QAFCO (Sub-Contractor)
Qcon Engineering W.L.L
Total years of experience :17 years, 11 Months
3.2 April 2012: QAFCO (Sub-Contractor)
To HSE Supervisor
June 2012 a. Name of Company: Qcon Engineering W.L.L
b. Address: St.48 Gate27 Salwa ll Industrial Area
c. Project Involved: Installation of Three (3) Ten Toner
A/C Unit inside Energized Sub-
Station.
d. Brief scope of works:
- Monitor the construction activities undertaken by Qcon Electrical department.
- Ensure PTW (Permit to Work) was signed and concurred by other area
supervisor as well the operator to ensure proper coordination with the operations.
-Checked the possible hazard in the workplace and discussed in the TBT
(toolbox talk meeting) prior to start work.
.
3.7 February 2000 Republic of Georgia to Safety Officer
March 2002 a. Name of Company: Spie Capag / Joint Ventures
Tbilisi, Georgia
b. Address: AGT Pipeline Project
c. Project Involved: d. Brief scope of Works: - Supervised sub-contractors safety supervisor in my area
- Conduct joint safety inspection
- Participate on management work site safety patrol
- Responsible on daily HSE accomplishment report integrating Sub-contractor safety reports
- Investigate incident case
- Participate on sub-contractors HSE meetings
- Brief HSE manager relative the status of my assigned area
3.8 April 1994 Philippines to Safety Engineer
November 1995 a. Name of Company: DMCI
b. Address: Makati City Philippines
c. Project involved: MLRT-2 Project
3.9 January 1981: Philippines
To Fabrication Foreman
August 1986 a. Name of Company: Franciscan Engineering Works
b. Address: 1435 Sucat Road, Paranaque City,
Philippines.