Co- generation project Barri gas Plant (Aramco) :
- Issued weekly report.
- Specified locations of equipment (Evaporator, Economizer and Stack) As per IFC Mechanical Engineering
Drawings.
- Supervised repairing tubes of Evaporator and Economizer as per Scope of work.
- Oversee Crack Repair of stack as per Scope of Work.
- Involved in Pre-commissioning and commissioning by Penetrant Testing (PT)
- Communicated Coordinated with site project manager and client (Aramco).
• Strictly adhere to all safety rules, policies and procedures.
• Attended daily meeting with Supervisor and technicians to distribute and organize all tasks.
• Discussed and revised all progresses activates in daily basis.
• Discussed and applied and followed up safety rules and procedures to avoid incidents at site.
• Followed up Manual Procedure for overhauling rotating equipment such as horizontal centrifugal pump and gear pump.
• Prepared general work permit at site.
• Issued weekly training report about (PPE, Scaffolding, fire damage, OH6 overhauling, Gear pump
overhauling, mechanical seal, Heat exchanger) including writing case study for centrifugal pump.
• Involved with Elastomer Department in protective and corrective maintenance, also troubleshooting
activities.
• Built materials take off sheet of structural plywood sheets & wood.
• Made materials take off sheet of structural steel beams and sealing.
• Estimated materials take off sheet of tiles & concrete block.
• Calculated materials take off sheet of plumbers.
• Prepared materials take off sheet of power & lighting.
• Negotiated price sub-contract agreements regarding to the finishing work such as wall, tiles, concrete block & plastering works
• Input incomes and expenses data in daily base.
• Prepared weekly financial report.