Project Engineer
Etihad Contracting Company
Total years of experience :17 years, 4 Months
• Supervision on all construction & finishing works (civil works).
• Project Management.
• Study tender for construction projects.
• Cost Estimation & Analysis.
• Cost control.
• Study contracts (Reviewed and analyzing contract conditions, specifications, drawings, cost, materials, and labor estimates).
• Preparation Bill of Quantities (B.O.Q.) for all construction & finishing works.
• To attend regular meetings with clients, and consultants and keeping them informed of progress.
• To resolve any unexpected technical difficulties and other problems that may arise at any time.
• Material Scheduling.
• Resource Mobilization.
• Attending Site Meetings.
Projects Involved in:
- Participation in construction & finishing works for 254 villas and buildings owned by "Wadi El Nile for contracting and real estate investments" at 6th October City, Total cost: 375 Million Egyptian Pound.
- Full design for more than 24 buildings at Egypt.
- Construction & finishing works for more than 20 residential buildings at Fayoum and 6th October city - Egypt, with budget (0.1 M - 35 Million Egyptian Pound.
- Participated in more than 35 bids (cost estimate, quantity survey) for construction projects with budget (0.1M - 20 Million Egyptian Pound).
- Maintenance works for Schools at Fayoum owned & supervision by General Authority For Educational Buildings in Fayoum-Egypt (0.1M Egyptian Pound)
Job Description:
• Project Management, Plan and schedule the work and efficiently organize the site facilities.
• Study tenders.
• Preparing bills of quantities for all next projects.
• To attend regular meetings with clients, interiors designer and consultants and keeping them informed of progress and to sort out technical problems if any.
• To resolve any unexpected technical difficulties and other problems that may arise at any time.
• Material Scheduling.
• Plan and schedule the work and efficiently organize the site facilities.
Projects involved in:
- Supervision on finishing works and full hotel supplies for Baitek Hotel Apartment (3 Stars) at Sharjah, UAE.
- Supervision on construction all concrete works & finishing works for Zomruda Villa (Ground+2 storeys) at Sharjah, UAE.
- Supervision on construction all concrete works & finishing works for Abu Nasser Villa (Basement+ Ground+2 storeys) at Sharjah, UAE.
- Participation on supervision on finishing works for Baitek Hotel International (5 Stars) at Media City, Dubai, UAE.
-Supervision on finishing works for Golf House Shop at Dubai Mall at Dubai, UAE.
- Supervision on finishing works (Turn-key project) for Aram Garage & showroom - Al Quoz- Dubai.
- Supervision on finishing works (Turn-key project) for Smith and Ken Real Estate Office, Concord Tower at Media City - Dubai
- Prepare bills of quantities
Job Description:
• Responsible for preparing full structural design, structural drawings and calculation sheets.
Achievements:
- Full Design of X-RAY Inspection Systems Station Project (administrative building) at Port of Nuweiba at Red Sea.
- Participation in design of Electric Station at Borg El Arab - Alex, owned by Kahraba company one of companies of NatGas Company.
- Participation in design some buildings (Zone B) at Marsa Alam owned by Emack Marsa Alam company one of companies of El kharafi Groups.
- Participation in prepare repair drawings for Kuwaiti Embassy -Cairo.
- Participation in prepare repair drawings for High Gate Hotel (building 2 and building 3) at Hurghada owned by Meritte group.
- Design retaining walls (Keystone blocks) for Allegria City at Sheikh Zayed City owned by Sodic Company.
- Participation in site grading works for Up Town Project at El-Moqatem, Cairo owned by Emaar Company.
- Participation in site grading works for Marassi Project at Sedi Abd El-Rahman, North Coast owned by Emaar Company.
- Participation in design El Hekma Tower (13 storeys) at Cairo owned by Eng. Walid Khairy.