Hammad Tahir, Electrical QA/QC Engineer

Hammad Tahir

Electrical QA/QC Engineer

NESMA ELECTRIC

Location
Saudi Arabia - Jeddah
Education
Bachelor's degree, Communication
Experience
15 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 8 Months

Electrical QA/QC Engineer at NESMA ELECTRIC
  • Saudi Arabia - Jeddah
  • My current job since May 2013

NESMA NATIONAL TELECOMMUNICATION Co. (Pvt) Ltd.
NESMA ELECTRIC, Jeddah-KSA
Electrical QA/QC Engineer (May 2013 - till to date)

Project: Installation of 110/13.8 KV Substation at KAUST, Thuwal Jeddah.
Client: Saudi Electricity Company (SEC) / Saudi Aramco

Project: Installation of 110/13.8 KV Substation at Jeddah Gate, Jeddah.
Client: EMAAR Middle East LLC / SEC

Project: Installation of 110/13.8 KV Substation at Jeddah Sea Port, Jeddah.
Client: Saudi Electricity Company (SEC) / Saudi Port Authority


Responsibilities:

1. Making quality control and quality assurance manuals according to Bid package.
2. Conducting meetings with Client and Consultant.
3. Successfully designing Quality Management system for the Organization.
4. Design Quality Control/ Assurance forms relating to the Client requirements.
5. Making inspections according to Engineering standards & organization QMS.
6. Performing field inspections in compliance with National Electrical Codes and approved shop drawings.
7. Successfully obtained ISO 9001:2008 QMS Certification for the Organization.
8. Performing Quality control inspection at the site.
9. Conducting internal audit of the Organization and audit inspection.
10. Working knowledge of quality and reliability concepts, supplier management, and general operations.
11. Experience developing process quality plans, supplier quality audits, and driving corrective actions and failure analysis efforts.
12. Experience in performing civil inspections, investigating and addressing customer requests regarding quality.
13. Ability to direct activities to ensure that construction, installation, and operational testing conform to functional specifications, recognized codes and standards, and customer requirements.
14. Ability to maintain effective communication with project team members and with the customer.
15. Ability to plan, organize, review and document wide range of project activities with good follow-through.
16. Accurate and detail oriented.
17. Demonstrated ability to work independently with minimal supervision.
18. Ability to manage deadline-driven workload.
19. Ability to work effectively in a diverse work force.
20. Fluent in reading, writing and speaking the English language

SITE ENGINEER at NESMA WATER & ENERGY
  • Saudi Arabia - Riyadh
  • August 2012 to April 2013

Project: Riyadh Water Supply Enhancement Program (RWSEP)
Client: National Water Company Saudi Arabia (NWC)

Responsibilities:

1. Execute project as per plan set by immediate management and accomplish the targets within deadline and budget.
2. Performing field inspections in compliance with National Electrical Codes and approved shop drawings.
3. Reviewing of workshop drawings for different electrical systems and installation.
4. Review engineering plans, designs and circuit diagrams for project, identify and propose improvements to existing installations of electrical systems.
5. Making request for inspection (RFI) for consultant.
6. Conducting quality assurance and quality control inspection.
7. Installation and commissioning of POWER PANELS, LOW VOLTAGE SWITCH GEARS, MCC PANELS.
8. Installation and commissioning of Main Distribution Boards, sub Distribution Boards.
9. Installation and commissioning of 1MV backup Generators.
10. Electrical installation of back boxes and conducts for normal lighting system, emergency lighting system, power system, and structure cabling system, fire alarm system.
11. Installation and fixing of Electrical opening trunking, cable tray, switches and cable pulling and ensuring the method is as per the related codes, specifications & international standards.
12. Review of electrical contractors installation work with reference to approved drawings.

QA/QC Engineer at BaalBeck International ( SAUDI ARAMCO PROJECT)
  • Saudi Arabia - Riyadh
  • August 2010 to June 2012

Project: King Abdullah Petroleum Studies & Research Center (KAPSARC)

1. Responsible for Plan, schedule and organize site staff, materials and activities as per the daily scheduled progress plan.
2. Making effective communication and work collaboratively with Client and
3. Contractor/Subcontractors in assuring work conforms with contract
4. Reviewing of workshop drawings for different electrical systems and installation.
5. Review engineering plans, designs and circuit diagrams for project, Identify and propose improvements to existing installation of electrical systems.
6. Making request for inspection (RFI) for consultant
7. Performing field inspections in compliance with National Electrical Codes and approved shop drawings.
8. Conducting quality assurance and quality control inspection & reporting.
9. Electrical installation of back boxes and conduits for Normal lighting system, Emergency lighting system, Structure cabling system and Lighting protection system, in ceiling, slabs and core walls.
10. Fire Alarm system, Public Address system, CCTV system, Security Door access system.
11. Installation and Fixing of electrical openings trunking, cable tray, switches, and cable pulling and ensuring the method is as per the related codes, specifications & International Standards.
12. Maintain control of project expenditures to avoid cost overruns also Supervise and train project team members as necessary.
13. Conducts field investigations and prepares reports for problems or issues and changes to site.

Electrical QA/QC Engineer at Saudi Binladin Group
  • Saudi Arabia - Riyadh
  • July 2009 to July 2010

Project: King Saud Bin Abdul Aziz University for Health & Sciences (Saudi Binladin Group)

1. Directing and managing the site staff and activities as per the daily scheduled progress plan, with quality assurance.
2. Attend and respond the Client Coordination and maintain updated record in progress logs.
3. Execution of Electrical Normal Lighting System, Emergency Lighting System, Emergency central battery (ECB), lighting protection system, Building management system (BMS), European integrated bus system (EIB) and complete Audio and visual system (A/V) works as per site condition.
4. Installation of Building management system trunking, conducting and wiring, Variable air volume controllers, relation box of Fan coil unit, Variable frequency drives (VFD), thermostat and carbon dioxide (CO2) sensors.
5. Installation of BMS panels and control cabling for sensors and actuators.
6. Execution of Heat Ventilation and Air Condition system on secondary basis.
7. Preparation of cable schedule from the single line and schematic diagrams.
8. Preparation of cable pulling schedule and lead the team for the cable pulling works, tagging and terminations.
9. Preparation of Load schedule and work out quantities before execution.
10. Installation of MV Panels, LV Panels, MCC Panels, UPS Panels, Capacitor Bank Panels, Inverter Panels, and all type of Distribution Boards & their cabling connection, Cable Tray, Lightning Protection, and Light Fittings.
11. Installation of electrical wiring and ensuring the method is as per the related codes, specifications and drawings from the client.
12. Conduct necessary testing of cables/wires and ensure the desired results are attained.
13. Quantity Survey of Electrical materials as per the drawings approved by the Client.

Electrical Engineer at Power intelligent Automation and Communication Engineering, Al- Khobar
  • Saudi Arabia - Eastern Province
  • September 2008 to July 2009

Project: Replacement of old distance Relays in number of Sub-stations in Wadi Al Dawasir - KSA.

1. Attend Project meetings to discuss tasks pertaining requirement and progress for the project and get approval on strategies for handling the project and team selection etc.
2. Coordinate between the company and the client also provides the customer their desire result and achieves customer satisfaction.
3. Coordinate and supervise all electrical activities and operations, required for project.
4. Execute project as per project plan set by immediate management and accomplish the project within deadline.
5. Installation of electrical equipment’s, panel boards and distance relays.
6. Remove the old panel and erection of new relay panel also interfacing between the new relay panel and substation was done.
7. Monitor the electrical works with the requirements of the Contract Documents, Procedures manual and/or Local & International Standards.
8. Monitor project progress to ensure quality and adherence to specific requirement to the client.
9. Prepare reports regarding project progress.

Education

Bachelor's degree, Communication
  • at NWFP University Of Engineering & Technology Peshawar
  • July 2008

• 2004 - 2008 • Bachelors of Science in Engineering (B.Sc.) -Electrical Engineering • NWFP University Of Engineering & Technology Peshawar Project/ Thesis: Simulation and Analysis of OFDM • OFDM (Orthogonal Frequency Division Multiplexing) • Modulation Technique for Fixed wireless Radio Applications. • Simulated to measure the performance of OFDM under different channels. • Using Mat lab software and Microsoft Visio.

Specialties & Skills

Technical Staff Management
Daily Operations
AUTOCAD
DEPLOYMENT
ENGINEER

Languages

English
Expert
Arabic
Beginner
Urdu
Expert

Training and Certifications

CCNP (Routing) (Switching) (Certificate)
Date Attended:
July 2006
Valid Until:
January 2007
CCNA (Routing & Switching) (Certificate)
Date Attended:
July 2005
Valid Until:
October 2005
Avaya Professional Sales Specialist (APSS - UC & CC) (Certificate)
Date Attended:
April 2009
Valid Until:
May 2009
SYSTIMAX Structured cabling system (SCS) (Certificate)
Date Attended:
December 2008
Valid Until:
January 2009
Avaya Professional Design Specialist (APDS - UC & CC) (Certificate)
Date Attended:
November 2009
Valid Until:
December 2009