Project manager
Giza Cable industries
Total years of experience :16 years, 11 Months
project Manager
Description:
Morocco Project: - Construction of the 400 KV Chichaoua - Agadir lot 1 & 2 (160 km ) ongoing Project
Owner the National Electricity Office.
Project Contract: 50 million Dollars (US D).
Responsibilities:
Planning for project.
Budget control for the project.
Procurement for the project.
Manage the project (site management ).
Site supervision.
OSP Fiber Optic projects Specialist:
Aerial (ADSS & OPGW),
Project Scope:
- Supply and Erection for 45Km of ADSS Fiber Optic Cable on 66Kv Towers in Cairo Area
including Survey to report the needed fitting, ADSS Design by special software to choose
the proper point for fixation on the tower and splicing, Testin and Handing over for the
Client..
Responsibilities:
- Detailed Survey
- Planning
- Executing
- Monitoring & Control
- Commissioning
Mange a team of (35) including seniors site engineers fresh graduated site engineers, technicians, workers....etc .As a site manager with aid of my projects manger that established the installation works of project of (Elowaynat zone 13 & 3 Owned to Alzahra company), medium voltage dist (22KV) Project. That’s feeding zone by electrical power via (medium voltage underground cables-medium voltage over head transmission lines- galvanized steel poles-dist transformers .......etc) & Maintenance of existing electrical networks and change from 11 KVnmctn to 22 KV, Maintenance of transformers.
Installation of the main distribution panel and include a 12-cell.
•Put timeline for the project, Put the cost of the project, Schedule procurement, Put the breakdown of each Activity, Negotiating with contractors, subcontractors, make interviews with the owner and consultant .
• Plan, organize, and direct the activities for the project.
Power Distribution In East Owaynat
Mange a team of (25) including seniors site engineers fresh graduated site engineers, technicians, workers....etc .As a site manager with aid of my projects manger that established the installation works of project of (Elowaynat zone 5) medium voltage dist (22KV). Project. That’s feeding a military zone by electrical power via (medium voltage underground cables-medium voltage over head transmission lines- galvanized steel poles-dist transformers .......etc).
- Mange a team of (40) including fresh graduated engineers, technicians, workers....etc as a senior electrical site engineer with aid of my projects manger that established the installation works of project of (Elowaynat zone 10 east ) medium voltage power dist (22 KV). Project. That’s feeding a military zone by electrical power via (medium voltage underground cables-medium voltage over head transmission lines- galvanized steel poles-dist transformers .......etc).
Mange a team of (40) including fresh graduated engineers, technicians, workers....etc as a senior electrical site engineer with aid of my projects manger that established the installation works of project of (Elowaynat zone 21 east ) medium voltage dist (22KV). Project. That’s feeding a military zone by electrical power via (medium voltage underground cables-medium voltage over head transmission lines- galvanized steel poles-dist transformers .......etc )
Work as a site engineer in communication design department at several sites such: the metro (net work), palm hills (FTTH) Fiber to the home.
Work as a site engineer in communication operation department at several sites such that (Cairo airport, the metro, palm hills maintenance projects.
• Installation & testing OPGW cable .
• Final Testing using OTDR “Optical Fiber Time Domain Reflector “ .
• Make proper Test Reporting for Final Test .
• Installation and network design of FTTH systems .
Providing the main building of smart village by electrical power
Such (B-7) zone .the Egyptian company for communication. The project included several experience and dealing with several electrical systems such that (RMU) ring main units, emergency generators-lighting current equipments (like HVAC), security equipments (like: CCTV) and fire fighting equipments, control systems for whole projects.
• Connect electrical cables to the main station building, and to
provide testing and secured according to the specifications.
• Technical support for the operations department, and projects planing.
• Inatallaion (HVAC) And installation of control devices for (HVAC) to work in BM system .