Assistant Manager
Electrosteel steel Ltd. Vedanta
Total years of experience :19 years, 1 Months
Lime Plant (Operation) from April '18 to till date in Electrosteel steel Ltd-Vedanta
Coke Oven (Operation, 1.8MT/A)
fully automated German based LURGI Design.
Job Responsibility:
1.Site supervision with respect to DRI section like proper checking of welding of clits, anchors positioning, castable checking, air calibration of shell air fan, ABC fan, CB fan, lube compressor, nose cooling fan etc.
2.Knowledge of Wood firing, LDO firing, CO Gas Firing, coal injection to maintain temp., feeding of raw materials to obtain required product.
3. Sound knowledge about DCS system
Job profile-Sponge Iron division(SL/RL DRI, LURGI)
•Capacity-(350 x 02) TPD KILN.
•Dept.-Production(process)
Job profile-It is an Automotive plant with jointly collaboration of USA & India
•Capacity-01.Two Batch type Shield Quench Furnace.
02. One Rotary Hearth Furnace.
03. Two Tempering Furnace
04. Two Pit Furnace.
. Dept.-Heat Treatment (process)