Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Harunur Rashid, Electrical Engineer

Harunur Rashid

Electrical Engineer·Simco sanitary & Electric Works

United Arab Emirates

Diploma, ELECTRICAL ENGINEERING

Work experience

Total years of experience: 40 years, 4 months

Electrical Engineer

August 2002 - Present

Simco sanitary & Electric Works

Dubai, United Arab Emirates

August 2002 - Present

Designation Electrical Engineer
Duration 17-09-1999 to 16-06-2002
Duties & Responsibilities
a) All kind of electrical & sanitary (mep) complain attended and solved successfully.
b) Identification of all kind of earth leakage (Houses, Industries, Commercial bldg etc.)
c) Good Knowledge in all wirings ( Residential, commercial and industrial)
d) Well experienced in Installation, testing & commissioning of all electrical equipments (AC motors, Ac machines, electrical pump etc.)
e) Installation, testing and wiring of all LV electrical distribution board.
f) Installation and wiring of CT meter.
g) Supervision of Laying and glean ding of LV cable for residential & commercial building and villa.
h) Laying of PVC conduit for concealed wiring.
i) Co-ordination with contractor and consultant and follow up all the work as per DEWA rules and regulation.


Concern Eastland Electrical Co. (pvt) Ltd
Designation Electrical Engineer
Duration 25/09/94 to 10/08/99.
Duties & Responsibilities
a) Carried out all types of electrical test such as insulation test, continuity test, earth resistance test and polarity test.
b) Winding of AC Induction motors, ceiling fan, exe-fan.
c) Testing of electrical fan ( insulation resistance test, RPM measured, air circulation measured etc)
d) Measurement of electrical power of ceiling fan.
e) Repair maintenance of all electrical equipments (Air condition, freeze, induction motor etc)
f) Installation, testing & commissioning of all electrical equipments (AC motors, Ac machines etc.)
g) Installation, testing and wiring of all LV DB, electrical switch boards, lighting & power circuit etc.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical Engineer

September 1999 - June 2002

Al Amal Electric & Sanitary Works

Dubai, United Arab Emirates

September 1999 - June 2002

Concern Dubai Electricity & Water Authority
Duration 20-08-2002 to till now
DUTIES & RESPONSIBILITIES
1. Installation, testing, commissioning, trouble shooting of 33/11 KV substation equipment, switchgear. Transformer, control/relay panel etc.
2. Carried out all type of electrical test of 33/11 KV transformer such as IR value of transformer, winding resistance of primary and secondary winding, ratio measurement and check the vector group, calibrate the winding and oil temperature indicator, polarization, oil over voltage withstand test etc.
3. 33 KV switchgear insulation resistance, circuit breaker insulation resistance, circuit breaker contact resistance, circuit breaker close and opening resistance, CB closing and opening timing test, bus bar contact resistance and high voltage pressure test, current and voltage transformer insulation resistance test are carried out.
4. Carried out of 11KV switch gear testing like 33KV switch gear testing as above.
5. Carried out of all functional check 33 and 11KV switch gear and check the bus voltage scheme.
6. Check the 33KV bus bar earthling interlock and closing interlock between 33KV and 11KV switch gear.
7. Laying of control cable from switch gear to control panel, gland in and wiring as per the wiring list.
8. Installation, wiring & commission of battery chargers.
9. Installation and commissioning of RTU for SCADA and SCADA checks.
10. Laying of 33 kV and 6.6/11 KV single core power cable inside 33 KV substation.
11. Established the Arc-protection system in the existing 33KV switch gear panel.
12. Co-ordination with Protection & Commissioning section for their pre-commissioning work.
13. Adding of 33 KV TRANSFORMER & FEEDER panel with existing panel and internal modification work.
14. Installation, testing and supervision of 33 kV and 11 kV Capacitor Bank
Works.
15. Modification of pilot protection circuit in control panel fixing guard relay before
Pilot protections relay (Solker R) CT circuit and then testing as per present requirement.
16. Testing of pilot cable taking measurement of loop resistence, inductance & capacitance under shut down.
17. Replacement of 6.6/11 KV 10 MVA old panel ( VEEM, SOUTH WELLS) by 15 MVA TAMCO panel inside the live sub station under partly shut down.
18. Replacement of 33KV Switch Gear and Control panel (old ENERGOINVEST. BBC, MITSUBISHI Panel) by ABB new panel inside the substation under partly shut down.
19. Follow Safety regulation and procedure for talking shutdowns and outage before stating site work


Worked Under Emergency Maintenance Section
Concern Dubai Electricity & Water Authority
Duration Six month at cable testing section.


Duties & Responsibilities
1. Carrying out LV, HV& EHV cable testing, cable fault location & rectification works using the sophisticated cable fault locating Instrument/equipment.
2. Attending Underground power & Pilot Cable Identification, route tracing, Insulation Resistance test, capacitance measurement and Continuity test during cable fault location/repairs.
3. Conducting High voltage AC, DC & VLF test on cables and Bus bar for the purpose of Voltage conversion, Circuit modification, pre commissioning and preventive maintenance.
4. Supervision of excavation group and jointing groups during excavation/Cable laying and Jointing/termination works.
5. Carrying out live phasing activities in 11kv networks wherever applicable followed by the safety rules.
6. Attending and assisting Engineer/Supervisor during attending emergency breakdown for Switch gear, Transformer, RMU, circuit Breaker and Isolator, to restore the power supply at the earliest.
7. Effectively troubleshooting, , fault finding, testing, repair and diagnosis the failure of Electrical Equipment and control Systems.
8. Attending Emergency/Schedule replacement work of RMU, Transformer and LVDB in the event of Fire/Flashover or Severe Oil leakage.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical Engineer

September 1999 - June 2002

Al Amal Electric & Sanitary Works

September 1999 - June 2002

Concern Dubai Electricity & Water Authority
Duration 20-08-2002 to till now
DUTIES & RESPONSIBILITIES
1. Installation, testing, commissioning, trouble shooting of 33/11 KV substation equipment, switchgear. Transformer, control/relay panel etc.
2. Carried out all type of electrical test of 33/11 KV transformer such as IR value of transformer, winding resistance of primary and secondary winding, ratio measurement and check the vector group, calibrate the winding and oil temperature indicator, polarization, oil over voltage withstand test etc.
3. 33 KV switchgear insulation resistance, circuit breaker insulation resistance, circuit breaker contact resistance, circuit breaker close and opening resistance, CB closing and opening timing test, bus bar contact resistance and high voltage pressure test, current and voltage transformer insulation resistance test are carried out.
4. Carried out of 11KV switch gear testing like 33KV switch gear testing as above.
5. Carried out of all functional check 33 and 11KV switch gear and check the bus voltage scheme.
6. Check the 33KV bus bar earthling interlock and closing interlock between 33KV and 11KV switch gear.
7. Laying of control cable from switch gear to control panel, gland in and wiring as per the wiring list.
8. Installation, wiring & commission of battery chargers.
9. Installation and commissioning of RTU for SCADA and SCADA checks.
10. Laying of 33 kV and 6.6/11 KV single core power cable inside 33 KV substation.
11. Established the Arc-protection system in the existing 33KV switch gear panel.
12. Co-ordination with Protection & Commissioning section for their pre-commissioning work.
13. Adding of 33 KV TRANSFORMER & FEEDER panel with existing panel and internal modification work.
14. Installation, testing and supervision of 33 kV and 11 kV Capacitor Bank
Works.
15. Modification of pilot protection circuit in control panel fixing guard relay before
Pilot protections relay (Solker R) CT circuit and then testing as per present requirement.
16. Testing of pilot cable taking measurement of loop resistence, inductance & capacitance under shut down.
17. Replacement of 6.6/11 KV 10 MVA old panel ( VEEM, SOUTH WELLS) by 15 MVA TAMCO panel inside the live sub station under partly shut down.
18. Replacement of 33KV Switch Gear and Control panel (old ENERGOINVEST. BBC, MITSUBISHI Panel) by ABB new panel inside the substation under partly shut down.
19. Follow Safety regulation and procedure for talking shutdowns and outage before stating site work


Worked Under Emergency Maintenance Section
Concern Dubai Electricity & Water Authority
Duration Six month at cable testing section.


Duties & Responsibilities
1. Carrying out LV, HV& EHV cable testing, cable fault location & rectification works using the sophisticated cable fault locating Instrument/equipment.
2. Attending Underground power & Pilot Cable Identification, route tracing, Insulation Resistance test, capacitance measurement and Continuity test during cable fault location/repairs.
3. Conducting High voltage AC, DC & VLF test on cables and Bus bar for the purpose of Voltage conversion, Circuit modification, pre commissioning and preventive maintenance.
4. Supervision of excavation group and jointing groups during excavation/Cable laying and Jointing/termination works.
5. Carrying out live phasing activities in 11kv networks wherever applicable followed by the safety rules.
6. Attending and assisting Engineer/Supervisor during attending emergency breakdown for Switch gear, Transformer, RMU, circuit Breaker and Isolator, to restore the power supply at the earliest.
7. Effectively troubleshooting, , fault finding, testing, repair and diagnosis the failure of Electrical Equipment and control Systems.
8. Attending Emergency/Schedule replacement work of RMU, Transformer and LVDB in the event of Fire/Flashover or Severe Oil leakage.
9. Carrying out safe and reliable Operation of Fuse switches, Isolator Switches and Earth Switches of RMU and Circuit Breaker During rectification/Repair works.
10. Carrying out functional test for 11&33kv C.B like contact resistance measurement, vacuum test, opening/closing timing test, opening/closing coil resistance measurement, Local/Remote operation etc.to avoid such incident during energization.
11. Preparing and carrying out schedule outage of Circuit breaker, Transformer, Ring Main Unit, LVDB and Switchgear.
12. Identifying over loaded circuits, condition monitoring of underground Cable system.
13. Preparation of cable fault reports, test reports, Failure analysis reports and recommendations.
14. Maintaining daily office work such as site activities, safety record, and Vehicle check list, Maintenance record of test Equipment/Instrument, Reconcilement of Jointing Materials and substation equipment spare Through Orion System and store related works.


WORKED UNDER PROTECTION AND COMMISSIONING SECTION

Concern Dubai Electricity & Water Authority
Duration Six month


Duties & Responsibilities
1) Carried out the different types of relay testing live and dead panel for commissioning work.
2) Different types of relay setting and configuration.
3) Primary injection for 11/6.6kv and 33KV switch gear as a pre commissioning test.
4) CT Mac curve, polarity test and ratio check
5) CT, VT IR value measuring.
6) Energy meter, amp meter, volt meter testing and setting.
7) Pilot cable loop resistance measuring.
8) Circuit Breaker closing and opening time measuring.
9) Bus-bar joint resistance measuring.
10) Preparing for all types of test report.


Concern Al Amal Electric & Sanitary Works

Job role:
Electrical Engineering

Electrical Engineer

September 1994 - August 1999

Eastland Electrical Co. (pvt) Ltd

Bangladesh

September 1994 - August 1999

Concern Dubai Electricity & Water Authority
Duration 20-08-2002 to till now
DUTIES & RESPONSIBILITIES
1. Installation, testing, commissioning, trouble shooting of 33/11 KV substation equipment, switchgear. Transformer, control/relay panel etc.
2. Carried out all type of electrical test of 33/11 KV transformer such as IR value of transformer, winding resistance of primary and secondary winding, ratio measurement and check the vector group, calibrate the winding and oil temperature indicator, polarization, oil over voltage withstand test etc.
3. 33 KV switchgear insulation resistance, circuit breaker insulation resistance, circuit breaker contact resistance, circuit breaker close and opening resistance, CB closing and opening timing test, bus bar contact resistance and high voltage pressure test, current and voltage transformer insulation resistance test are carried out.
4. Carried out of 11KV switch gear testing like 33KV switch gear testing as above.
5. Carried out of all functional check 33 and 11KV switch gear and check the bus voltage scheme.
6. Check the 33KV bus bar earthling interlock and closing interlock between 33KV and 11KV switch gear.
7. Laying of control cable from switch gear to control panel, gland in and wiring as per the wiring list.
8. Installation, wiring & commission of battery chargers.
9. Installation and commissioning of RTU for SCADA and SCADA checks.
10. Laying of 33 kV and 6.6/11 KV single core power cable inside 33 KV substation.
11. Established the Arc-protection system in the existing 33KV switch gear panel.
12. Co-ordination with Protection & Commissioning section for their pre-commissioning work.
13. Adding of 33 KV TRANSFORMER & FEEDER panel with existing panel and internal modification work.
14. Installation, testing and supervision of 33 kV and 11 kV Capacitor Bank
Works.
15. Modification of pilot protection circuit in control panel fixing guard relay before
Pilot protections relay (Solker R) CT circuit and then testing as per present requirement.
16. Testing of pilot cable taking measurement of loop resistence, inductance & capacitance under shut down.
17. Replacement of 6.6/11 KV 10 MVA old panel ( VEEM, SOUTH WELLS) by 15 MVA TAMCO panel inside the live sub station under partly shut down.
18. Replacement of 33KV Switch Gear and Control panel (old ENERGOINVEST. BBC, MITSUBISHI Panel) by ABB new panel inside the substation under partly shut down.
19. Follow Safety regulation and procedure for talking shutdowns and outage before stating site work


Worked Under Emergency Maintenance Section
Concern Dubai Electricity & Water Authority
Duration Six month at cable testing section.


Duties & Responsibilities
1. Carrying out LV, HV& EHV cable testing, cable fault location & rectification works using the sophisticated cable fault locating Instrument/equipment.
2. Attending Underground power & Pilot Cable Identification, route tracing, Insulation Resistance test, capacitance measurement and Continuity test during cable fault location/repairs.
3. Conducting High voltage AC, DC & VLF test on cables and Bus bar for the purpose of Voltage conversion, Circuit modification, pre commissioning and preventive maintenance.
4. Supervision of excavation group and jointing groups during excavation/Cable laying and Jointing/termination works.
5. Carrying out live phasing activities in 11kv networks wherever applicable followed by the safety rules.
6. Attending and assisting Engineer/Supervisor during attending emergency breakdown for Switch gear, Transformer, RMU, circuit Breaker and Isolator, to restore the power supply at the earliest.
7. Effectively troubleshooting, , fault finding, testing, repair and diagnosis the failure of Electrical Equipment and control Systems.
8. Attending Emergency/Schedule replacement work of RMU, Transformer and LVDB in the event of Fire/Flashover or Severe Oil leakage.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical Supervisor

August 1990 - August 1994

Simco sanitary & Electric Works

August 1990 - August 1994

Concern Simco sanitary & Electric Works
Designation Electrical Supervisor
Duration 07/08/90 to 28/08/94
Duties & Responsibilities
a) Carried out all electrical complain and solved successfully
b) Identification of all kind of earth leakage (Houses, Industries, Commercial bldg etc.)
c) Carried out in all Electrical wirings ( Residential, commercial and industrial)
d) Repair maintenance of all electrical equipments.
e) Well experienced in Installation, testing & commissioning of all electrical equipments (AC motors, Ac machines etc.)
f) Installation, testing and wiring of all LV electrical distribution board.
g) Repair maintenance of all electrical equipments (Air condition, freeze, induction motor etc)

Job role:
Electrical Engineering

Electrical supervisor

August 1986 - July 1990

Satata Refrigeration Suppliers

August 1986 - July 1990

Concern Satata Refrigeration Suppliers
Designation Electrical supervisor
Duration 02/08/86 to 15/07/90.
Duties & Responsibilities
a) All kind of consumers electrical complains he attend and solved successfully
b) Identification of all kind of earth leakage (Houses, Industries, Commercial bldg etc.)
c) Good Knowledge in all wirings ( Residential, commercial and industrial)
d) Repair maintenance of all electrical equipments.
e) Well experienced in Installation, testing & commissioning of all electrical equipments (AC motors, Ac machines etc.)
f) Installation, testing and wiring of all LV electrical distribution board

Job role:
Electrical Engineering

Electrical Engineer

January 1987 - January 1989

Eastland Electrical Co. (pvt) Ltd

Bangladesh

January 1987 - January 1989

Designation Electrical Engineer
Duration 17-09-1999 to 16-06-2002
Duties & Responsibilities
a) All kind of electrical & sanitary (mep) complain attended and solved successfully.
b) Identification of all kind of earth leakage (Houses, Industries, Commercial bldg etc.)
c) Good Knowledge in all wirings ( Residential, commercial and industrial)
d) Well experienced in Installation, testing & commissioning of all electrical equipments (AC motors, Ac machines, electrical pump etc.)
e) Installation, testing and wiring of all LV electrical distribution board.
f) Installation and wiring of CT meter.
g) Supervision of Laying and glean ding of LV cable for residential & commercial building and villa.
h) Laying of PVC conduit for concealed wiring.
i) Co-ordination with contractor and consultant and follow up all the work as per DEWA rules and regulation.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

ENGINEER

January 1986 - January 1988

EASTLAND ELECTRICAL CO

Bangladesh

January 1986 - January 1988

ATTACHED IN CV

Company industry:
General Engineering Consultancy
Job role:
Engineering

Education

Bangladesh Technical Education Board

January 1986

January 1986

Diploma, ELECTRICAL ENGINEERING

Bangladesh

DIPLOMA IN ELECTRICAL ENGINEERING Group Electrical Passing year 1986 Board Bangladesh Technical Education Board Course duration 03 years Division 1st division

KAZEM ALI HIGH SCHOOL

January 1978

January 1978

Diploma, Diploma in Electrical Engineering

Bangladesh

SECONDARY SCHOOL CERTIFICATE Group Science Passing year 1978 Board Comilla Board, Bangladesh Course duration 10 years HIGHER SECONDARY SCHOOL CERTIFICATE Group Science

Skills

Insulation
Expert
Insulation
Expert
Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert
Wiring
Expert
Wiring
Expert
Transformer
Expert
Transformer
Expert
ABB
Intermediate
ABB
Intermediate
AC
AC
APQP
APQP
C
C
CIRCUITS
Expert
CIRCUITS
Expert
ELECTRICAL DISTRIBUTION
Expert
ELECTRICAL DISTRIBUTION
Expert
INDUCTION
Expert
INDUCTION
Expert
MAINTENANCE
Expert
MAINTENANCE
Expert
TESTING
TESTING
WIRING
WIRING
Transformer
Expert
Transformer
Expert
Commissioning
Expert
Commissioning
Expert
Installation
Expert
Installation
Expert
Insulation
Expert
Insulation
Expert

Languages

Bengali
Expert
Hindi
Expert
Urdu
Expert
English
Expert

Training and Certifications

Training
first aid traning
dubai ambulance

Hobbies

  • Cricket