building layout arrangement.

Responsibilities:

Coordination with other disciplines.
To provide technical guidance and control activities of piping group for the assigned project.
To ensure timely execution of the design and requisitioning within the scope of responsibility assigned by the group manager.
To ensure quality of deliverables by adhering to work instructions of the dept./group and taking into account any specific contractual requirements.

Sr. Engineer à Engineering & Designs Tecnimont ICB Pvt. Ltd
  • Inde - Mumbai
  • octobre 2009 à mai 2010

Key accomplishments:

 I prepared piping studies for the Plot Determining (Process & Stress Critical) lines in Ammonia plant for Jose Fertilizers, Venezuela FEED project. This is very critical for correct development of overall plot plan to avoid major changes during the detailed engineering phase which can lead to major impact on cost and schedule of the project.
 I led a team of engineers and designers for the activity of Civil/Structural information coordination on Shah Gas proposal. This involved coordination of the information that was clearly indicated in the documents/drawings as well as identification of requirement of the auxiliary structures/access platforms that were not shown in the documents/drawings and to provide the associated information to the Civil/Structural department. This was critical for cost estimation purpose.

Responsibilities:

Same as above.

Sr. Design Engineer à Jacobs Engineering India Pvt. Ltd
  • Inde - Mumbai
  • mars 2006 à septembre 2009

Key accomplishments:

 As lead piping engineer with Jacobs Manchester office, I successfully completed Novartis Grimsby B150 SPP 100 Expansion project (total project value £ 150 million).
This project won “Joseph J. Jacobs Master Builder Award” (an internal program that recognizes the best of the best among Jacobs projects all over the world) for year 2008, competing with more than 2000 other projects from various Jacobs offices. This project was completed from concept to production of first batch within 17 months after start of the initial design versus a standard schedule duration of 26 months. Jacobs earned all the incentives for schedule adherence and
helped in total capital cost saving of £ 2.27 million.

Responsibilities:

Same as above.

Designer Mechanical/Piping à WorleyParsons Oman Engg. Llc
  • Oman - Muscat
  • juin 2004 à février 2006

Worked at site design office of WorleyParsons group (deputed to PDO - Petroleum Development Oman, Fahud) in North Oman onshore oil and gas fields.

Key accomplishments:

 I independently prepared design package for Replacement of 24”/20” on plot piping connected to
6 gigantic floating roof dehydration tanks \[capacity 8586 m3 (each) and size 28 m dia. x 14 m ht.\] with new internally FBE coated piping at the Main Line Pumping Station (MLPS) Fahud with Petroleum Development Oman (PDO) strategy of phase wise shut down, construction feasibility, FBE coating vendor limitations and layout constraint within a tight schedule. MLPS is critically important for operation of entire Fahud oil-field. It covers a total land area of 11, 580 km2 and consists of two operating oil fields and 240 producing wells. The oil-field produces on average 14, 670 m3/d of crude oil and 5, 007, 000 Sm3 /d of associated gas. The oil-field accounts for about 10.9 % of PDO's total crude oil production.

Responsibilities:

Design of oil & gas piping - on plot (integrity) and off-plot (flow line) including preparation of construction scope of work, document control index, key plans, equipment layouts, piping layouts, piping isometrics with B.O.M. as per PDO standards.

Design Engineer à Jacobs H&G Pvt. Ltd
  • Inde - Mumbai
  • décembre 2001 à juin 2004

Key accomplishments:

 Worked at Jacobs Engineering's Houston USA office on Nova BEAM project at Nova Bayport plant for the Pre-TAR site activities in Ethyl Benzene & Styrene Monomer plants.
 Worked as Team Leader for Bulk MTO (Valves & SM Items) activity for MHI SMAG-II (MMA)
project.
I conceptualized and architected a software for preparation of valve and piping specialty item MTO. With this software we successfully handled MTO of more than 13500 valves of various types with maximum size up to 64” and around 3000 piping specialty items. This software was developed in just 5 days to overcome a seemingly impossible target. It saved a rework of around 2100 man hours.
The development team consisted of just two members wherein I worked as the technical expert defining the concept, requirements, program structure, database structure and functioning/logic of the software and a software programmer who developed the required software code, front end and the database.
 Successfully completed detail engineering of the following projects for BP Grangemouth, Green Oil Extraction Plant and Jetty piping with hose handling arrangement.

Responsibilities:

Worked as Lead Piping Engineer for Jacobs Mumbai piping group for BP Grangemouth work share
project with Jacobs Engineering Grangemouth UK. (Rebis Autoplant).
Worked as Area Lead for detail design of Ethanol Storage in Pharmaceutical Plant B120 with interchangeable manifolds, for Novartis, Manchester, U.K. (Rebis Autoplant)
To assist senior members of the department and perform supervision activities.
Client and Vendor document review for technical acceptability.
Coordination with other engineering disciplines and provide assistance as required.
Administration of Rebis - AutoPLANT 3-D Plant Designing Software.
Model Review & Clash check using Rebis Explorer ID. Preparation of 3-D Models using Rebis Auto PLANT Ver. 2.01 - Piping module.
Preparation of piping specifications for Auto plant in Rebis Specgen module.

Design Officer à Ion Exchange (I) Ltd
  • Inde - Navi Mumbai
  • août 1998 à décembre 2001

Key accomplishments:

 Successfully completed detail engineering of four de-mineralization (DM) plants (1 in Indonesia and 3 in India).
 Worked as a key member in standardization program for DM plant units.

Responsibilities:

Detail engineering of DM plants using Rebis AutoPLANT Equipment, Piping, Multisteel & Specgen modules. Isometric extraction using Isogen module.
Preparation of PFDs, HFDs, P & ID's, plot plans, equipment layouts, piping layouts etc. for ETP, STP & WTP.
Piping & pipe supports BOM estimation & Calculation.
To co-ordinate design work with Clients & Vendors.
To look after Auto CAD set-up in the organization. Auto CAD customization

Senior CAD D'man à Kempro Engineers
  • Inde - Thana
  • septembre 1995 à juillet 1998

Key accomplishments:

 Successfully completed detail engineering of Kuwait National Petroleum company's ADIP, MTBE, ALKYLATION & LPG Merox units - consulting engineers- Mitsui Engineering & Shipbuilding (JAPAN). This project involved preparation of 550 piping GA drawings. This project was developed entirely in AutoCAD 2D.
 I developed a customized menu for AutoCAD which enabled insertion of piping symbols for drawing piping layouts. This was used for KNPC refinery project and our client Mitsui Engineering & Shipbuilding used this customized menu in MES Japan office as well. This menu helped to considerably speed up the piping drafting activity.

Responsibilities:

Client liaison, preparation of equipment layouts, piping layouts, piping isometrics with B.O.M., pipe support layouts etc. Interface between CAD & other engineering departments.
To look after Auto CAD set-up. Auto CAD customization.

Éducation

Baccalauréat, Piping Design and Engineering
  • à MIT
  • janvier 1999

in

Baccalauréat, Mechanical Engineering
  • à K. J. Somaiya PolytechnicK. J. Somaiya I. T. I. Mumbai
  • janvier 1998

Certification: CITB Site Safety Plus, SMSTS, Registration No. 5511735, Exp. 30/09/2020

Specialties & Skills

AutoCAD
Interdisciplinary coordination
Ability to explain design ideas clearly
Process plant and piping design
Project Engineering
Autoplant 3D
Navisworks
AUTOCAD
CUSTOMER RELATIONS
ENGINEERING
LAYOUT DESIGN
MICROSOFT OFFICE
MICROSOFT WINDOWS 2000

Langues

Anglais
Expert
Hindi
Expert
Marathi
Langue Maternelle
Italien
Débutant

Adhésions

The Institution of Engineering anf Technology (IET), UK
  • MIET, Membership Number: 1100418986
  • October 2015
Project Management Institute (PMI), USA
  • Membership Number: 4255057
  • January 2016

Formation et Diplômes

CITB SMSTS (Site Manager Safety Training Scheme), Registration No. 5511735 (Certificat)
Date de la formation:
September 2015
Valide jusqu'à:
September 2020