Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Hafiz  Abdul Wajid, Electrical Technician II

Hafiz Abdul Wajid

Electrical Technician II·PIOGCL (Formerly Eni Pakistan Ltd) Bhit Gas Field

Pakistan

Higher diploma, B. Tech (Bachelor of Technology) Electrical

Work experience

Total years of experience: 16 years, 0 months

Electrical Technician II

July 2013 - Present

PIOGCL (Formerly Eni Pakistan Ltd) Bhit Gas Field

Sehwan, Pakistan

I found this job using Bayt.com

July 2013 - Present

RESPONSIBILITIES: I take a part of maintenance team, as an Sr. Electrical Technician/Supervisor now is responsible to carry out all activities under HSE compliance & SOP, s to ensure smooth operation & prevent downtime. Testing, commissioning, startup, PM, CM & faults finding of electrical systems & equipment's of plant, which includes but not limiting to the following:
 Gas Turbines 3 x 23.5 MW Rolls Royce (Generator-Peebles) at Plant Bhit Gas Field.
 Gas Engine Units 10 x 664 KW GE-Jenbacher (Generator-Stamford) at Wellheads for FEC.
 Emergency Diesel Generators 67 KVA to 1.8 MW (CAT, Cummins, Volvo).
 Switchgears: 11KV, 3.3KV & 415V (Areva) and 415V MCC (ABB).
 Breakers: Alstom VCB Trolley Type for 11KV Bus 3150A, Alstom Vacuum Contactors Trolley Type for 3.3KV Bus 3000A, ABB & Alstom ACB Draw able Type for MCC 415V 2500A.
 Protection Relays: For Generator Protection SR-489GE (Envervista), Feeders Management Relay P141 MICOM, Motor Management Relay P241 MICOM, Differential Relay MCAG34 AREVA, Motor Protection Relay Gemstart AREVA, E3Plus AB & UMC-22FBP ABB.

 Transformer: Siemens ONAN Type 11/3.3KV 8MVA, 11/.415KV 2MVA, 3.3/.415KV 1.6MVA.
 MV Motors: ABB 6.2 MW at 11 KV, Schorch 970 KW & ABB 315 KW at 3.3 KV.
 LV Motors: WEG, ABB, SIEMENS, Up to 250 KW at 415V and overhauling of LV Motors.
 VFDs & Soft Starter (Allen Bradley & ABB).
 RTU (Remote Terminal Unit) for communication interfacing with DCS (Areva).
 PLC (Allen Bradley Studio 5000, B&R Automation).
 UPS: GUTOR UPS 60KVA & 40KVA for plant and CONVEL UPS 7.5KVA for wellheads.
 DCP: GUTOR DCP 21.8 KVA & 17.4 KVA (for Substation 110V DC Power).
 Batteries: Lead Acid, Nickle Cadmium, Up to 200Ah, for UPS, DCP & Different Engines.

 Fuel Has Heater: 35KW/415V fuel gas heater thyristor control panel (EXHEAT).
 Lighting System: Lighting fixture emergency/non-emergency 2x18W/2x36W & Floodlights.
 Cables (Testing, Laying, Glanding, Connection & Disconnection of power and control cable).
 Workshop Equipment’s: Welding machine, Lath Machine, Drilling & Cutting Machine, etc.
 PA System.
 Physical Condition Monitoring of Electrical Equipment’s (I.e. Motors, Generators, Transformers, Switchgears, UPS & Other electrical equipment’s) through checklist job plans.
 Performed Relays Testing (Micom P241, P141 & MCAG-34) in Coordination to Schneider Electric Pakistan in Annual turnaround of Plant, using CMC-356 OMICRON.
 Performed Breaker Testing (Alstom VCB Trolley Type 11KV, 3150A) in Coordination to Schneider Electric Pakistan in Annual turnaround of Plant, using CPC-100 OMICRON, VIDAR and Circuit Breaker Analyzer Test set (GKC-H).
 Dielectric Testing of Transformer oil by utilizing dielectric tester, further coordinating with Vendor “Prescon” for DGA analysis from Doble USA.
 Participated in commissioning of Booster Compressor (GE SUPERIOR Gas Engine 12SGTD & Camron Compressor) at wellheads, Powered by Brushless Alternator to UCP.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Electrical Technician

July 2012 - June 2013

SIEMENS Pakistan Ltd (Eni- Bhit O & M Project)

Sehwan, Pakistan

July 2012 - June 2013

Participated in installation & commissioning of GE Jenbacher Engine JGS312 664 KW Generator-Stamford, GE Switchgear-415V 1200A, MCC-415V ABB, UPS 7.5KVA CONVEL for FEC (front-end compression) CAT Engine 3612 & Arial Compressor JG4 at Wellheads.
Carried out small project like Installation of Solar Energy Systems 2.4-KW, 700 Ah Battery bank (24VDC) providing power supply to Wellhead Hydraulic Control Panel (Tyco, INTECH).
Participated in PM CM & ensure reliability of wellhead compression & Utility smooth operation

Company industry:
Oil & Gas
Job role:
Oil and Gas

Electrical Technician

May 2009 - May 2011

Engro Fertilizer Ltd

Pakistan

May 2009 - May 2011

RESPONSIBILITIES: Worked as an electrical team member, Report to electrical engineer.
 participated in PM, CM and modification of electrical system & equipment’s of plant.
 Troubleshooting of electrical malfunction or failure of operational equipment’s such as breakers, transformer, generator, motors, relays, control & monitoring devices, other electrical equipment & taking corrective action according SOP to prevent downtime.
 Data up keeping in CMMS MAXIMO base system.
 Ensure the reliability of Ammonia, Urea, Bagging system & Utilities smooth operation.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Maintenance, Repair, and Technician

Education

The Islamia University Of Bahawalpur

January 2012

January 2012

Higher diploma, B. Tech (Bachelor of Technology) Electrical

Pakistan

GPA (percentage): 70%

GPA (percentage): 70%

Bachelor of Technology in Electrical Field
View attachment

Govt College of Technology Rahim Yar Khan

September 2008

September 2008

Diploma, Electrical Technology

Pakistan

GPA (percentage): 79%

GPA (percentage): 79%

Diploma of Associate Engineer in Electrical Technology
View attachment

Govt High School Amin Garh Rahim Yar Khan

March 2005

March 2005

High school or equivalent, Science Subject

Pakistan

GPA (percentage): 80%

GPA (percentage): 80%

Math, Bio , Chemistry and Physic
View attachment

Skills

Relays
Expert
Relays
Expert
Preventive Maintenance
Expert
Preventive Maintenance
Expert
Protection
Expert
Protection
Expert
Testing
Expert
Testing
Expert
Motors
Expert
Motors
Expert
Solid Communication, problem solving and Maintenance, Repair, Modification, Installation of EE
Expert
Solid Communication, problem solving and Maintenance, Repair, Modification, Installation of EE
Expert
Relays
Expert
Relays
Expert
Preventive Maintenance
Expert
Preventive Maintenance
Expert
Protection
Expert
Protection
Expert
Testing
Expert
Testing
Expert
Motors
Expert
Motors
Expert

Languages

Urdu
Expert
English
Intermediate

Training and Certifications

Training
Advance First Aid Course
Aga Khan University Hospital
Jul 2017
Show credentials
GE Jenbacher Gas Engine
Orient Energy Systems Ltd
Jun 2014
Show credentials
Electrical Safety
SGS Pakistan Ltd
Dec 2012
Show credentials
Fire Fighting
Fauji Fertilizer Ltd
Dec 2021
Show credentials
First Aid
AKUH

Hobbies

  • Reading, Playing Cricket and Table Tennis