Hany Farahat Mohamed Ahmed , MEP Project Manager

Hany Farahat Mohamed Ahmed

MEP Project Manager

LEEDS

Location
Egypt
Education
Bachelor's degree, electrical &control engineering
Experience
18 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 3 Months

MEP Project Manager at LEEDS
  • Egypt - Cairo
  • My current job since February 2016

Review the general contract and contract documents to update any amendments may occur.
 Maintain and manage all purchase and delivery schedules, change order processes, shop
drawings, document control logs, Owner, Architect and Subcontractor correspondence
 Attend all schedule and management MEP meetings necessary to monitor and manage the
project
 Follow Execution Phases & invoices with Client.
 Work closely with upper Management to make sure that the scope and direction of project.
 Plan, budget, oversee and document all aspects of the project.
 Deliver all warranties, as‐built and training to the owner
Period: March 2017 - March 2018 (Power Plant)
Company: IREM S.P.A/ LEEDS
Project: El‐Burullus 4800MW Combined Cycle Power Plant Project
Position: Electrical Construction Manager
Responsibilities:
Review Electrical systems & Equipment’s Drawing.
Co‐ordination delivery of Construction drawings, and Specifications.
Co‐ordination with Technical Office and Material Control Department
Co‐ordination delivery Materials from owner yard to arrive on site
Co‐ordination Between all works ‐ Civil, Mechanical to start in Electrical Work without any delay time
Co‐coordination Materials, Equipment and Consumables with Procurement.
Supervises the Execution Phases until the client received all the work done.
Electrical system:
H.V Transformer (Lifting plan, Visual inspection, Marking, Erection Radiators, Vacuum moisture, erection for
Bushing, oil Filling, etc.…)
Erection Medium Transformer and Low Voltage Transformers
IPBD (Isolated Phase Bus Duct): Erection and follow the alignment, welding Joints, covers.
PCC (Power Control Center) for turbine and Follow Erection, alignment, Welding Procedure, and termination inside
it
Cable Trays: ‐ Follow installation according the level, Sizing and specs.
Instruments P&IDs: ‐ follow the Drawing and Hook up Drawing to define exact location for every Rack Installation
and Device, Follow secondary routing.
Pulling Cables (M.V, L.V, Control Cables) and Termination.
Lighting System and Power Sockets.
Follow covering the Comments after QC Inspection.
March 2016
Company: LEEDS (Leaders in Energy & Electromechanical Developments & Services)
Project: Mall of Egypt‐ M.O.E (Carrefour and VOX Cinema)
Position: Electrical Construction Manager
Responsibilities :‐
Review shop drawings for all Electrical systems.
Co‐ordination delivery of Construction drawings, Materials, and Specifications.
Co‐ordination Between all works (Civil, Electrical, and Mechanical work).
Co‐coordination Materials, Equipment and Consumables Procurement.
Supervises the Execution Phases until the client received all the work done

مهندس مكتب فنى وتنفيذ at مجموعة البيان القابضة - شركة نهضة الإعمار
  • Saudi Arabia - Altaif
  • January 2014 to April 2016

HAIL & TAIF UNIVERSITY(HOSPITAL 520) BED at (K.S.A)
As Technical Office & site Construction Electrical Engineer from 2014 until now

- Proficiency Electrical calculations & voltage drop & short circuit current & Choose cables sizing and circuit Breakers.
- Responsible of all Electrical work in site (INFRASTRUCTURE WORK).
- Lightning Protection system & Grounding system.
- Preparing the Reports of the work.
- Coordination materials, equipment and consumables procurement.
- Coordination delivery of construction drawings and specifications.
Coordination Between all works (Civil, Electrical, and Mechanical work)
- Aware Medical Gases piping & system.

- Aware HVAC machine (air handling unit), Primary & secondary chilled water Pump, Boilers station, primary & secondary Boiler Pumps.

- Aware Water Supply Pumps System (Domestic Pump, flush Pump, Soft Pump, water Treated Pump, Reverse Osmosis Pump).

- Aware Fire Pump System (Electrical fire Pump, Jockey Pump)

Electrical Engineer (Technical Office & Site Construction) at Al Bayan Holding Saudi Group.
  • Saudi Arabia - Hail
  • February 2014 to February 2016

Company : DNGO - Al Bayan Holding Saudi Group. Saudi Arabia
Project : RCBU‐RIYADH STRATGIC RESEVORIS (3A, TGSW, SALBOUKH) @NATIONAL WATER Co.
Position : Electrical Engineer (Technical Office & Construction)
Responsibilities :‐
‐ Preparing shop drawings for all Electrical systems.
‐ Review and Study the Design Documentation of over Ground Steel Tanks Cathodic protection.
‐ Review And Check P&ID schematic Diagrams, signal list, instruments list for Process tanks.
‐ Review the Process Control Philosophy.
‐ Co‐ordination delivery of Construction drawings and specifications.
‐ Review and approves the sub contractors' Submittals, documentation.
Company : Nahdat Al Emaar Contracting Co. | Al Bayan Holding Group (K.S.A)
Project : HAIL & TAIF University Hospital (1500 Bed) - Saudi Arabia
Position : Electrical Engineer (Technical Office & Site Construction)
Responsibilities :
‐ Proficiency Electrical Calculations & voltage drop & Short circuit current & Cables sizing and
Circuit Breakers.
‐ Arrange the submittals as per specification and request the materials
‐ Responsible of all Electrical work in site (Infrastructural Work).
‐ Study and Preparing shop drawing for all Electrical systems.
‐ Co‐ordination materials, equipment and consumables procurement.
‐ Co‐ordination delivery of construction drawings and specifications.
‐ Co‐ordination between different activities (Electrical & Mechanical)
‐ Aware HVAC Machine (Air Handling Unit), Primary & secondary chilled water Pump, Boilers
station, primary & secondary Boiler Pumps.
‐ Aware Water Supply Pumps System (Domestic Pump, flush Pump, Soft Pump, water Treated
Pump, Reverse Osmosis Pump).

ELECTRICAL ENGINEER at مؤسسة الصملى للمقاولات
  • Saudi Arabia - Mecca
  • March 2012 to April 2014

Responsible of all Electrical work in site (Outlets, Cables, Panels Boards, Lighting Poles and Fixtures, Substation, B.M.S, Fire alarm system, motors, all Networks of layout).
Lightning Protection system & Grounding system.
Distribute work on technician and follow all works.
Preparing the Reports of the works.
Supervises the Execution Phases till the client received all the work done.
Preparing all invoices and variation orders.
Preparing the Reports of the work.
Coordination materials, equipment and consumables procurement.
Coordination delivery of construction drawings and specifications.
Making Electrical Shop Drawing.
Coordination Between all works (Civil, Electrical, and Mechanical work).
Re-design of Projects and submit them for approval from the owner for all systems
Study Budget, Project Pricing and Costing

ELECTRICAL ENGINEER at شركة مصر للصيانة للخدمات البترولية (صان مصر)
  • Egypt - Cairo
  • January 2011 to March 2012

Making Electrical shop drawing.
Coordination Between all works (Civil, Electrical, and Mechanical work).
Responsible of all Electrical work in site ( outlets, Cables, Panels, Lighting poles and Fixtures, Substation, Fire alarm system, CCTV, Data and telephone system, All Networks of layout).
Distribute work on technician and follow all works.
Aware with Cathode protection system.
Supervises the execution phases till the client received all the work done.
Preparing all invoices and variation orders.
Preparing the Reports of the work.
Coordination Materials, Equipment and Consumables Procurement.
Coordination delivery of construction drawings and specifications.
• Procurement and installation of sub-stations for QARUN (QPC) Petroleum Company.

ELECTRICAL ENGINEER at GES (Global Energy Service) Multinational Spanish Company For Wind Turbine
  • Egypt - Hurghada
  • January 2009 to January 2011

Electricals installations and Commissioning for the turbine.
Installations and Commissioning Hydraulic Systems for the turbine.
Installations and Commissioning PLC Phoenix contact RFC (430/450) With Inter Bus.
Installations and Commissioning Generators and motors.
Air Conditions for the Turbines.

ELECTRICAL ENGINEER at COCA COLA company
  • Egypt - Cairo
  • March 2008 to January 2009

Electricals installations and Commissioning for the machines & Robot.
Installations and Commissioning PLC - S7 with Profi Bus.
Installations and Commissioning Generators and motors.
Preparing the Reports of the work.
Coordination Materials, Equipment and Consumables Procurement.
Coordination delivery of construction drawings and specifications.

ملازم أول إحتياط at القوات المسلحة
  • Egypt
  • January 2006 to January 2008

خدمه إلزامية

Education

Bachelor's degree, electrical &control engineering
  • at Faculty of Electrical Engineering
  • May 2005

( VLSI ) Very Large Scale Integrated circuit PLC Control Systems SCADA (Supervisory Control and Data Acquisition) Microcontroller (MC68HC705C8A and PIC) Medical Electronics & INSTRUMENTION Real Time Control Systems Estimation Systems Distributed Control System (DCS Industrial Control Application

Bachelor's degree, Industrial Electronics and Automatic Control
  • at Minoufia University - Faculty of Electronics Engineering
  • May 2005

Degree: Good

Specialties & Skills

Maintenance Engineering
Electrical Controls
Electrical Engineering
Wind Turbines
Substation Automation
INTERNET
تصليح الأجهزة الإلكترونية والكروت الخاصة بها
AutoCAD Drawing
INTERNET NETWORK
MEP Project manager
Management

Languages

English
Expert
Arabic
Expert

Memberships

نقابة المهندسين المصريين
  • 60/07665
  • May 2005

Training and Certifications

appreciate (Certificate)
Appreciate (Certificate)
Date Attended:
May 2018
شهاده خبرة (Certificate)
Date Attended:
February 2018

Hobbies

  • القراءة والإطلاع على كل ما هو جديد
    تم قراءة عشرات الكتب الهندسية فى التخصص تم قراءة عشرات الكتب الدينية فى الفترة السابقة متابعة الأخبار السياسية فى العالم بشكل دورى وما يدور فى المنطقة العربية بشكل خاص