general plumber
arabian castles group of company
Total years of experience :5 years, 4 Months
• Copper breezing and led gas welding and installation • PVC and Cast iron installation of sewer line and drainage and tank • treading machine operator • Installation of galvanized iron for water line • Installation of urinal and water closet and janitor sink • PPR type pipe fusion and installation • Socket type of pipe installation (solvent) • Grooving machine operator • Scissor left operator and man left operator
Pipe alignment and fit up and lay outing Pipe installation and support installation Pipe bevelling, cutting, grinding Support installation (dummy and tronion) Proper location or coordination of pipe line
Inspect machines or equipment for hazards, operating efficiency, malfunctions, wear or leaks
Conduct walk through the area with the main crew maintenance of the plant of which equipment to be removed and overhauled Initiatives alignment using reverse alignment and rim and face alignment Also installing of mechanical seals to the pumps, assemble and disassemble of mechanical seals. Keep and maintained quality control throughout in accordance to specification and standards. Maintained good housekeeping.