Hamdy Alqatrany, Senior Str. Designer & Area Resident Engineer

Hamdy Alqatrany

Senior Str. Designer & Area Resident Engineer

Jouzy Consulting engineers

Location
United Arab Emirates - Dubai
Education
Master's degree, Project Manager Professional PMP
Experience
24 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 9 Months

Senior Str. Designer & Area Resident Engineer at Jouzy Consulting engineers
  • United Arab Emirates - Dubai
  • My current job since April 2016

Work Experience at Jouzy Consulting Engineers (An Axianta Dubai Branch (Consultant).Dubai, Apr.2016-(ongoing). ( Probation )

Senior Str. Designer | Area Resident Engineer

Responsibilities of Four predecessors: (Building director + Head of Str. Dept + Junior str. engineer + senior draftsmen) were transferred to me in a short time as the company adopt a new policy to reduce overhead expenses.

High Rise Reinforced Concrete Towers - Structural Designer & Resident Engineer

• Sterling Towers (East & West) 2B+G+25 Residential building.

The Client is OMNIYAT.
Resident Engineer & Design Manager : Review the str. & arch. design dwgs., participate with the str. design team, 3rd party & piling contractor to gain the piling approval & building permit from DM, managing site activities as Resident Engineer & preparing weekly MOM.

• Langham Place Hotel Apartments (3B+G+P +Two towers hotel apartment 13 Typical & 22 Typical floors). The Client is OMNIYAT. Resident Engineer & Design Manager : Same as above in additional to assist the shoring contractor to redesign & re-anchoring of shoring piles.


• THE IBIS STYLES HOTEL at Al Gaddaf B+G+5P+14. The Client is MAWARID FINANCE - PJSC
Str. Design Engineer Preparing preliminary structural concept design & structural guidelines..

• MUSANADA Civil Defense building, - Abu Dhabi: G+1 with Steel Str. Framing Structure.

Str. Design Engineer : Preliminary to detailed design of Steel Shed 45mx31mx 8.5m for Fire Trucks Garage

• Alrawda 2 Twin Towers G+5P+ TYP 31 & TYP 32
Str. Reviewer: Review of Structural design drawings to implement the necessary corrections and revisions.

• Mondrian Hotel 3B+G+M+4Podiumns +30 Floors (16 Hotel FL + Mech. FL + 14 FL Hotel Apartments).
Resident Engineer, Str. Design Eng. & Draftsmen: Design and drafting of piling layout. Generate the full str. detailed drawings. Managing the design meetings with client representative, PM, enabling contractor and arch. designer SWA\ Qatar.
• Dubiotech, Dubai Biotechnology & Research Park : Full set of detailed str. drawings for Drop Off area and Project Management

SENIOR STRUCTURAL DESIGNER [UNLIMITED]/ AREA RESIDENT ENGINEER at ALHAZMI & ASSOCIATES ENGINEERING CONSULTANTS
  • United Arab Emirates - Dubai
  • January 2011 to April 2016

High Rise Reinforced Concrete Towers - Structural Design & Site Supervision
• (As a Designer ) Structural Design of Qaiwan Mall Extension (2B+G+3Podium Mall+13 Residential Tower) at Sulaymaniya - Iraq.
• (As a Designer ) Structural Design of MBA (1B+G+12 Residential Tower) at Dubai - UAE.
• (As a RE/Designer) Structural review for Court Tower (4B+G+3P+29 Office Tower) at Business Bay - Dubai.
• (As a RE/Designer) Structural review for Exchange Tower (3B+G+ 3 Podiums+28 Office Tower) at Business Bay - Dubai.
• (As a RE/Designer) Redesign, supervise on construction, full technical review of arch./structural drawings & other contractual documents like specifications, agreements, for THREE Irregular Projects (Offices Towers) at Business Bay, Exchange Tower 3B+G+ 3Podiums+28Floors, Court Tower 4B+G+3Podiums+29Floors & Forum Tower 5B+G+3Podiums+31Floors to TANMIYAT GROUP.

Low Rise Reinforced Concrete Building - Structural Design & Supervision
• (As a Designer) Structural Design of MUDON Grocery (G+2) & Health club

Construction Operation Manager / Senior Structural Designer at KHUDAIRI GROUP
  • United Arab Emirates - Dubai
  • January 2011 to February 2013

- BIDING & PROPOSALS
• Create basic & detailed architectural & structural design concept by interpret tender documents & related SOW.
• Manage to achieve well-prepared technical offers by making detailed BOQs & BOMs incorporated with design concepts to minimize wide margin of pricing uncertainty.
• Collaborate with procurement team to emphasize well-prepared commercial offers.
DESIGN & DRAFTING
• Create full set of structural working drawings, structural specifications & method statements.
• Residential and commercial RC buildings, palaces, villas rested on shallow or deep foundations as well as several industrial steel structures.
• High rise Towers & Low rise building design.
• Interior Design
TECHNICAL
• Prepare and interpret specifications, regulation, method statements, agreements, cost estimates, etc.
• Manage multi-projects, present solutions for design problems on-site; ensure bilateral communication.
• Perform engineering duties applied to the design, maintenance and construction & leading to accomplish the detailed processes and coordinating information.

- Structural Engineering, Designing & Drafting.
- Contractual abilities.
- PROPOSAL SUBMISSIONS, QUOTATIONS, Bidding submission experiences & tendering evaluation for EPCC for Oil & Gas projects .
- Project & Construction Management.
- Construction cost estimation.
- Area Resident Engineer.
- QAQC.

EPC PROJECTS, Management
• Project Manager for THREE Degassing Stations at Bai-Hassan Oil Field - Kirkuk - Iraq, for North Oil Company.
• Project Manager for Installation of Emerson’s Multi-selector Manifold for Petro-China - Halfaya Oil Field - Iraq.
• Manage, Design & Built with detailed civil drawings & detailed BOQ for Halliburton Acid Plant (25x18x1.35m Bunded slab having plinths to support acid & water tanks) at Burjisiya - Basrah - Iraq.
• Supervise & review the design concept, detailed drawings, plans, RFPs, tests’ reports, MOMs for Ajeel Degassing Station Project (Plot Area 220m x 105m), engineered & designed by Mott MacDonald for North Oil Company at Ajeel oil/gas field -150km from Baghdad - Iraq.
• Preparing a design of Khudairi Group Camp Layout with details at North Rumaila (area 5000sqm) for OSS, EPC & HM.

PROPOSALS - TECHNICAL OFFERS
• Submit detailed offer for Flour/ExxonMobil ( BOQ, Construction plans, schedule, man power S curve, etc..) for Air Instrument System Installation at West Qurna 1 Project located at Degassing Station (DS6, 7&8).
• Submit well-prepared technical offer for ExxonMobil includes a Priced BOQ and detailed arch., str. & MEP drawings) for Two Pipe-laydown Yards (400x400m) having Steel sheds 2x60mx40m, offices building, etc..) at Basrah/Iraq.
• Prepare a conceptual design for Mud Plant consist of 8 storage pits, 2 water pits and Mud mixer for Maissan - Iraq.
• Prepare a conceptual design for Acid Plant ( plot area 75m x 40m ) consist of 6 storage pits, 2 mixers & 2 water pits for Mid-Land Oil Company - Baghdad- Iraq.
• Prepare 2x2.5 MW & 2x5 MW power plant preliminary schematic design at Nafet-Khaneh & East Baghdad Oil Field- Iraq.
• Propose accommodation camp, offices & ware house laydown yard for General Electric Oil & Gas at North Rumaila - Iraq.
• Propose design of steel structure coverage storage shed - Halliburton Camp - Burjisiya - Basrah - Iraq.

Interiors, Design & Supervision
• Complete design and supervise of Khudairi Group Dubai Branch Office (EPC, Oil & Gas) - 5500sqf at JLT - Dubai.

HEAD OF DESIGN DEPARTMENT at ALDAYER UNITED COMPANY FZE
  • United Arab Emirates - Dubai
  • September 2010 to December 2010

PREPARE A FULL DETAILS AND SHOP DRAWINGS OF WEATHERFORD OIL CAMP AT BASRAH-NORTH RUMAILA - IRAQ. THE WEATHERFORD CAMP CONTAINS OF THREE HUGE INDUSTRIAL WORKSHOP, ANCILLARY BUILDING, SUB-STATIONS, GARAGES, ETC..THE MAIN ROLE IS TO SUBMIT TO THE PROJECT MANAGER AND CLIENT THE FULL DETAILS DESIGN AND STEEL AND RC STRUCTURAL SHOP DRAWINGS FOR ALL THE BUILDINGS ILLUSTRATED ABOVE AS WELL AS ALL MEP DETAILS.

• Architectural and structural Design of G+4 car parking building of (125x54m) supported on pile foundation for Basra Times Square Project - Basrah - Iraq.

DEPUTY PROJECT MANAGER / FITOUT WORKS at MODERN DESIGN CONTRACTING COMPANY
  • United Arab Emirates - Dubai
  • May 2009 to August 2010

RENOVATION AND FIT OUT WORKS FOR EIGHT FLOORS OF DUBAI ECONOMIC DEVELOPMENT HAVING EACH FLOOR DIFFERENT INTERIOR DECORATION DESIGN .

SENIOR STRUCTURAL DESIGNER / AREA RESIDENT ENGINEER at OMAR MOUJAES ARCHITECT
  • United Arab Emirates - Dubai
  • July 2006 to April 2009

Structural Designer / Consultant Engineer
-Structurally designing, supervising and inspecting on palaces, villas and multi story residential and commercial buildings as listed below:
H.H. Sheikh Mansour Bin Zayed Palace, G+1, Abo Dhabi
Tarek Khansaheb Luxury Palace, B+G+1, Dubai
Dr. Rashid Machawi Luxury Villa, G+1, Dubai
Private Palace (G+1), AbuDhabi
Mushtaq Vakil Private Villa (B+G+2)
Anwahi Typical 3 Private Villas (G+1)
Anwahi Parents Private Villas (G+1)
Salem Al-Sha’aer Two Private Villas (B+G+1)
Suneel Private Villa (B+G+1)
DIP Showrooms (B+G+M)
DIP Hotel (B+G+5)
DIP Offices (B+G+5)
DIP Accommodations (B+G+5, 2B+G+3, B+G+5)
Al-Tayer Offices (3B+G+M+3)
Mahesh Tourani Private Villa (G+1)
E84 Private Villa (B+G+1)
Indigo Metro 1, 2, 3, 4, 5, 6, 7 and 8 (B+G+1) Showrooms
Abo-Ghazalah villa (B+G+2)
Al-Barsha Residential Building (B+G+6 +S.P.&GYM)
10 Typical Villas (G+2)
Emirate British Nursery (G+1)

DEPUTY RESIDENCE ENGINEER at USA CORPS OF ENGINEERS (USACE)
  • Iraq - Basra
  • November 2004 to June 2006

Deputy Resident Engineer at BRO Office
-Supervision and inspection many of big rehab and new infrastructure projects.
-Assuring the performance of contractors with the contract documents, scope of work and specification.
-Over sighting and monitoring site construction activities and liaison with contractors’ QC & site engineers.
-Preparing the setting out plan and full structural drawings of Al-Faw Combined HQ of overall area 170m x 110m on Shat al-Arab coast.
-The handled projects are :
•CPS Substations 1, 2, 3, 4, 6, 9 (Phase I) and 5, 7, 8, 10 (Phase II) (Rehabilitation project -$15M-USD, Siemens, Shams Al-Sabah.
•Aspen Road Project (106km) (New $32M-USD), Khudary Group Contracting Co. KGCC; Al-Batat Co.
•Al-Faw Combined Head Quarter (New-$565, 282 USD), Ebadi Group.
•Al-Rumaila Police Station (Rehab -$97, 750USD), ACAD Advanced Engineering Co.
•Al-Huwyer P.S (Rehab-$157, 450USD). Al-Mahdy Co.
•Al-Dorah P.S (New-$257, 390USD). Al-Ratbaa Co.
•Railway Station Rehab Project: Al-Rumaila Railway Station ($112, 257 USD), Artawi R.S (109, 560 USD), Al-Shuaiba R.S ($104, 370 USD), Al-Zubair R.S ($98, 780 USD), Tuba R.S ($107, 200 USD). Parallel Coordinates Company PCC.
•Sweet Water Canal Repairing Project. Washington Group, Snafi Group.

Structural Designer,Project Engineer & Quantity Surveyor at Consultant Bureau for Engineering College / Basrah University
  • Iraq - Basra
  • August 1999 to October 2004

-Prepared structural design drawings and analyze for several multi-story RC buildings using software packages such as, PROKON, STAAD PRO, SAFE, and ETAB.
-The handled project are:
•The Deanery of Law College - Basrah University
•The Deanery of Pharmacy College-Basrah University
•The Deanery, A Closed Hall, An Expansion at Veterinary Medicine College- Basrah University
•A Closed swimming hall and Studying Halls of Sporting Education College- Basrah University
•The Branch of Al-Rasheed bank in Qalat-Skr Country at Thi-Qar City
•The Touristy Hotel, A Cafeteria and Frontal Gate of Disney land at Al-Fao city Basrah City
•Blood Bank building- Maisan City
-Prepared formal tenders for renovation of 9 primary and secondary old schools for human organization named ENGINEERS WITHOUT BORDERS as part of Iraqi building renovation project.
-ed the structural sketches for industrial shed (40m x 66m ea) for enhancement the crane uplift forces from 5 ton to 15 ton including gantry girder, brackets, columns and footing.

-Supervised on the construction of storing sheds and a shed of crane girder of 50 ton for Ibn-Majed Company/ Basrah.
-Chief surveyor in establishing layout works of huge governmental building(28000sq.m) in Basrah City
-Surveyor in establishing layout works for irrigation canals and transport benchmark in agricultural areas.
- Fully supervised on construction and preparing contract documents as well as sections and details for a large local RC building Al- Mukhtar Masjed “(3000sq.m) in Basrah city.

Education

Master's degree, Project Manager Professional PMP
  • at Society of Engineers - Dubai
  • May 2014

1-PMP (35 BTU)(Project Management Professional-PMBOK) FOR THREE MONTHS 2- FIDIC 1999 RED BOOK

Master's degree, M.Sc. in Structural Engineering
  • at Basrah University/ College of Engineering
  • June 1998

(1st rank in civil dept.) M. Sc. Degree Structural Eng (1998). B.Sc. Degree Civil Eng. (1996) at Basrah University, Engineering College.

Bachelor's degree, B.Sc. in Civil Engineering
  • at Basrah University / College of Engineering
  • June 1996

( 1st rank in civil dept.)

Specialties & Skills

Software Packages
Civil Works
Construction Drawings
Engineering Drawings
MS Project, Primavera
ETABS,SAFE,PROKON,SAP,STAAD Pro,AUTOCAD
Codes and Specifications ACI318-05/IBC 2003, UBC 97, BS8110-97, BS5950-2000
EPCM TURN KEY FIDIC silver book 99
Etabs, SAFE, PROKON, STAADPRO, AutoCAD, etc..
FIDIC RED BOOK
Site Management
Structural Design & Analysis
Solving Technical Problems
Microsoft Office
MS OFFICE Programs
FIDIC RED BOOK

Languages

English
Expert
Arabic
Expert

Memberships

UAE Society of Engineers
  • Structural Engineer
  • October 2006
Union of Iraqi Engineers
  • Civil Engineer
  • July 1996
Dubai Municipality
  • G+Unlimited Structural Design. Licensed & Accredited from DM for str. designing of unlimited high r
  • March 2012
CED TRAKHEES
  • Quality Control Accreditation - GREEN BOOK
  • April 2009

Training and Certifications

Conflict Resolution in the Workplace Training (Training)
Training Institute:
Compliance Training Group
Date Attended:
February 2014
Duration:
2 hours
Design of G+Unlimited high rise towers - Dubai Municipality (Certificate)
Date Attended:
March 2012
Valid Until:
January 9999
Integrated Management System ( ISO 9001, ISO 14001 & OHSAS 18001) (Certificate)
Date Attended:
October 2014
Valid Until:
January 9999
Advanced Microsoft Excel Proficiency Seminar (Training)
Training Institute:
Khudairi Group
Date Attended:
August 2014
Duration:
16 hours
Construction Project Management Program - PMBOK - 5th Ed. (Training)
Training Institute:
Cambridge Institute - Dubai
Date Attended:
August 2014
Duration:
35 hours
Project Management Professional PMP - Society Of Engineers - Dubai (Certificate)
Date Attended:
January 2009
Valid Until:
May 2009

Hobbies

  • Reading News,