SCADA PLANT OPERATOR at waste water treatment plant and Pumping station / water network operator.
AQUA TRANSFER TECHNOLOGY WLL, BAHRAIN
مجموع سنوات الخبرة :6 years, 8 أشهر
Operating Lifting and TSE pumping station for transmission and distribution of water network system 200 MLD- Operated multi stage/single stage Centrifugal pumps of 10-12MGD- Monitoring and control Surge vessel Pressure & level, Network pressure & flow, Reservoir level. Start up/shutdown pumping station- Operating Chlorination plant, balancing flow. Follow HSE policies & plant SOP.
ADSSC at Mafraq Waste water treatment Work- Daily Inflow- 650 MLD Approx- Intake-260MLD.Abu Dhabi UAE- Inflow Distribution chamber-primary and secondary settling chamber, Activated sludge Bio reactor,
Effluent storage reservoir, filtration& pre/post Disinfection, TSE reservoir, irrigation pumping station, Sludge thickening, Anaerobic digester, Gas holding tank, gas burner.
Doha west sewage treatment plant operation & maintenance project for client ASHGHAL - 185MLD. QATAR.
Handled capacity-180MLD equipment handled__ Strom storage, pretreatment, Biological, Tertiary treatment, Disinfection and ultra filtration (ZEE WEED 1000 V3), Treated Secondary effluent pumping station-