Mechanical Engineer - Technical Office Department
Al Bawani Co. Ltd.
Total years of experience :12 years, 9 Months
MEP Projects : Building Construction & Infra Projects.
1. Mechanical QC Engineer, Site Engineer, Technical Submittals, Oracle Aconex.
2. Building Construction Projects MEP ( HVAC, Fire Fighting, Plumbing and Drainage System in Residential, Hotels, Shopping Malls, Medical Hospital, Commercial and High Rise Buildings ).
3. Infra Projects Underground Dry & Wet Utilities MEP ( Sewerage, Storm, Potable, Irrigation, LPG, Hot Water, Chilled Water, Fire, LV & MV )
Worked as Mechanical Site Engineer Projects involved HVAC, Fire Fighting, Plumbing and Drainage, QC, Installation, Testing, Commissioning of ADS, CHW System, VRV System, Non VRV System, Material Submittal, Material Order, Follow up, Preparation of Drawing & Submittal to the consultant and Receive Approval, Preparation of testing and Commissioning Report, Method of Statement, BOQ, Work Progress Report, Project Completion Report, Helping Procurement team, estimation and Costing Team. Report to the project Manager. Complete Guide for CHW Pumps and its Systems, Fire Fighting Pumps and its Systems, Plumbing pumps and its systems Piping work for All MEP works, Ducting Work for both AC and Ventilation Systems.
HVAC Planning and Execution of CHW Centralized Air Conditioning, Oil and gas Power Infrastructure.
Collect Client Drawing, Review & Quantity Survey, Materials and Equipment's Price Inquiry. Cost Comparison of Equipment and materials and make Estimation and Cost Sheet.
Preparation of BOQ Proposal, BOQ Submittal to the Client and take Approval.
Shop Drawing Preparation by design team and Shop Drawing Submittal to the Client and take approval.
Materials Submittal to the MOI and take Approval, Order of Equipment and Materials and proper follow up. Arrange Manpower, Machines, tools, Store etc.
Collect Final Coordination Drawing and work Planning sheet, Preparation of own work Planning as per coordination work plan.
Preparation of Methods of Statement and submittal to QC Department.
Take Client Permission and Safety team Permission to start the work.
Deliver the materials to the site and ensure safe storage. Start the work Execution.
Attend Monthly Project Review Meetings (RPM) and alert the project team of any potential problems.
As Build Drawing Submittal and Approval. Request for Inspection and Inspection Approval. Claim cost Deviation, Hand over the Project.
Installation of all kinds of Centralized HVAC System, Air Distribution Systems, and Chilled water Pumps and its Piping work, Welding test, Plumbing and its Pumps.
Installation, Testing, Commissioning of Chemical Dosing Systems for CHW Pumps.
Installation, Testing, Commissioning of CHW Pumps. Plumbing Pumps, ADS Test and other MEP Equipment test.
Installation, Testing and commissioning of FCU, AHU, ERU, TFA, VRV Ductable and Non Ductable, CAV, Smoke Spill Fans, Evaporative Air Cooling Units, Exhaust & Fresh Air Fans such as Forward Curved, Backward Curved, DIDW Fans and its Ducts.
Installation, Testing & Commissioning of Plate type Heat Exchanger.
Coordinate all aspects of project with Civil, Structural and electrical Services. Handled Max 75 Manpower along with a Supervisor and 3 Foreman.
Able to work independently and contribute for the team excellence as well.
The use of sense of responsibility and commitment and Flexible.
Successfully Completed 5 Projects and Handed over to the client.
ALL Kinds of HVAC PROJECTS
HMS INSTITUTE OF TECHNOLOGY TUMKUR. KARNATAKA INDIA.